Loading...
HomeMy WebLinkAbout2238 Bar Harbor Dr - Disclosures/Mechanical - 05/31/2014City of Fort Collins Residential Mechanical Systems Performance Report This form is a record of testing targets and results, with Pass/Fail outcomes. For information on measurement tools and testing techniques, see the "Residential New Construction Mechanical Systems Testing Guide." The guide and this form may be periodically updated; check the Building Services web site for the current version. This form must be completed and signed by an "Approved Agency,' and submitted to Building Services as a requirement for receiving a C.O. Color key Target Measured value Other or limit to compare with Pass Fall aution data target or limit Address �VM Builde �jwfN49 HVAC contractor As -built changes vs� meth design submittal Testing date(s) F71 Bath exhaust e ADCF= Air Density Correction Factor, based on tool, ADCF altitude (5000'), air temperature throu gh tool lVolumetricflow CFM 50001 = ADCF x Indicated flow FM Date of "Residential Mechanical Systems Design Submittal' ��/3 information reference by testing technician Testing tech (initials Yam+' Flo low box _ Pitot tube duct traverse Air tom too _ Passive flow hood Other (note below) through tool (F ADCF Exhaust Pickup Location Design Airflow (CFM Minimum Airflow Requirement (CFM 5000') +Type of Operation Indicated Flow (CFM) Volumetric Flow (CFM 5000') Pass Fail .ry 1 { t �_ .501ntermittent _ 20Contlnuous 7 ❑ 50intermittent _ 20Continuous NU ❑ K6501ntermittent 20Continuous ❑ 501ntermittent 20Continuous ❑ ❑ 501ntermittent 20 Continuous El❑ 501ntermittent 20Continuous El❑ 501ntermittent 20Continuous El Ell Testing notes Kitchen exhaust NIA - hood does not vent to outside 13__ Testing tech (initials Oven fuelL Gas tric Minimum airflow requirement (CFM 5000') + operation _ 1001ntermittent _ 25Continuous Measured airflow Flo — Flow box _ Pilottube traverse Too _Interior grille Air temp❑ too _Passive flow hood _FFlow ow grid locatio —Exhaust duct through ADCF Powered flow hood Other note below (Exterior termination not OK) tool (F) Indicated flo 4FMVolumetric flowCFM 00'Pass ❑ ❑ Fail Testing notes Residential Mechanical Design SubmittalV20140101 Page 1 Systems other than sub -structural floor exhaust Testing tech (initials Code -minimum ventilation airfto Design ventilatio CFM 5000' CFM 5000' haustonl (based on CFA and: of BR) airflo System y f77tYP Supply-only Target ventilation airflow rang D toCFM 5000' Balanced I lmm 10 of del n flPll Air Temp Indicated I Volumetric Measurement Method Tool Location Through I ADCF Flow Flow I Pass Fail Total I N/A _ Passive flow hood /_ I El & A - ow box _ Pitot tube traverse / Jp t ,*mod j n Total _ N/A _Passive flow hood upply _ Flow box _ Pitot tube traverse ❑ Els airflow Flow collar Other (note below) When supply airflow is circulated by air handler fan, fan speed for Balanced airflow In ] Average of measureduredCFM Target flow range CFM ❑passFail ❑ supply + exhaust flow 5000, (average +/- 15%) to 5000' Sub -structural floor exhaust N/A -- no sub -structural floor exhaust system Testing tech (initials) Design exhaust airflow (based on CFM 5000' Target airflow limit to CFM 5000' approved design) (design +/- 15%) Measured airflow Flo too Flow box _ Pilot tube traverse passive flow hood _ Flow collar TOOi