City of Fort Collins
Residential Mechanical Systems Performance Testing Submittal Form
This form is a record of testing targets and results, with Pass/Fail outcomes. For information on measurement tools and testing techniques, see the "Residential New
Construction Mechanical Systems Testing Guide." The guide and this form may be periodically updated; check the Building Services web site for the current version.
This form must be completed and signed by an "Approved Agency." and submitted! to Building Services as a requirement for receiving a C.O.
Color key
Measured value to
Target or limit
compare with target o
Pass
Fail
Caution
Other data
Adores 393 Bannock
Builde
HVAC contracto Noilhern Colorado Air
Bath exhaust
Testing date(s) 5 7
Airflow measurement metho blslow box Flow collar
Passive flow hood Pilot tube traverse
Temperature ofair throug�F Indicated flow to Volumetric flow multipli r
measurement
l .098rement too 7l 05000', air temperature
Operation
Minimum
Indicated
Exhaust Pickup Location
Intermittent or
Airflow
Flow
Volumetric Flow
PassFail
Continuous
Requirement
(CFM)
(CFM 5,000')
(CFM 5000)
master Bath
V4Mermit Conlin
50 cfm
66
72.468
A!�—
❑
U.L. Bath
erm0 _Conlin
50cfm
66
72.468
❑
Laundry
—AWermit Conlin
5O cfin
65
71.37
❑
Intermit Conlin
❑
❑
Intermit Contin
❑
❑
Intermit Contin
❑
❑
Intermit Conlin
❑
❑
Intermit Conlin
❑
❑
Kitchen exhaust
Oven fuel Gas
dNactnc
Exhaust airflow Minimum exhaust airflow requirementCFM 5000'
Operation _ Intermittent _ Continuous
Measured airflow
Airflow measurement method Flow box _ Flow collar
_ is
flow hood _ Pitot tube traverse I
l�
Temperature of air through t--�F Indicated flow to Volumetric flow multiplier
measurement tool t, ®5000', air temperature
Indicated flow f pFM Volumetric flowCFM 5000E::= ❑ Pass ❑ Fail
Testing notes (fan speed, masking
flow out of range, .. .
Mechanical Systems Performance Testing Submittal FormV20130321 1 or 6
Systems other than sub -structural floor exhaust
Minimum exhaust airflow requirement
FM 5000'
Indicated to
Measured Airflow
Volumetric
Design Airflow
Measurement
Measurement Location +
Flow
Indicated Flow Volumetric
(CFM 5000')
Method
Air Temperature(F)
Multiplier
(CFM) Flow
Pass/Fail
(CFM 5000')
ow box
Total exhaust airflow
_ Passive flow hood
_ Flow collar
Picot tube traverse
main Bath 70
1.098
75
N-35
_ Flow collar
Total supply airflow
— Pitot tube traverse
iW
W
_ Flow box
Passive flow hood
For systems In which supply airflow is circulatedyRhe air handier tan, fan speed for measuremen Heat Cooling Continuous fan
Balanced airflow in balanced systems
Average of measured suppl
and exhaust flow CFM 5000'
Sub -structural floor exhaust
Design airflow
❑ Pass
CFM 5000'
Target flow rang
(average +/- 15%) to CFM 5000'
❑ Fail
Measured airflow
Airflow measurement metho — Flow box Flow collar
11 _ Passive��flow hood — Pilot tube traverse
Temperature of air through �F Indicated flow to Volumetric flow multiplier
measurement tool ®5000', air temperature
Indicated flow CFM Volumetric flow CFM 5000' ❑ Pass ❑ Fail
) Maximum Allowed Duct Leakage ) Measured Duct Leakage )
Test Parameter and Conditions
Normalized Leakage
(CFM25 1100 at)
Absolute
Leakage
(CFM25)
Indicated Flow
(CFM25
Volumetric
Flow
(CFM25 5000')
Measurement
Timing
Air Handler
PasalFail
Total leakage
Rough -in
Excluded
4
❑
❑
Total leakage
Rough -in
Included
6
❑
❑
Total leakage
Complete
Included
12
❑
❑
Leakage to outdooreC
triplets
Included
8
1155
145
149.41
E.
