City of Fort Collins Residential Mechanical Systems Performance Report
This form is a record of testing targets and results, with Pass/Fail outcomes. For information on measurement tools and testing techniques, see the
"Residential New Construction Mechanical Systems Testing Guide." The guide and this form may be periodically updated; check the Building
Services web site for the current version.
This form must be completed and signed by an "Approved Agency," and submitted to Building Services as a requirement for receiving a C.O.
Color
key
Ta et
Measured value
Other
or limit
to compare with
Pass
Fail
Caution
data
target or limit
ADCF = Air Density Correction Factor, based on tool.
ADCF altitude (5000'), air temperature through tool
Volumetric flow (CFM 5000') = ADCF x Indicated flow (CFM)
HouseData
Address !t p ` �� Date n "Residential
Mechanical Systems
Builder �' r. Design Submittal"
4� ie � �� information referenced 7
/ S� � by testing technicians
HVAC contractor �.4� � t, �, �, a 'C4 � S
As -built changes
mach design submt
Testing
2. Local Exhaust (Spot Ventilation)
Bath exhaust
Testing tech (initials)!—I+r-�
Flow Flow box _ Pitot tube duct traverse Air temp/ -
ADCF
tool assive flow hood Other (note below) through tool (F)
Measured Airflow
Design
Minimum Airflow Requirement
Indicated
Volumetric
Exhaust Pickup Location
Airflow(CFM
(CFM 5000')
Flow
Flow
Pass
Fail
+ Type of Operation
(CFM)
(CFM 5000')
5000-)
50 Intermittent — 20 Continuous
151
5
ElSl
L
50 Intermittent _ 20 Continuous
5 (�;
C
❑
X50 Intermittent — 20 Continuous
'�
❑
_ 50 Intermittent &0 Continuous
K
❑
.�
A 50 Intermittent — 20 Continuous
'.,
C
El
50 Intermittent 20 Continuous
_
❑
t
—
50 Intermittent 20 Continuous
❑
❑
Testing
Holes
Kitchen exhaust
N/A
- hood does not vent to outside
Testing tech (initials)
Oven fuel
_ Gas Electric
Minimum airflow requirement (CFM 5000') + operation
— 100 Intermittent — 25 Continuous
Measured airflow
Flow
— Flow box —
flow hood
Flo tube traverse
grid
Tool
— Interior grille
Exhaust duct
Air temp
through ADCF
tool
—Passive —Flow
location
termination not OK)
tool (F)
Powered flow hood
Other (note below)
(Extenor
Indicated flow
CFM
Volumetric flow
CFM 5000' ❑ Pass ❑ Fail
Testing
notes
Residential Mechanical Design Submittal
V20140101
Page 1
I
3. Whole -Dwelling -Unit Ventilation I
Systems other than sub -structural floor exhaust Testing tech (initials)
Code -minimum ventilation airflow L' CFM 5000' Design ventilationCFM 5000' X
(based on CFA and # of BR) J airflow System --t Exhaust -only
Supply -only
type —Balanced
—
Target ventilation airflow range
(cS to IW (e CFM 5000'
otic-minimum) (120 % of design flow)
Measured Airflow
Air Temp
Indicated
Volumetric
Measurement Method
Tool Location
Through
ADCF
Flow
Flow
Pass
Fail
Tool (F)
(CFM)
(CFM 5000')
Total
exhaust
N/A _ Passive flow hood
X.Flow box Pilot tube traverse
r '^ I r�
�,ij1,I��
/ �/{
❑
airflow
_ Flow collar _ Other (note below)
Total
Passive flow hood
supply
_k1A
— Flow box _ Pitot tube traverse
❑
❑
airflow
Flow collar Other (note below)
When supply airflow is circulated by air handler fan, fan speed for measurement
_ Heating _ Cooling _ _ Continuous fan
Balanced airflow in balanced systems
Average of measured
CFM
Target flow range
to
CFM
❑ Pass ❑ Fail
supply + exhaust flows
5000'
(average +/- 15%)
5000'
Testing
notes
-
Sub -structural floor exhaust
tkkr---���
tp N/A -- no sub -structural floor exhaust system
Testing tech (initials)I § t-p
Design exhaust airflow (based on
CFM 5000' Target airflow limits
to
CFM 5000'
approved design)
(design +l- 15%)
Measured airflow
Flow
Tool
location
Air temp❑
through
ADCF
—Flow box _ Plo tube traverse
Passive flow hood _ Flow collar
tool
—
Powered flow hood Other (note below)
tool (F)
Indicated Flow CFM Volumetric flow CFM 5000' ❑ Pass ❑ Fail
Heating + Cooling Duct Leakage
NIA — No ductwork Testing notes
No ductwork outside conditioned space (incl multiple Sys) F_
Testing tech (initials): DOVE 6-9-0�
Duct leakage Energy rater (name,
data source company, testing date): gC�
House conditioned floor area �2 2 sf Air temp ADCF 1 lv 4
(include full basement) .J l through tool (F) t 1
Maximum Allowed Duct Leakage
Measured Duct Leakage
System #1
System #2
Test Parameter and Conditions
Normalized
(CFM25 5000'/ 100 sf)
Absolute
(CFM25 5000')
Indicated
(CFM25)
Volumetric
(CFM25 5000')
Timing
Air Handler
Pass
Fail
Pass
Fail
e
Rough -in
Excluded
4
❑
❑
❑
❑e
ELeakageTypepe
Rough -in
Included
6�
SU❑e
Complete
Included
12
❑
❑
❑
❑Complete
Included
8
❑s
Residential Mechanical Design Submittal
V20140101
Page 2
nn�
5. Heating +-Cooling Equipment
For multiple systems, attach one page per system
System #1 I/ 1 Which parts of house does it serve?
