HomeMy WebLinkAbout5021 Brookfield Dr - Special Inspections/Engineering - 09/09/2014September 9, 2014 LandMark Solutions, Inc. 1170 West Ash Windsor, Colorado 80550 Attn: Mr. Bob Brex(bbrex(a�landmarksolutionsinc.com) Re: Grade Beam Observations 5021 Brookfield Drive Fort Collins, Colorado EEC Project No. 12-01-190 Mr. Brex: EARTH ENGINEERING COMPANY, INC. On September 18, 2013, Earth Engineering Company, Inc. (EEC) personnel provided construction observation services you requested for the referenced project. Those services included observation of the grade beam reinforcing prior to the placement of cast -in -place concrete. Two #4 and single #5 horizontal rebar were placed in the grade beams at the top and bottom of the grade beam walls, respectively at various locations. Vertical #4 bars were observed at approximately 2' on -center throughout the length of the grade beams. Lap lengths were checked and appeared to meet the minimum required lengths. At the time of our observations, it appeared that the wall reinforcing steel had been placed in general accordance with the construction plans prepared by Barton Supply dated July 31, 2013. We appreciate the opportunity to be of service to you on this project. If you have any questions concerning this report, or if we can be of further service to you in any other way, please do not hesitate to contact us. Very truly yours, Earth Engineering Company, Inc. ..W ffil � "s M Michael J. Coley, P.E. Principal Engineer P.O. Box 271428 P.O. Box 49322 FORT COLLINS, COLORADO 80527- 1 428 COLORADO SPRINGS, COLORADO 80949-9322 (970) 224-1'522 (FAX) 663-0282 (719) 442-6813 (FAX) 447-9635 d September 9, 2014 LandMark Solutions, Inc. 1170 West Ash Windsor, Colorado 80550 Attn: Mr. Bob Brex(bbrexalandmarksolutionsinc.com) Re: Construction Observation and Testing 5021 Brookfield Drive Fort Collins, Colorado EEC Project No. 12-01-190 Mr. Brex: EARTH ENGINEERING COMPANY, INC. As requested, Earth Engineering Company, Inc. (EEC) personnel provided construction observation and testing services to you for the referenced project. Those services were provided on a part-time basis and included testing of cast -in -place concrete for the referenced project. On November 13, 2013, EEC personnel observed and tested Portland cement concrete delivered to the site for placement at the post -tensioned slab -on -grade. Field testing performed on the plastic concrete included slump, air content, and concrete temperature. The ambient air temperature at the time of placement was also recorded. Concrete test cylinders were cast from representative samples for laboratory curing and compressive strength testing. Results of the field and laboratory tests performed during the referenced date are provided with this report. We appreciate the opportunity to be of service to you on this project. If you have any questions concerning this report, or if we can be of further service to you in any other way, please do not hesitate to contact us. Very truly yours, Earth Engineering Company, Inc. Principal Engineer P.O. Box 271428 FORT COLLINS. COLORADO 80527` 1 428 (970) 224-1 522 (FAx) 653-0282 P.O. Box 49322 COLORADO SPRINGS, COLORADO 80949-9322 (719) 442-6613 (FAX) 447-9635 Earth Engineering Company Report of Cast -In -Place Concrete Tests GENERAL INFORMATION Placement Date: 11/13/2013 Test Set Number: 3 Placement Location: 5021 Brookfield Drive (PT Slab - Floor, Center) Concrete Supplier: Martin Marietta Materials Type of Placement: Pump Ticket Number: 49027079 Truck Number: 703 Mix Code: A4464 Water Added on Site: 58 gals Batch Time: Sample Time: 8:20 AM Yards: 90 of 220 Required 28 Day Compressive Strength (psi): 4000 EEC Technician: EM Comments11 FIELD TEST DATA TEST RESULTS SPECIFICATIONS Slump (inches) ASTM C-143 3.5" Air Content (%) ASTM C-231 4% Unit Weight (pcf) Laboratory — Concrete Temperature (deg F) ASTM C-1064 650 90° Max it Temperature at Placement (deg F) 48° — Comments: COMPRESSIVE STRENGTH OF FIELD CAST TEST SPECIMENS (ASTM C-39/C-31) Specimen Number Date Tested Age (Days) Maximum Applied Load pounds Area in2 Failure Type Compressive Strength (psi) Average Compressive Strength (psi) 3 A 11/16/13 3 67770 12.57 Shear 5390 5390 3 D 12/11/13 28 66530 12.57 Shear 5290 3 D1 12/11/13 28 67760 12.57 Shear 5390 5320 3 1 D21 12/11/13 28 66370 12.57 Shear 5280 Project: Morningside Phase 4 Project Number: 12-01-190 EEC Report Distribution: Martin Marietta Materials