Loading...
HomeMy WebLinkAbout3299 Glacier Creek Dr - Disclosures/Mechanical - 06/21/20145. Heating + Cooling Equipment For mI systems, attach one page per system System #io A Which Parts of house does 4 serve? Installed equipment (Be clear about which AC components are Installed at time of testing) Testing tech (inftlalsI Manufacturer Model # Furnace or Boller -AC or Heat Pump condenser AC or Heat Pump Coll 9.31UN 1 0SLMPZ 4AC-19Q, )PaziR Basic pleated —Other MERV Fitter HIgh-aft pleated . . . 1 ­7 (opt anal) Basic fiberglass Electrostatic Type IN, ` brand (Inches) 5'.6 Static Speed: — Heating X_ Cooling — Cont ran High -stage for mulff-stage equipment Blower speed tap: Le, L,,, Humidifier damper. NIA — Open (Heating) — Closed (Cooling) ,_,All registers open SPI AP Filter Sp? Testing tech (Iniffals)F7­1 SP4"�Aii'.!. i" Ame location A .. III r NSOP, TFSOP) AP Coll (SP3-SP4) I MW SP3 �3 � \ AP Total ESP (SP3-SP2) S"3.— fill 0059. Meas�jfcd air Auw Unough inciaor col'i I I Ivi U 1 11 NIA- no AC installed Testing tech (in�Jals) ',dazs!gn +(- I 5%)l )�Z f0 T)'? Measured airflow Flow, g6d Airtern W 'Rath Flow ta ----- -ol 100i (F)j`I LEE I �1- Vn2M�t Correct on Factor bif-H,74'j, Vulumcino &I -I 1CF114 I;-; I'arlx W1.1.dAFxADCF1 1616 15000, JadJustfnantJcorrsdon Testing W-; pressurei Jr 16 Fall Hudu­ug. Ternper-aiure rise 7-7- =T 11MMUSM M.; NO Testing approach and targets � W f- hr• 1 Testing tech (Initials)WE G.��C'� `.� � �tg-�'� / No tIeted November - Apdl (nstalling=Vacwrreaponahe for testing to [';�41WA.* "M wchthao (0 TXV: Subccoling + SH check %Non-7XV: Superheat MOFM•speciac: Approach ITOtherOEM-cna ifin :'-� lame", (F): entering air temp alrwet•bulb temp �*";+ry superhaat 3 subcooting� approach��' ! Subcooling Discharge Q�'i'�,r`t pressure \' Condense h saturation ) F -' Liquid ' Actual ��TXV pass: Actual SC within Gne': F i ,sure1 rr.y^•n, .____ .. -... . subwnGn F 3 F of ....::: g� iargct SO, 2 F min Suction pressure r �� Evaporator F A re saturation T F Suction Actual a Non-TXV Pass: Actual SH line "-� ..y F superheat❑F within +!- 5 F of target SH (PSI) a `r?4 (sow apart) ¢ >y temp '� `=:'-,- (suet tint T-evap T) Non-TXV Fail I'= TXV ehackS: 1'Ff Pass_ . Fteld-r„chAl:c•,i TXV t„o.,ttai Liquid Una t <l—.';`:{? F temp . % y Actual approach APPmach Pass: Actual approach within +f-1 F of target approach (ag gne T. camensar eaT)�L�F i L Approach Fail 1 Register air flows Testng tech pn ra;c)I imam, names on plans, Incluae Pressure Drop Pressuro Pass Fail basement if them Is a doorl T., nrap ro_) :YI I'===1 a (—..-...._,..,. — I -•-".�T1 —i _TIp-�Lyi�-- c ids-^--t+-yr•��. 10 ! .. .i (•S 1 J 1 ! J :sal t -3 to �3 n Residential Mechanical Design Submittal V20140101 Page 4 Combustion safety testing WA— no natural -draft combustion appliances L 1(ance Types table must be completed for every home) Appliance types Testing tech (initials) Appliance Combustion r41A Draft -hood Natural -draft irtdurad-draft Natural -draft I Power- vent Direct_ vend 1 Po:.cred sealed - I combustion Electric Furnace #1 10 Q ❑ 1 ❑ ❑ ❑ ❑ Furnace #2 10 ❑ ❑ ❑ Q ❑ ❑ Boller#1 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ' Boiler #2 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ater heator 9, ❑" ❑ ❑ J ❑ LJ ❑ Waterheater #2 ❑ ❑ ❑ ❑ ❑ Q ❑ Replace #] Q ❑ ❑ Q ❑ ❑ ❑ Fireplace #2 ❑ ❑ ❑ ❑ Q ❑ ❑ Other. El ❑ ❑ ❑ ❑ ❑ ❑ depressurization performance ,1__�._.d.'be^'d vu:.uu. ac:Tiparafuin ;r r Z pressure BPI depressurization limit (Pa wrt outslda) Measured net CAZ depressurization (Pa wd outside) OK (less negative) ( Caution (more negative) BPI maximum limit Measured spillage duration Pass = duration not exceeding limit BPI limit (Pa wrt CAZ Measured (Pa wrt CAZ Pass = pressure more negative than IImit i concentration In undiluted flue gas BPI maximum limit (Dom Measured CO Pass = CO level not exceeding limit Caution= CO level 25 to too ppm ❑ OK ,II. Caution ❑ JOK �-j Cat JOK "❑ Icaution 60 60 60 ❑ Pass "—[Fail ❑ Pass IN Fall ❑ Pess ❑■ Fall ❑ Pass Fail ❑ Pess � Fail ❑ pass (� Fail 100 100 100 ❑ Pass HNIFait ❑ Pass la Fail ❑ PassliffillFail �-` c�uton O' Caution D caution Residential Mechanical Design Submittal V20140101 Page 5 System Controls Operating Per Design Intent Loral exhaust (all fans) ❑ WA Pass ■ Fall Whole -house ventilation ❑ WA Pass �■ Fall Sub -structural floor exhaust WA ❑ Pass Fail Heating (all systems) ❑ WA Pass Fail Cooling (ell systems) Q N/A Pass Fail Testing tech Qnftiais)F---� Signatures 7echnlclan Al performing inspection and testing documented on this report (Approved Agency) I certify that the tests referenced above, In sections bearing my initials, were performed In accordance with protocols specified by the City of Fort Collins Building Services Department, and that the reported results are accurate to the best of my knowledge. Name (print) M i2. Tme M62 Company 42 Signature and Date �---t Technician #2 performing inspection and testing documented on this report (Approved Agency) I Certify that the tests referenced above, in sections bearing my initials, were performed In accordance with protocols specified by the City of Fort Collins Building Services Department, and that the reported results are accurate to the bast of my knowledge. Na Signature Li HVAC Contractor (City of Fort Collins license holder) I certify that 1 have reviewed this report and that the test results are an accurate representation of the performance of the Installed mechanical systems. Name (print) Tolle Company Signature and Date (� f-% t)IAs2 �a-r M62 19C14 f} 21 r Residential Mechanicat Design Submittal V20140101 Page 6