HomeMy WebLinkAbout2126 Nancy Gray Ave - Special Inspections/Engineering - 02/22/2012T2 Structural Engineering LLc February 22, 2012 1329 Fast Seventh Street, Loveland, Colorado 80537 Office. (970) 663-6016. Fax, (970) 622-9324 Jamestown Builders, LLC 3003 East Harmony Road, 4th Floor Fort Collins, CO 80528 Foundation Reinforcement Observation Lot 10, Block 9, Sidehill Subdivisoin 2126 Nancy Gray Avenue Fort Collins, Colorado Project Number: 11-108-32 Dear Mr. Everitt: Today, a representative of this office visited the site referenced above to observe the foundation wall reinforcement size, and location and to confirm the vertical reinforcement spacing in . foundation forms for both the house and the detached garage. The reinforcement appeared to be in general compliance with the foundation drawing and details by T2 Structural Engineering, project number: 11-003, dated February 9, 2011. There were two Ufer bars, one on each side of the foundation. The east Ufer bar was located approximately two feet towards the north from the front foundation wall. The west Ufer bar was located approximately two feet towards the north from the front basement foundation wall. There was a Lifer bar in the garage. The Ufer bars were lapped and tied to the continuous bottom row of reinforcing steel. Protect freshly placed concrete from temperatures that will compromise the design strength of the concrete. Concrete placement and reinforcement is to be installed in accordance with ACI 318 and the 2006 IRC. Please contact this office if there are questions, or additional information that is required. Thank you for the opportunity to work with you on this project. Sincerely, Russell T. Zoetewey, E.I.Ta,, Susan Tagg, P.E.?-- 40343 Enclosures � �,'•FEB 2 2 1UR '04- No Text No Text No Text No Text No Text