HomeMy WebLinkAbout2033 Kerry Hill Dr - Special Inspections/Engineering - 01/04/2014TD ST U URAL
ENGINEER NG INb
January 4, 2014
Bellisimo Inc.
Ralph Shields
3702 Manhattan Ave # 201
Fort Collins, CO 80526-3207
Observation Report
Project: Spur
Location: 2033 Kerry Hill Drive, Colorado
TDSE Project No.: 13-048
Observation Dates: January 22nd and February 3rd, 2014
Plans/Details: Plans by TD Structural Engineering Ina dated November 22nd, 2013
and revised January le, 2014
Items Observed: footing and foundation sizes and reinforcing, Ufer grounds,
perimeter drain and dampproofing
Notes:
Observations indicate the footing and foundation sizes and reinforcing Is in substantial
conformance with the plans as noted above. In addition the perimeter drain and dampprooSng
Is in substantial conformance with the plans as noted above and geotechnical engineering
report by EEC (project no. 13-01-276). Finally the electrodes (Wer) have been placed in
substantial conformance w►ih thmendat/ons by NEC.
Wendy Thomas DNn
President
TD Structural EnalrN
PPpO RE�,�s
�Os•",�NOMgs''��F�
: A. 0.
iw 38181 0'.�
eN� �Q•r:,� Ft ``•
M Structural Enginmring, Inc. 1 2909 Oxford Ct:, Fort Collins, CO 80525 1 970.372.1 140 1 www.td5tructural.com