Loading...
HomeMy WebLinkAbout2862 Breton Way - Special Inspections/Backflow - 08/07/20144 ■ - CONSULTING • TESTING • SALES • REPAIRS INSTALLATION• EMERGENCY SERVICES ,qj'S BacL `Tow Testing LEC "Your Cross -Connection Connection" 1540 27th Street, Greeley, CO 80631'� Office 970-352-3090 Cell 303-981-7032 Fax 970-356-5794 Website: ajsbackflowtesting.com E-mail: ajsbft@earthlink.net Assembly Serial#: C,50cj_--98 `Test DatefTime: iGauge Serial #: 515 33z Distf ctlRequired Info: Tester Certification #: 1y I 1 Date Certification Expires: 10 - Ze - ? 0111 Assemblv Test Results: (APASS ❑ FAIL Backflow�Preventlon Device Test & Maintenance Report 17027 Water District/Authonry or "C lj ;1J S Account: Contact Person: Facility Name: -T�IA1 [Mailing cn-1 i � Contact Phone: service Address: - Z id G'L 6r e 4 oto W &Y FL . G 11'. ki S �. 9 %4 ZS Address: 13 Owner ❑ Manager ❑ Contractor ❑ Other Contact Person: C Company Name/Title: Contact Phone: y Mailing Address: Make: V.I; I V- � /.( S Model: q 00 • A Size: + fv c /-I Type: ❑ RPZ ❑ DC Q• PVB ❑ SVB ❑ Air Gap ❑ AVB ❑ Other Device Date Installed: Location on Property: r- AS7 -S; J)r t: )(4 /r•j% V.//I (/ E'-❑ Replacement Device Orientation Service Protection previous device serial # Inlet: Outlet: _ ❑ Domestic ❑ Containment a ❑ Vertical Up ❑ ❑ Fire ❑ Isolation ❑ New Installation ❑ Vertical Down ❑ 21rrigation ❑ Containment by Isolation ❑ Stolen ❑ Horizontal ❑ ❑ Other: —1 Line PSI: Initial Test Results: Repaired: ❑ Ck#1 ❑ Ck#2 ❑ RV Cleaned: ❑ Ck#1 ❑ C1k#2 ❑ RV Rel-test Results: Ti htness Differential Tightness Differential Check Valve #1 ❑ Leak 7 1 Ck#1 ❑ Leak RPZ, DC, PVB, SVB ® Tight L l/ ❑ disc ❑ spring ❑ seat D other ❑ Tight Check Valve #2 ❑ Leak Ck#2 ❑ Leak V. RPZ, DC ❑ Tight ❑ disc ❑ spring El seat El other ❑ Tight - W Relief Valve RV di RV, RPZ ❑ Diaphragm El seat El other ci Buffer Repaired: Cleaned: RPZ ❑ Air Inlet ❑ Air Inlet Air Inlet I Air Inlet I►r►. OJ IAir inlet, PVB, SVB 1C ❑ poppet ❑ bonnet ❑ other 0 Shutoff Valve #1 ❑ Leak ❑ Tight SOV #1 ElOpen Upon Arrival ElOpen At De arture Backpressure Cause exists? El YES El NO H Shutoff Valve #2 ❑ Leak wri ht SOV #2 ❑ Open Upon Arrival ❑ Open At De arture Assembly Concerns: Test Procedure: Comments:. (only if applicable) ❑ Incorrect Installation ❑ ABPA ® ASSE ❑ Incorrect Use Turn off date: Turn on date: Turn off time: Turn on time: Alarm Company/Fire Department Notified: ❑ Fire suppression contractor certification # B995: Verson Notified: Contacted by: z Turn off date/time: Turn on date/time: Test Kit Make: A19ief-i4resF- S 3 tV\ Model: BW 3S Last Calibration Date: 1— I ► I U 1 hereby certify that the isolatiordShutoff Valves (SOV # 1 and SOV #2) have been returned to the position in which they were found and that the last test was done according to i the procedure shown above required by the Water DistricUAuthority shown above) and the test readings are true and accurate to the best of my ability. « (please print) AJs Backf ow (please print) m Testing Company: Testing LLC Phone: 970-352-3090 Customer Name: Phone: (please print)) Sco H N1 tC 1 S Tester Name:->AJ-6iReR9eR Tester Signature: r Customer Signature: Backflow testers .who test or repair assemblies on a fire line must be registered with the Colorado Division of Fire Safety.