Loading...
HomeMy WebLinkAbout3814 Rock Creek Dr - Special Inspections/Engineering - 12/12/2011 (2)wart (FRr`�=i.N..SN+�3V �d December 12, 2011 EARTH ENGINEERING COMPANY, INC. LandMark Solutions, Inc. ` 1170 West Ash Windsor, Colorado 80550 Z. /0 3 FiS �l 7f//u Attn: Mr. Bob Brex��v, Re: Foundation Drain and Damp Proofing Observation Fort Rock Creel: Drive — 6 Plex Fort Collins, Colorado � // O EEC Project No. 11-01-208 / ✓ 5�� � _/ ,/ ���� Mr. Brex: As requested, requested, Earth Engineering Company, Inc. (EEC) personnel have completed the construction observation services you requested for the referenced project. Those services included observations of the foundation drain placement and damp proofing at the referenced address. The results of those observations are included with this report. On September 23, 201 1, EEC personnel observed the foundation drain for the referenced project. The foundation drain consisted of 4-inch perforated pipe bedded in gravel around the below grade exterior perimeter of the structure and was connected to basement sump pits located in the east and west end units. The gravel was covered with filter fabric. The damp proofing consisted of a grey spray -on coating that appeared to cover all exterior below grade living areas of the basement walls. We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, or if we can be of further service to you in any way, please do not hesitate to contact us. Very truly yours, Earth Engineering Company, Inc. Principal Engineer • BOX 271425 P.O. Box 49322 FORT COLLINS. .. S• • - 6: � � .-aY��'•C." .�-R .".r +irn._ 3d;' S 3..u. u-^a' a '#JWww0z. M-PW