Loading...
HomeMy WebLinkAbout346 Toronto St - Correspondence/Water and or Sewer - 01/31/2012A, dmmv� East Larimer County Water District Date: -31' Zd 12-- Where water pressure exceeds eighty (80) p.s.i. a pressure regulator shall be installed by the owner. plant Investment Fee and Installation to be paid. proof of ownership must be presented prior to the collection of any fees. Backflow prevention devices are required on all irrigation systems. Yearly testing by a certified tester is required. Commercial properties are required to submit an ELCO backflow prevention application. MEMORANDUM To: City of Fort Collins Buildinu Permits and Inspection Phone: 221-6760 Fab: 224-6134 From: East Larimer County (ELCO) Water District Subject: Water Service Approval-Buildinu Permit May Be Issued. THIS LETTER VERIFIES THAT: LL C- (Applicant Name) HAS MADE APPLICATION FOR WATER SERVICE AT THE FOLLOVVING LOCATION: �o 5 310L" Dvt CI% nor I� PR I 9 (Legal Description) (Address) 7 SIGNED: 232 South Link Lane, P.O. Box 2044 • Fort Collins, Colorado 80522 • Phone (970) 493-2044 • Fax (970) 493-1801