Loading...
HomeMy WebLinkAbout5832 Northern Lights Dr - Special Inspections/Engineering - 02/25/2014I Excavation/Footing Observation CLIENT Ryland Homes 8200E Maplewood Ave.. Ste. 150 Greenwood Vil(gge, CO 80111 S11 LI 611-1' 1'1��� Recommended Foundation System CTLITHOMPSON PROJECT NO. FCO _ �1 : GG t.4. •- 1 Z 0 DATED 7 Z/ LO 13 ❑ SPREAD FOOTINGS MAXIMUM SOIL PRESSURE OF MINIMUM WIDTH_ 2 FOOTINGS WITH MINIMUM DEADLOAD - PSF. INCHES MAXIMUM SOIL PRESSURE OF On 0 PSF. MINIMUM DEADLOADPRESSUREOF 1c,00 PSF. PROVIDE A L`"l INCH VOID BENEATH GRADE BEAMS MINIMUM WIDTH INCHES ❑ GRADE BEAMS AND PADS MAXIMUM SOIL PRESSURE OF _...... _.___ PSF. MINIMUM DEADLOAD PRESSURE OF _ PSF PROVIDE A _.-_.—INCH VOID BENEATH GRADE BEAMS MINIMUM WIDTH _ INCHES Foundation Plan nn By PLAN NO. SiZCI� ....-.... DATE I 2 �J %G /�'.l ��..� WALL FOOTING WIDTHI6,I�,1LJ_c INCHES) DEPTH _ 4'(INCHES) COLUMN PAD LI L (INCHES) DEPTH (INCHES) COLUMN PAD _=)_, ' .,.(INCHES) DEPTH _ I'L(INCHES) REINFORCEMENT AS PER PLAN: g YES ❑ NO ❑ NONE REQUIRED N AT SITE ❑ INSTALLED Soil Conditions At Footing Level L UPPER LEVEL LOWER LEVEL---I'-l.—J_:.�......_CIG.� _I4 H. [>!a�tl Vy�,,,, �....._ CTLITHOMPSON ,n. I ADDRESS: Mc C Cl,eei LOT._-- �BLOCK -17, FILING NO._ __PROJECT NO. Foundation Layout A INDICATES APPROXIMATE DEPTHlWIOTH MEASUREMENT LOCATION Instructions to Contractor FOOTING IN GENERAL CONFORMANCE WITH PLAN ❑ FOOTING REJECTED �CNDITIONS IN EXCAVATION AS ANTICIPATED ❑CONDITIONS IN EXCAVATION NOT AS ANTICIPATED. CONTACT GEOTECHNICAL ENGINEER Ground Water Conditions RECOMMENDED CORRECTIVE PROCEDURE NONE IN EXCAVATION 'NONE ENCOUNTERED W BORING NO. Ch/ i TO ,„,-„�._ FEET - •-------�..�.. ❑ ENCOUNTERED AT _... ... FEET IN BORING NO. e.�f_ Remarks:ttC FIELD REPRESEN ATIVE.7* v.+cry a J rr ►t 4 Ell' Q�cti vu 3 i J8 REVIEWED Y --(J- DATEOF 0 VAT O/�GI� ••/"�y'(}i.i nV• Foundation Wall Reinforcement Observation CLIENT Ryland Homes 8200 E. Maplewood Ave.; Ste. 150 Greenwood Village. CO 80111 Foundation PI n BY 5..3LTA.1L�" PLAN NO. S DATE( Foundation Plan ❑ SPREAD FOOTINGS FOOTINGS WITH MINIMUM DEADLOAD ❑ GRADE BEAMS AND PADS ❑ DRILLED FRICTION PIERS ❑ DRILLED PIERS INTO BEDROCK ❑ OTHER CTIJTHOMPSONr PROJECT NO. �f"c`�SS� %6Du `10 DATED O �> WALL ALIGNMENT OFFSET INCHES Foundation Void P REQUIRED THICKNESS ❑ NOT REQUIRED Reinforcing Steel L) y GRADE BAR SIZE • J NO. OF TOP � BOTTOM VERTICAL ` LIB 4Ok, P,15, LL)Aq HORIZONTAL COUNTERFORTLI �Ii-r�,T �% / //� 19 D structions to Contractor IN GENERAL CONFORMANCE WITH PLAN REJECTED RECOMMENDED CORRECTIVE PROCEDURE ADDRESS: /%1 e �LELLAUPS QC-�� 59,59 PoeVAf--w L I A, � Ply . LOT \ BLOCK FILING NO. PROJECT NO. fa>55K5 , 00 ( Foundation Wall Layout —�LH— y+� UFER Grou/nn�d; +Loc'+ation of UFER Grouu�nd [� LOCATION t't 4V • h.l,•�• COQIJL� ItiI T• ❑ NOT INSTALLED COMMENT: O�PD� LIc�� FIELD REPRESENTATIVE '=� ��•,CnO „i O REVIEWED BY .O 1 �o ;MAR 10 2014. �Y DATE OFOBSERVATION .......•°°',('�� Foundation Wall Drain/ CTL I THOMPSON Void/Waterproofing Observation " CLIENT: Ryland Homes ADDRESS: 8200 E. Maplewood Ave.. Ste 150 /l c C l-el (// o-, e-A C✓ P P4 Greenwood Village, CO 80111 LOT BLOCK____.... Attn• M¢. Annette WendOrff FILING NO._ PROJECT NO. Foun tign/Plan (�( Foundation Wall Layout BY _ Sk J CInS L&- Rom' PLAN NO. S aC � EL -a""-- Foundation Type ❑ SPREAD FOOTINGS ❑ GRADE BEAMS AND PADS ❑ DRILLED FRICTION PIERS ❑ DRILLED PIERS INTO BEDROCK W-OOTING W/MINIMUM .❑ OTHER DEADLOAD r, El 3,. ('4 y CTLITHOMPSON PROJECT NO ....... _... ........... ...... DATED Foundation Void �j 9REOUIREDTHICKNESS_.•.•,_;j: ........ ..... ...- .,� INCHES 1W MEASURED THICKNESS —�f ___INCHES Foundation Wall Condition ❑ EXPOSED STEEL ❑ SURFACE PROBLEMS (HONEYCOMBING, ETC.) (IF CHECKED, SHOW LOCATION ON SKETCH) Recommended Drain Type ❑ EXTERIOR/' INTERIOR FIG. A INSTALLED PIPE DIAMETER I If _._........._..._._ INCHES WALL HEIGHT ..�..� � INCHES DEPTH -TOP OF WALL TO BOTTOM OF TRENCH._ t j,..,6 % 7 INCHES LAB ON GRADE ❑ STRUCTURAL FLOOR PIPE INSTALLED 12 GRAVEL INSTALLED, GRAVEL SIZE Type of Outlet ❑ GRAVITY, BELOW SEWER N SUMP PIT ❑ UNDERDRAIN SERVICE CONNECTION VISIBLE (AT STUB) Foundation Void: NRN GENERAL CONFORMANCE WITH RECOMMENDATIONS ❑ REJECTED �7,Foundatlon Wall Drain: :41N GENERAL CONFORMANCE WITH ❑ REJECTED �K Foundation Waterproofing: 5�IN GENERAL CONFORMANCE WITH RECOMMENDATIONS ❑ REJECTED ❑ Exterior Insulation MANUFACTURER m HEIGHT _ FEET m = DISTANCE BELOW FOUNDATION WALL FEET t 7-1 / RECOMMENDED CORRECTIVE PROCEDURE