RE: Framing/Sheathing Observations
3214 Green Lake Drive; Lot 2, Block 15 Trail Head Subdivision
QE Project No. 1028-001
Dear Mr. Hoaglund:
At your request, a representative of Quality Engineering was present at the above referenced
address on September 30, 2011 to observe and document framing and sheathing of the structure
as it conforms to the structural plans prepared by Quality Engineering dated July 21, 2011. At
the time of our observations, framing and sheathing was completed in substantial compliance
with the direction, details and specifications noted on the referenced structural plans. However,
the following deficiencies were noted and shall be corrected prior to the City's framing
inspection. Additional recommendations where necessary are also noted below:
1) Hurricane clips at trusses installation was not complete, mainly in the garage.
2) There are staples missing at the bottom edge of the exterior OSB at the west side of the
gage-
3) 2x blocking was not completed at the 2°d level trusses.
4) A total of 3 — 16d sinker nails needs to be toe -nailed at each truss into the double top
plates to provide lateral shear resistance throughout the structure.
5) The 2°d level wall north of the stairs needs to have 1/2" gypsum wallboard installed each
side and nailed at 7" O.C.
6) 3 — MST37 Straps were missing at the north stair braced wall line.
7) 2x web bracing in the roof trusses has not been installed yet as shown on the truss
profiles.
8) The porch post was not installed at the time of our observations. A minimum built up.
post size of 2-2x4s may be substituted for the 6x6 post shown on the plans. Simpson post
QUALMY ENGINEERING, LLC (970) 416-7891 724 BRAMBLEBUSH STREET FORT COLLINS, COLORADO
Page 2
RE: Framing/Sheathing Observations
3214 Green Lake Drive; Lot 2, Block 15 Trail Head Subdivision
QE Project No. 1028-001
caps and bases should be installed. A minimum beam size of 2-2x8s is an acceptable
alternative to the 4x8s shown on the plans.
9) The deck floor beam was not installed. 2-2x12s or 3-2x10s are an acceptable alternative
to the Parallam deck floor beam shown on the plans.
If you have any questions concerning our observations please call us at (970) 416-7891.
Sincerely,
QUALITY ENGINEERING, LLC rNAL
s0 FOma`sm?�;�Cody Ge s ndo r, PE. ��``S\
Quality
Engineering
W W W. QUALITY -ENGINEERING. BIZ
September 4, 2011
Mr. Terence Hoaglund
Bluestone Homes
PO Box 1889
Fort Collins, CO 80522
RE: Excavation/Foundation/Damp Proofing Observations
3214 Green Lake Drive; Lot 2, Block 15 Trail Head Subdivision
QE Project No. 1028-001
Dear Mr. Hoaglund:
At your request, a representative of Quality Engineering was present at the above referenced
address on August 24, 2011 to observe and document foundation excavation and soil conditions.
The soils noted in the excavation are generally consistent with the soil profiles provided by CTL
Thompson in the site -specific geotechnical investigation report titled, "Geotechnical
Investigation Lots 1 and 2, Block 15, Trail Head Subdivision," Project No. FC05594-120, dated
July 13, 2011. Soils present at the project site and at the bottom of the excavation appeared to
consist of dark brown, sandy clay (USCS CL). Groundwater was not observed at the time of our
observations. Our observation confirmed that the foundation design parameters given in the
geotechnical report are acceptable. The soils appear to be capable of supporting the design net
allowable bearing pressure of 2,000 pounds per square foot (PSF) and a minimum dead load
pressure of 500 PSF as shown on the structural plans prepared by Quality Engineering dated July
21, 2011.
Representatives of Quality Engineering, LLC were present on August 25, 2011 and August 26,
2011 to observe footing and foundation wall formwork and footing and foundation wall
reinforcing placement. These observations and inspections were made to confirm that footing
and foundation wall formwork and reinforcing placement was completed in substantial
compliance with the direction, details, and specifications shown on the referenced structural
plans. Footing and foundation wall formwork and reinforcing placement was completed in
substantial compliance with the direction, details and specifications noted on the referenced
structural plans.
It is our understanding that the Simpson SB 7/8" anchor bolts were not in stock for use with the
Simpson HD9 holdowns at callout 6 on Sheet S-1 of the structural plans at the time of foundation
construction. It is also our understanding that a Simpson STHD10RJ holdown was installed at
the north callout 6. As an alternative to the SB 7/8" anchor bolts for the HD9 holdowns at
callout 6 locations, the following substitution is acceptable:
QUALITY ENGINEERING, LLC (970) 416.7891 724 BRAMBLEBUSH STREET FORT COLLINS, COLORADO
Page 2 Proofing Observations
RE: Egcavation/Foundation/Damp
3214 Green Lake Drive; Lot 2, Block 15 Trail Head Subdivision
QE Project No. 1028-001
• A 7/8" diameter A307 threaded rod set with Simpson AT Acrylic Tie (not epoxy) with a
minimum 8" embedment depth into the concrete foundation wall for installation of the HD9
holdowns per manufacturer's specifications.
Damp proofing observations were made to confirm that damp proofing material and application
was completed in substantial compliance IRC Section R406. Damp proofing (DECO 20 or
similar) was applied to the exterior face of the concrete basement walls. The damp proofing was
applied from the top of the footing to the top of the basement walls and appeared to meet IRC
Section R406 requirements.
If you have any questions concerning our observations please call us at (970) 416-7891.