Loading...
HomeMy WebLinkAbout2320 Nancy Gray Ave - Special Inspections/Engineering - 03/30/2012T-�2 Structural Engineering LLc 1329 Fast Seventh Street, Loveland, Colorado 80537 Office (970) 663-6016. Fax, (970) 622-9324 March 30, 2012 Jamestown Builders, LLC 3003 East Harmony Road, Suite 400 Fort Collins, Colorado 80528 Foundation Reinforcement Observation The Truman 2320 Nancy Gray Avenue Lot 8, Block 20, Sidehill Subdivision Fort Collins, Colorado Project Number: 12-015-32 Dear Mr. Everitt: Yesterday, on March 29, 2012, a representative of this office visited the site referenced above to observe the foundation wall reinforcement size, and location and to confirm the vertical reinforcement spacing in foundation forms for both the house and the detached garage. The reinforcement appeared to be in general compliance with the foundation drawing and details by T2 Structural Engineering, project number: 12-015, dated March 23, 2012. There was a Ufer bar located on the east side of the house approximately two feet towards the north from the front basement wall. The Ufer bar was lapped and tied to the cf ntinuous bottom row of reinforcing steel. Protect freshly placed concrete from temperatures that will compromise the design strength of the concrete. Concrete placement and reinforcement is to be installed in accordance with ACI 318 and the 2006 IRC. Sincerely, Russell T. Zoetewey, E.I.T. 0 t/0 Susan Tagg, P.E` 40343 Enclosures 3 0 2012 d No Text No Text No Text No Text No Text