HomeMy WebLinkAbout5021 Brookfield Dr - CO/LOC/Other - 09/24/2014City of
F6rt Collins
Community Development & Neighborhood Services
281N. College Ave
Fort Collins, CO 8o522
970.221.676o 970.224.6134 -fax
Temporary Certificate of Occupancy
Permit #: B1301737
Work Description: NEW MULTI -FAMILY 8 UNIT CONDO WITH OPTION 1 (DETACHED GARAGE)ON PERMIT
B1301738 STOCK PLAN 1961. ENERGY = RESCHECK MULTI -FAMILY WITH MANDATORY
BLOWER DOOR. FCLWD SEWER/CITY WATER. JOB CONTACT BOB BREX. REQUIRES THE
INSTALLATION OF A LEAD-FREE REDUCED PRESSURE ASSEMBLY BACKFLOW
PREVENTOR ON THE MAIN WATER SERVICE LINE IMMEDIATELY AFTER THE WATER
LINE ENTERS THE BUILDING. CORRECT BACKFLOW DEVICES ALSO REQUIRED ON FIRE
LINE AND IRRIGATION SYSTEM. NORM MILL NMILL@FCGOV.COM 970-416-2249
This is to certify that the building, ,structure, or land located at 5021 BROOKFIELD DR Fort Collins, CO has been
inspected and temporary occupancy is.herebyr authorized,,.effective on 09/24/2014 and conditional upon the
following requirements being completed 'a'nd'approved upon final inspection.
Zoning Final
be
FROM
THEEAST. THESE/
OF WAY MUST EITH
LJ \1_1
Ifsuchwork is not completed within the time set forth above and approved on final-iffspection, or unless the
time for completion is,extended by the Building and Zoning -Office, an order to-vacate-the-premisesll be
or a
/violation notice for nig occupy- the building, structure; or land without a Certificate of Occupancy will
issued. Such violation is`s Nect to a.maximum fine of $1000.00 per day for every day of violation.
2- zy--
Date
Authorized By, V Date of Issuance
NOTE: The issuance of this temporary certificate of occupancy will entitle the owner to place City Utility service in the owner's name. Construction power rates
may be substantially higher than the rate to which the owner is entitled. Until the owner contacts the City Utility Office and makes the necessary arrangements to
transfer City Utilities to the owners name, utilities will continue to be furnished at construction rates and both the owner of the property and the contractor will
continue to be liable to the City for all utility bills.
09/242014 01:09:11 PM Page 1 of 1