I locatio Air tem throng ADCF Powered flow hood Other note below tool (F) Indicated flo FMVolumetric flowCFM 00'PassFail I ❑ ❑ N/A ko ductwork Testing notes ductwork outside conditioned space (incl multiple sy Duct leakage Testing tech (initials): F Energy rater (name, data source House conditioned Floor are (include full baseme Air Air 7� ADCF� sf through tool of (F bdax mum Allowed Du t Leakage Measured DI ct Leakage NormalizeclAbsolu CFM25 5000' / 100 s CFM25 5000' Indicated CFM25 CF Volumetric 25 5000' System #1 stem #2 Leakage Type TiminqAh Handler Passl ail Passl ail Total leakage Rough -in cluded 4 ❑ ❑ ❑ ❑ Total leakage Rough -in Included 6 ❑ ❑ ❑ ❑ Total leakage CompleteIr cluded 12 ❑ ❑ ❑ ❑ Leakager. Complete Included 8 rEl ❑ ❑ ❑ Residential Mechanical Design SubmittalV20140101 Page 2 Cooling For multiple systems, attach one page per system System 90 arts of house does it serve? Installed equipment (Be clear about which AC components are installed at time of testing) Testing tech (initi__-7�r/ Furnace or BoilerAC or Heat m nd nserA r Heat PUMD Coil Manufacturer 06 4.4- Model # %A �Q L R o ?�/ /� 4 GNY0✓ ' /01 $ti Electrostatic Filte Basic fiberglass _ Thi", MERV Type ]tic pleated _Other: bran Hi hpleated(inches) (optional _. 'initials (Same location for NSOP, TFSOP) ,g �rA r UNIA Cooling: Measured air flow through indoor coil - no AC installed Testing tech (initials Design cooling airflo CFM Target airflow limit 5000' 11, to CFM 5000' (high stag "" (design +1- 15% Measured airflow Air tem Flow gri _ 14 L� �Z ADCF ra' NSOP FSOP E Flow Resistance plate size 20thrug tool(F) Correction Facto Measured airflow, no adjustment/correctio CFM Indicated airflo 1 Measured AF x FRC I3 r� CFM Volumetric air1`IoCv� /��/� rCFM Indicated AF x ADCY />o I5000' ''dss ❑Fail Heating: Gas manifold pressure (high stage) Testing tech (initials Manifold pressur �i IwC Target manifold P to IWCIWC Measured® s OEM spec @ 5000' a limits (spec +i- 5%) pressure ❑ Fail Heating: Temperature rise Testing tech (initials OEM temperature rise limits, F (high stag _ • to Suppl _ Return _ Temp 11� Caution: within 10F Measured temps (F): ai al �� — ris �+�esFail ❑ ❑ of top of range Residential Mechanical Design SubmittalV20140101 Page 3 Testing tech (initials Testing approach and targets ❑ N/A: No complete AC systemN/A: Hcu a completed November - April (Installing contractor responsible for testing in warn weather) ❑TXV: Subcooling + SH checkNon&V: SuperheatOEM-specifitapproachOther OEM -specific ❑ (documentation required) Temperatures Condensers Non-TXV: Return s Target Tarlin Targes (F): entering air temp air wet -bulb temp superhea subcoolin approac Subcooling Discharge Condense Liquiq ' Actua ❑ TXV Pass: Actual SC within +/- ressu saturation FFF lin subcoolin 3 F of target SC, 2 F min (PSI) (5000' chart J'' tem (Contl T - Ilq line ❑ TXV Fail Superheat va orat SuctionActual Suctio41) ❑Non-TXV Pass: Actual SH pressuaturatio Tlmesuperheat FFF within +l- 5 F of target SH (5000'chart tern (Suctline T-evap ❑Non-TXV Fail TXV checks: ❑ Pass: Field -installed TXV installed in accordance with OEM instructions El Caution: Actual SH outside mfgr range Approach Liquid Ii in tem Register air flows Actual approac ElApproach Pass: Actual approach within +/-1 F of target approach (Liq line T - condenser