HomeMy WebLinkAbout2013 Scarecrow Rd - Disclosures/Blower Door Test - 01/26/2015G,S`Sbr--
Date of Test: 1/26/2015
Customer: Bellisimo Construction Inc
Fort Collins, CO 80526
Test Results
1. Airflow at 50 Pascals
(50 Pa = 0.2 w.c.)
2. Leakage Area:
3. Building Leakage Curve:
BUILDING LEAKAGE TEST
GS Services Ltd
2000 S College Ave.
Suite 308
Fort Collins, CO 80525
A 00
Test File: Bellisimo Construction - 2013 Scarecrow - UnitA - BD
Technician: Phil Sietz
Project Number: Unit A
Building Address: 2013 Scarecrow
Fort Collins, CO 80525
977 CFM50 (+/- 0.7 %)
3.53 ACH50
53.7 in2 LBL ELA @ 4 Pa
Flow Coefficient (C) = 72.0 (+/- 4.9 %)
Exponent (n) = 0.667 ( +/- 0.014 )
Correlation Coefficient = 0.99979
4. Test Settings: Test Standard: RESNET Multi -Point Test
Test Mode: Depressurization
5. Accuracy Level Standard Level of Accuracy Test
Infiltration Estimates
1. Estimated Average Annual Infiltration Rate: 55.2 CFM
0.20 ACH
2. Estimated Design Infiltration Rate: Winter: 89.0 CFM Summer: 59.1 CFM
0.32 ACH 0.21 ACH
Cost Estimates
1. Estimated Cost of Air Leakage for Heating:
2. Estimated Cost of Air Leakage for Cooling:
2FEB 15 4:37PM
D -/�:-_ .
Digitally signed
Paul by: Paul Higman
R-ICN = Paul
Higman2gmanC=US
e Dale: 2015.01.27
12:53:43-06'00'
GS Services
�,.-- -- BUILDING LEAKAGE TEST P4EPe k40u
Date of Test: 1/26/2015 Test File: Bellisimo Construction - 2013 Scarecrow - Unit - BD
Building Information Location Climate Information
Volume
j 16609
Surface Area
Floor Area
! 1622
Height
18
# of Bedrooms
3
# of Occupants
Year of Construction
2013
Wind Shield
M
Heating and Cooling Cost and Efficiency Information
Heating Fuel ! Gas
Heating Fuel Cost
Heating Efficiency %
Cooling Fuel Cost
Cooling SEER
Ventilation Weather Factor
0.87
Energy Climate Factor
17.00
Heating Degree Days
6128
Cooling Degree Days
297
Design Winter Wind Speed
7.3 mph
Design Summer Wind Speed
9.4 mph
Design Winter Temp Diff
73 deg F
Design Summer Temp Diff
15 deg F
Equipment Information
Type
Manufacturer
Model
Serial Number
Custom Calibration Date
Fan
Energy Conservatory
Model 3 (110V)
I
Default
L �. f J
GS Ser3tiGes
-.- BUILDING LEAKAGE TEST Page 3 of 4
Date of Test: 1/26/2015 Test File: Bellisimo Construction - 2013 Scar 3ro nit' ALBOO
Depressurization Test:
Environmental Data
Indoor Temperature (A°F)
Outdoor Temperature (A°F)
Altitude (ft)
70.0
1 66.0
5000.0
Data Points
Nominal Baseline Adjusted Fan Nominal Adjusted
Building Pressure Building Pressure Pressure Flow Flow Fan
(Pa) (Pa) (Pa) (cfm) (cfm) % Error Configuration
-1.1
n/a
n/a
-59.9
-58.7
33.9
1060
1086
-0.1
Ring A
-54.7
-53.4
30.0
998
1023
0.2
Ring A
-49.2
-48.0
244.4
925
948
-0.2
Ring B
-43.6
-42.4
207.1
852
874
-0.2
Ring B
-36.9
-35.7
164.6
761
780
-0.1
Ring B
-31.0
-29.8
128.8
674
691
-0.1
Ring B
-24.8
-23.6
97.0
585
600
1.2
Ring B
-19.1
-17.8
63.8
476
488
-0.8
Ring B
-1.4
n/a
n/a
Time Averaging Period: 0
Deviations from Standard RESNET Multi -Point Test - Test Parameters
None
GS Services ,
r.---- — BUILDING LEAKAGE TEST Pa�4
Date of Test: 1/26/2015 Test File: Bellisimo Construction - 2013 Scarecrow - Unit A - BD
Comments
House WRT Garage = 45.Opa
Targets:
0.3ach50 = <830 cfm50
0.4ach50= <1107 cfm50