❑
Mechanical Systems Performance Testing SubminrtFo V20120321 2 of 6
Bran koch
Static pressures (OPTIONAL)
Mode: Heating
ri6oling
Continuous Fan \\
Fan speed tap_ ``/ t"C`Ct�
Humidifier bypass Apen. Closed
hAll registers open ^
Zone dampers open
P=-
1
,V filter =
P=-.LDS
P=+
`W Total ESP = ' " — t..,�
Cooling: Measured air flow throu If indoor coil usirg flow grid
Design cooling airflo 92 ( CFM 5000' Target airflow limit (design +1- 15%) 783 to 1059 CFM 5000'
Measuretl airflow
Cooling fan speed tap Med-High
Temperature of air throng
measurement t..=
o %O F
NSOP == Pa TFSOP 19 Pa
Measured airflow, no adjustments or correction CFM
Volumetric to 1034.316 CFM 5000' Pass
Flow grid plate siz 14 20
Indicated flow to Volumetric flow multipli r
® 5000', air temperature l .098
Flow Resistance Correction Facto
Adjusted (indicated) airflo y=FM
❑ Fail
Heating: Gas manifold pressure
OEM manifold press IWC Tar et manifold ressure limits s 7
specification, 5000 3•� g ,Pq,/ (pec+/-5%),, to 3,G WC
manifold pressur 3 4x IWC /Id Pass ElFall
Heating: Temperature rise
OEM temperature rise limit 4 F
Measured temperature rise
Return air F
Temp rise 3O F
Mechanical Systems Performance Testing Submlttei
Supply air (()O F
❑ Pass NJ Fail
V20120321
❑ Caution: Temp rise within
10 F of top of range
3 of
(This section under development, not yet being enforced)
Supply air flows (This section under development, not yet being enforced)
Pressure balance
Pressure difference limit, room -to -core $ to +$ Pa
Room
Measured pressure
drop (Pal
Pass
Fail
master
+4.2
El
2nd Bedroom
+1.3
pw
El
3r_d Bedroom (front)
+1.7
Ej
Laundny
+0.2
❑
stud
+0.9
❑
Mechanical systems Performance Testing SubmlttillFo V20120321 1 of 6
Outdoor temperature F
Worst -case depressurization testing
House setup
_ If of bath tans on These doors are closed:
Vented range hood on
Clothes dryer on — — - -
Air handler on
Other fans on
Tested appliances
Appliance
Typt
Locatiol
CAZ pressure
BPI tlepressurization limit Pa wart outside
Measured net CAZ depressurizationPa wart outside
OK (less negative) j Caution (more negative)
Spillage
BPI maximum limit seconds
Measured spillage duration seconds
Pass = duration not exceeding limit
Draft pressure
BPI limit Pa wart CAZ
Measured Pa wrt CAZ
Pass = pressure more negative than limit
CO concentration in undiluted flue gas
BPI maximum limit ppm
Measured CO ppm
Pass = CO level not exceeding limit
Caution = CO level 25 to 100 ppm
_ Draft -hood
Induced -draft
_ Draft -hood
Induced -draft
Draft -hood
Induced -draft
60
60
60
❑
Pass
❑
ail
❑
Pass
I Old!
❑
ass
❑
ail
100
100
100
❑
ass
❑
ail
❑
Pass
I D1.11
❑
ass
❑
ail
❑
aution
❑
Caution
❑
aution
Mechanical Systems Performance Testing SubmlttsPo V20120321 5 of 6
System controls operating per design intent
q�m�m
Pass
Fail
Local exhaust
`I;Q_
❑
Whole -house ventilation
19L
❑
Sub -structural floor exhaust N
❑
❑
Heating
A.
❑
Cooling
59,
❑
Approved Agency
Name (print)
Title
Company
Signature and Date
HVAC contractor
Name (print)
Title
Company
Signature and Date
Mechanical Systems Performance Testing Submimawo V20120321 6 of 6