Installed equipment (Be clear about which AC components are installed at time of testing) Testing tech (initialsr//I
Furnace or Boiler
AC or Heat Pump Condenser
AC or Heat Coil
Manufacturer
�O2 i2ZJ'WZ
zY
//Pump
Model #
, `C_
7 // � 4—
Filter asic fiberglass _ Electrostatic
/r C� Type Basic pleated Other: Thickness / MERV
brand �4`�/7 — (inches) (optional)
High-effic pleated CI
F1
Static pressures Testing tech (initials)I ,( /I"/ L
Setup Speed/ -Heating e �( Booling _Cont. fan
-stage for multi -stage equipment
speed tap: /_//i� e
ter damper: N/A
pen (Heating)
Closed (Cooling)
All registers open
dampers open
SP1�
AP Filter -7
(SP1-SP2) L
I
(Same location
SP4 L Z for NSOP,
TFSOP)
4P Coil
(SP7-SP4)
40
k--SP3 Q 3
AP Total ESP
(SP3-SP2)
i
SP2
Cooling: Measured air flow through indoor coil ❑ N/A -- no AC installed Testing tech (initials)l� fir/.('
Design cooling airflow CFM 5000' Target airflow 15%) / —' t / to CFM `5'0-0�0`'."
(high stage) (design +/- 15 /) i, (?
Measured airflow
Flow grid 14 Air temp Flow Resistance
plate size x� 20 throw( )� ADCF / NSOP��j / TFSOP �/� Correction Factor
tool F 1'
6]
Measured airflow, no Indicated airflow /� / Volumetric airflow CFM El Pass
adjustment1correction /3 CFM Measured AF x FRCF /J f/ f CFM Indicated AF x ADC / (/ 5000' ❑ Fail
Testing '9_5 �� ' ` L- LL >%✓0'"i fJZ f 4� L/F S% r L! ,e-�.t C f 1f—/9��
notes Q Y e O C/Q k— 5
Heating: Gas manifold pressure
(high stage)
Testing tech (initials)
Manifold ressure
p �IWD
OEM spec @ 5000' �'
Ta et manifold PC�
limits (spec +/_ 5 %) + 7J to IWC
Measured ❑ Pass
IWC
pressure 2,q El Fail
Heating: Temperature rise
Testing tech (initials)=
OEM temperature rise limits
(high stage)
to 7 F
Measured temps (F): Supply I
air
Return y _ Temp �J Pass
air �V rise G�
Caution: within 10F
El ❑ of top of range
Residential Mechanical Design Submittal
V20140101
Page 3
6. Refrigerant Charge
Testing tech (initials..
