HomeMy WebLinkAbout3299 Glacier Creek Dr - Disclosures/Mechanical - 06/21/20145. Heating + Cooling Equipment
For mI systems, attach one page per system
System #io A Which Parts of house does 4 serve?
Installed equipment (Be clear about which AC components are Installed at time of testing) Testing tech (inftlalsI
Manufacturer
Model #
Furnace or Boller -AC
or Heat Pump condenser
AC or Heat Pump Coll
9.31UN 1 0SLMPZ
4AC-19Q,
)PaziR
Basic pleated —Other MERV
Fitter HIgh-aft pleated . . . 1 7 (opt anal) Basic fiberglass Electrostatic
Type IN, `
brand (Inches) 5'.6
Static
Speed: — Heating X_ Cooling — Cont ran
High -stage for mulff-stage equipment
Blower speed tap: Le, L,,,
Humidifier damper. NIA
— Open (Heating)
— Closed (Cooling)
,_,All registers open
SPI
AP Filter
Sp?
Testing tech (Iniffals)F71
SP4"�Aii'.!. i" Ame location
A .. III r NSOP,
TFSOP)
AP Coll
(SP3-SP4) I MW
SP3
�3 � \
AP Total ESP
(SP3-SP2)
S"3.— fill
0059. Meas�jfcd air Auw Unough inciaor col'i
I I Ivi U 1 11 NIA- no AC installed Testing tech (in�Jals)
',dazs!gn +(- I 5%)l )�Z f0 T)'?
Measured airflow
Flow, g6d Airtern
W
'Rath
Flow ta
----- -ol 100i (F)j`I
LEE I �1-
Vn2M�t Correct on Factor
bif-H,74'j,
Vulumcino &I -I 1CF114 I;-; I'arlx
W1.1.dAFxADCF1 1616 15000,
JadJustfnantJcorrsdon
Testing
W-;
pressurei Jr 16
Fall
Huduug. Ternper-aiure rise
7-7-
=T
11MMUSM M.;
NO
Testing approach and targets � W
f- hr•
1 Testing tech (Initials)WE
G.��C'� `.� � �tg-�'�
/
No tIeted November - Apdl (nstalling=Vacwrreaponahe for testing to
[';�41WA.*
"M wchthao
(0 TXV: Subccoling + SH check %Non-7XV: Superheat MOFM•speciac: Approach ITOtherOEM-cna ifin
:'-� lame",
(F): entering air temp alrwet•bulb temp �*";+ry superhaat 3 subcooting� approach��' !
Subcooling
Discharge Q�'i'�,r`t
pressure \'
Condense h
saturation ) F
-'
Liquid ' Actual ��TXV pass: Actual SC within
Gne': F
i ,sure1 rr.y^•n,
.____ .. -... .
subwnGn F 3 F of
....::: g� iargct SO, 2 F min
Suction
pressure r ��
Evaporator F A re
saturation T F
Suction Actual a Non-TXV Pass: Actual SH
line "-� ..y F superheat❑F within +!- 5 F of target SH
(PSI) a `r?4
(sow apart) ¢ >y
temp '� `=:'-,- (suet tint T-evap T) Non-TXV Fail
I'= TXV ehackS: 1'Ff Pass_
.
Fteld-r„chAl:c•,i TXV t„o.,ttai
Liquid Una t <l—.';`:{? F
temp . % y
Actual approach APPmach Pass: Actual approach within +f-1 F of target approach
(ag gne T. camensar eaT)�L�F
i
L Approach Fail
1
Register air flows Testng tech pn ra;c)I
imam, names on plans, Incluae
Pressure Drop
Pressuro Pass Fail
basement if them Is a doorl
T.,
nrap ro_)
:YI I'===1 a
(—..-...._,..,. — I
-•-".�T1 —i _TIp-�Lyi�-- c
ids-^--t+-yr•��.
10
! ..
.i (•S 1 J 1
! J :sal
t -3 to �3 n
Residential Mechanical Design Submittal V20140101 Page 4
Combustion safety testing WA— no natural -draft combustion appliances
L 1(ance Types table must be completed for every home)
Appliance types
Testing tech (initials)
Appliance
Combustion
r41A
Draft -hood
Natural -draft
irtdurad-draft
Natural -draft
I Power-
vent
Direct_
vend
1 Po:.cred sealed -
I combustion
Electric
Furnace #1
10
Q
❑
1 ❑
❑
❑
❑
Furnace #2
10
❑
❑
❑
Q
❑
❑
Boller#1
❑
❑
❑
❑
❑
❑
❑
'
Boiler #2
❑
❑
❑
❑
❑
❑
❑
ater heator 9,
❑"
❑
❑
J
❑
LJ
❑
Waterheater #2
❑
❑
❑
❑
❑
Q
❑
Replace #]
Q
❑
❑
Q
❑
❑
❑
Fireplace #2
❑
❑
❑
❑
Q
❑
❑
Other.
El
❑
❑
❑
❑
❑
❑
depressurization performance
,1__�._.d.'be^'d
vu:.uu. ac:Tiparafuin ;r r
Z pressure
BPI depressurization limit (Pa wrt outslda)
Measured net CAZ depressurization (Pa wd outside)
OK (less negative) ( Caution (more negative)
BPI maximum limit
Measured spillage duration
Pass = duration not exceeding limit
BPI limit (Pa wrt CAZ
Measured (Pa wrt CAZ
Pass = pressure more negative than IImit
i concentration In undiluted flue gas
BPI maximum limit (Dom
Measured CO
Pass = CO level not exceeding limit
Caution= CO level 25 to too ppm
❑ OK ,II. Caution ❑ JOK �-j Cat JOK "❑ Icaution
60
60
60
❑ Pass "—[Fail
❑ Pass IN Fall
❑ Pess ❑■ Fall
❑ Pass Fail ❑ Pess � Fail ❑ pass (� Fail
100
100
100
❑
Pass HNIFait
❑
Pass la Fail
❑ PassliffillFail
�-`
c�uton
O'
Caution
D caution
Residential Mechanical Design Submittal V20140101 Page 5
System
Controls Operating
Per Design Intent
Loral exhaust (all fans)
❑
WA
Pass
■ Fall
Whole -house ventilation
❑
WA
Pass
�■ Fall
Sub -structural floor exhaust
WA
❑
Pass
Fail
Heating (all systems)
❑
WA
Pass
Fail
Cooling (ell systems)
Q
N/A
Pass
Fail
Testing tech Qnftiais)F---�
Signatures
7echnlclan Al performing inspection and testing documented on this report (Approved Agency)
I certify that the tests referenced above, In sections bearing my initials, were performed In accordance with protocols specified by the
City of Fort Collins Building Services Department, and that the reported results are accurate to the best of my knowledge.
Name (print)
M i2.
Tme M62
Company 42
Signature and Date �---t
Technician #2 performing inspection and testing documented on this report (Approved Agency)
I Certify that the tests referenced above, in sections bearing my initials, were performed In accordance with protocols specified by the
City of Fort Collins Building Services Department, and that the reported results are accurate to the bast of my knowledge.
Na
Signature
Li
HVAC Contractor (City of Fort Collins license holder)
I certify that 1 have reviewed this report and that the test results are an accurate representation of the performance of the Installed mechanical
systems.
Name (print)
Tolle
Company
Signature and Date
(� f-% t)IAs2
�a-r M62
19C14 f}
21 r
Residential Mechanicat Design Submittal V20140101 Page 6