Loading...
HomeMy WebLinkAbout2933 Joseph Dr - Disclosures/Mechanical - 09/23/2014j31y®Zo77 Gity of Fort Collins Residential Mechanical Systems Pertormance Report This form Is a record of tesfinq targets and results. with Pass/Fail outcomes. For Information on measurement tools and lestino lechnioues. see the "Residential New Construction Mechanical Systems Testing Guide." The guide and this form may be periodically updated: check the Building Services web site for the current version. This form must be completed and signed by an "Approved Agency, and submitted to Building Services as a requirement for receiving a C.O. Color key Target Measured value Other to compare with Pass Fail Caution or limit target or limit data Address Builder ✓ J JI HVAC contractor As -built changes vs mach design submittal Testing date(s) Bath exhaust ADCF = Air Density Correction Factor, based on tool, ADCF altitude (5000'), air temperature through tool Volumetric flow (CFM 5000) = ADCF x Indicated flow (CFM) Date of "Residenllal Mechanical Systems Design Submittal" information referenced by testing technicians Testing tech (inftfals)L_L-1 Flow —Flow box _ Pilot tube duct traverse Air temp 5 ADCF r1�1 tool Passive flow hood —Other (note below) through tool (F) � t l V Measured Airflow Design Airflow Minimum AlrflowRequirement Indicated Volumetric Exhaust PickupLocation (CFM (CFM 5600') Flow Flow Pass Fail 5000') +Type of Operation (CFM) (CFM 5000') .D X50Intermittent —20 Continuous 5 l� ❑ — 60Intermittent AO Continuous ,� 59 ❑ T/ 50 Intermittent —20 Continuous Cyr El 50 Intermittent —20 Continuous ❑ 10 50 Intermittent —20 Continuous ❑ I] 50 Intermittent _20 Continuous El El 50 Intermittent —20 Continuous ❑ ❑ Testing notes17e—n(� Kitchen exhaust NIA- hood does not vent to outside IX1 Testing tech (initials)I 1-sL=L rnl Oven fuel _Gas Electric Minimum airflow requirement (CFM 5000') + operation —100 Intermittent —25 Continuous Measured airflow Flow box _ Pilot tube traverse Interior grille Air temp P Flow — Passive flow hood _ Flow grid Tool Exhaust duct through ADCF tool — Powered flow hood Other note below location - - — ( ) (Fxreriorterm4ra6onratOK) tool(F) Indicated flo CFM Volumetric flow CFM 5000' ❑ Pass Iq Fail Testing notes Residential Mechanical Design Submittal V20140101 Page 1 e s�i. oo e�o�a For multiple 1Tsystems, attach one page per system System #I ' I Which parts of house does it serve? u Installed equipment (Be clear about which AC components are installed at time of testing) Testing tech (initials) Furnace or Boiler AC or Heat Pump Condenser AC or Heat Pump Coll Manufacturer L'&N (OX Pr N Model # Gy 05 u! 045A' E 51G$ Basic fiberglass Electrostatic Thickness MERV Filter — — brand S K�' Type Basic pleated _ Other. High-effic pleated (inches) (optional) Static pressures Setup Speed: _ Heating _ Cooling _ Cont. fan High -stage for mufti -stage equipment Blower speed tap: Humidifier damper: WA _ Open (Heating) _ Closed (Cooling) " A)I registers open *one dampers open SP1 a j AP Filter (SPI -SP2) Cooling: Measured air flow through indoor coil Design cooling airflow CFM 5000' (high stage) Measured airflow Testing tech (infials)54 I (Same location -SP4 to forNSOP- TFSOP) AP Coil ��tt (SP3-SP4) I V SP3Fit B AP Total ESP (SP3-SP2) 1 SP2 a XWA -- no AC installed Testing tech (initials)W Target airflow limits to CFM 5000' (design +/-15%) Air temp Flow grid _ 14 through ADCFNSOP❑ TFSOP� Flow rrecti stance plate size _ 20 too[ (F) Correction Factor Measured airflow, no CFM Indicated airtow CFM Volumetric airflow CFM �❑- Pass adjustment/correction Measured AFx FRCF Indicated AFx AOCF 5000' ij iFall notes Heating: Gas manifold pressure (high stage) Testing tech (initials) Manifold pressure OEM spec Q 5000' 2 - C J % IWC Target manifold P limits (spec +1- 5%) . to 13 �j��7 IWC Measured pressure 51 � 1 IWC Pass ,0 Fail Heating: Temperature rise Testing tech (initials) OEM temperature rise limits `, F (hgh stage) D t0 V Supply _ Return _ Temp �j� ��� Fail Caution: within 1oF Measured temps (F): air air® riseL_y� J /'J�\Pass of top of range Residential Mechanical Design Submittal V20140101 Pape 3 Controls i System Controls operating Per Design Intent Local exhaust (all fans) ❑ I NIA I Pass El Fail Whole house ventilation ❑ NIA Pass LI Fail Sub -structural tloor exhaust X NIA ❑ Pass 1F-f Fail Heating (all systems) ❑ NIA Pass ❑ Fail Cooling (all systems) NIA ❑ Pass ❑ Fail Technician #1 performing inspection and testing documented on this report (Approved Agency) i certify that the tests referenced above, in sections bearing my initials, were performed in accordance with protocols specified by the City of Fort Collins Building Services Department, and that the reported results are accurate to the best of my knowledge. Name (print) , c G hn Title CO nt 5 \Y Company Signature and Dale Technician #2 performing Inspection and testing doct)(r,1<En)ted on this report (Approved Agency) I certify that the tests referenced above, in sections beanTttj my initials, were performed in accordance with protocols specked by the City of Fort Collins Building Services Department, and that the reported results are accurate to the best of my knowledge. Na Signature HVAC Contractor (City of Fort Collins license holder) I certify that I have reviewed this report and that the lest results are an accurate representation of the performance of the installed mechanical systems. Na Signature Residential Mechanical Design Snhmittal V20140101 Page 6