Testing approach and targets
❑ N/A: No complete AC system ❑ N/A: House completed November - April (installing contractor responsible for testing in warm weather)
TXV: Subcooling + SH check ❑ Non-TXV: Superheat ❑ OEM -specific: Approach ❑ Other OEM -specific (documentation required)
Temperatures Condenser Non-TXV: Return Target Target Target
(F): entering air temp lb air wet-butemp El superheat subcooling approach
Subcooling
Discharge Condenser Liquid Actual p�TXV Pass: Actual SC within pressure
/L.( saturation T `y F line 2 F subcooling F ✓ S F of target SC, 2 F min
PSI ( (sttoo' chart) (J temp (Cond T - liq line T) /✓ ❑ TXV Fail
Superheat
n / Suction Evaporator Suction Actual ❑ Non-TXV Pass: Actual SH
pressure❑ saturation T❑F line❑F superheat F within +/- 5 F of target SH
i (PSI) 5000'chart) temp suoumer-evapT) ❑Non-TXV Fail
a
TXV checks: ❑Pass: Field -installed TXV installed in accordance with OEM instructions ❑Caution: Actual SH outside mfgr range
Approach
Liquid line�F Actual approaches F El Approach Pass: Actual approach within +1- 1 F of target approach
temp (Liq line T -condenser EAT) ❑Approach Fail
Testing
Room Air Flow + Pressure Balance
Register air flows Testing tech (initials)®
All registers are cut through finish materials and moving air Pass ❑ Fall
(Remainder of register air flow section under development, not yet being enforced)
Pressure balance
Testing tech (initials)
Room
Room -to -Core
Measured
(match names on plans, include
Pressure Drop
Pressure
Pass
Fail
basement if there is a door)
Target Range (Pa)
Drop (Pa)
-3 to +3
�l
❑
-3 to +3
ElVP
Q p
V
-3to+3
�.Z
y(
❑
-3 to +3
❑
/
-3 to +3
, 1
❑
-3 to +3
❑
❑
-3 to +3
❑
❑
-3 to +3
❑
❑
-3 to +3
❑
❑
-3 to +3
❑
❑
Residential Mechanical Design Submittal
V20140101
Page 4
❑ Combustion safety testing N/A -- no natural -draft combustion appliances Testing tech (initials)�(/J/ 7"� t-
(Appliance Types table must be completed for every home) f I
Armliance types
Appliance
Combustion Type
N/A
Draft -hood
Natural -draft
Induced -draft
Natural -draft
Power-
vent
Direct-
vent
Powered sealed -
combustion
Electric
Furnace #1
❑
❑
❑
❑
❑
❑
Furnace #2
❑
❑
❑
❑
❑
❑
Boiler #1
❑
❑
❑
❑
❑
❑
Boiler #2
❑
❑
❑
❑
❑
❑
Water heater #1
❑
❑
❑
❑
❑
❑
Water heater #2
❑
❑
❑
❑
❑
❑
Fireplace #1
❑
❑
❑
❑
❑
❑
Fireplace #2
❑
❑
❑
❑
❑
❑
Other.
❑
❑
❑
❑
❑
❑
Worst -case depressurization performance
# of bath fans on
Vented range hood on
Clothes dryer on
Air handler on
fans on:
Outdoor temperature F
CAZ pressure
doors are closed:
notes:
A
BPI depressurization limit (Pa wrt outside)
Measured net CAZ depressurization (Pa wrt outside)
OK (less negative) I Caution (more negative)
Spillage
BPI maximum limit (seconds
Measured spillage duration (seconds
Pass = duration not exceeding limit
Draft pressure
BPI limit (Pa wrt CAZ
Measured (Pa wrt CAZ
Pass = pressure more negative than limit
CO concentration in undiluted flue gas
BPI maximum limit
Measured CO
Pass = CO level not exceeding limit
Caution = CO level 25 to 100 ppm
Testing
notes
❑ OK ❑ 1 Caution ❑ OK I ❑ I Caution ❑ OK ❑ Caution
60
60
60
❑
Pass
❑ Fail
I ❑
Pass
❑ Fail
❑
I Pass
❑ Fail
❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass I ❑ Fail
Residential Mechanical Design Submittal V20140101 Page 5
9. System Controls
Testing tech (initials)=
System
Controls Operating
Per Design Intent
Local exhaust (all fans)
❑
N/A
Pass
❑
Fail
Whole -house ventilation
❑
N/A
Pass
❑
Fail
Sub -structural floor exhaust
N/A
❑
Fail
Heating (all systems)
❑
N/A
#Pass
❑
Fail
Cooling (all systems)
❑
N/A
❑
Fail
Signatures
Technician #1 performing inspection and testing documented on this report (Approved Agency)
Testing Notes
I certify that the tests referenced above, in sections bearing my initials, were performed in accordance with protocols specified by the
City of Fort Collins Building Services Department, and that the reported results are accurate to the best of my knowledge.
Name (prinP
Title
Company
Signature and Date
Cal.
nn q
Technician #2 performing inspection and testing docunA 0d on this report (Approved Agency)
I certify that the tests referenced above, in sections bearing my initials, were performed in accordance with protocols specified by the
City of Fort Collins Building Services Department. and that the reported results are accurate to the best of my knowledge.
Nat
Signature
HVAC Contractor (City of Fort Collins license holder)
I certify that I have reviewed this report and that the test results are an accurate representation of the performance of the installed mechanical
systems.
Name (print)
Title
Company
Signature and DatE