EA F ❑ Approach Fail All registers are cut through finish materials and moving air bLmsFail ❑ (Remainder of register air flow section under development, not yet being enforced) Pressure balance Testing tech (initials Testing tech (initial Room (match names on plans, include basement if there is a door) Room -to -Core Pressure Drop Target Range (Pa) Measured Pressure Drop (Pa) Passl ail pbYtl� -3 to +3 ❑ -3 to +3 f' (. ILI❑ YY� -3 to +3 id ❑ -3 to +3 ❑ ❑ -3 to +3 ❑ ❑ 3 to +3 ❑ ❑ -3 to +3 ❑ ❑ -3 to +3 ❑ ❑ -3 to +3 ❑ ❑ -3 to +3 ❑ ❑ Residential Mechanical Design Submitta1V20140101 Page 4 ombustion safety testing N/A — no natural -draft combustion appliances (Appliance Types table must be completed for every home) Appliance types Testing tech (initials Appliance N/A Draft -hood Induced -draft Power- Direct- Powered sealed - Furnace #1 ❑ ❑ ❑ ❑ ❑ ❑ Furnace #2 ❑ ❑ ❑ ❑ ❑ ❑ ❑ Boiler #1 ❑ ❑ ❑ ❑ ❑ ❑ U Boiler #2 ❑ ❑ ❑ ❑ ❑ ❑ ❑ Water heater #1 ❑ ❑ ❑ ❑ ❑ ❑ Water heater#2 ❑ ❑ ❑ ❑ ❑ ❑ ❑ Fireplace #1 ❑ ❑ ❑ ❑ ❑ ❑ ❑ Fireplace #2 ❑ ❑ ❑ ❑ ❑ ❑ ❑ Other: ❑ ❑ ❑ ❑ ❑ ❑ U Worst -case depressurization performance H These doors are closed: # of bath fans on Vented range hood on Clothes dryer on Air handler on Other fans on:Other setup note Outdoor temperatureEDF CAZ pressure BPI depressurization limit (Pa wrt outsidel Measured net CAZ depressurization (Pa wrt outside) OK (less negative) I Caution (more negative) Spillage BPI maximum limit (seconds Measured spillage duration (seconds Pass = duration not exceeding limit Draft pressure BPI limit (Pa wrt CAZ Measured Pass = pressure more negative than limit CO concentration in undiluted flue gas BPI maximum limit Measured CO Pass = CO level not exceeding limit Caution = CO level 25 to 100 ppm (Pa wrt CAZ ❑ OK 1 ❑ Cautlonl ❑ I Caution ❑ OK ❑ Caution 606060 ❑ PassPas ❑ Fail ❑ 1 ❑ FaiIP sU I ❑ Fail Residential Mechanical Design Submitta1V20140101 Page 5 System Controls Operating Per Di m Intent Local exhaust (all fans) ❑ I N/A I Nqpass ❑ Fail Whole -house ventilation ❑ N/A Pass ❑ Fail Sub -structural floor exhaust /A ❑ Pass ❑ Fail Heating (all systems) ❑ N/A A& Pass ❑ Fail Cooling (all systems) ❑ N/APass ❑ Fail Technician #1 performing inspection and testing documented on this report (Approved Agency) I certify that the tests referenced above, in sections bearing my initials, were performed in accordance with protocols specified by the City of Fort Collins Building Services Department, and that the reported results are accurate to the best of my knowledge. Nai Signature Technician #2 performing inspection and testing documented on this report (Approved Agency) I certify that the tests referenced above, in sections bearing my initials, were performed in accordance with protocols specified by the City of Fort Collins Building Services Department, and that the reported results are accurate to the best of my knowledge. Nai Signature HVAC Contractor (City of Fort Collins license holder) I certify that I have reviewed this report and that the test results are an accurate representation of the performance of the installed mechanical systems. Name (print)I Dwayne Shawver Signature and Date Owner `OOF " " `'' 1 ' ' ' Dwayne Shawver IMS Heating & Air, Inc. c L,.% . % ` A „ S r% 111045 Date: 2014.06.03 :U1: Residential Mechanical Design Submitta1V20140101 Page 6