Loading...
HomeMy WebLinkAbout2033 Kerry Hill Dr - Special Inspections/Engineering - 01/04/2014TD ST U URAL ENGINEER NG INb January 4, 2014 Bellisimo Inc. Ralph Shields 3702 Manhattan Ave # 201 Fort Collins, CO 80526-3207 Observation Report Project: Spur Location: 2033 Kerry Hill Drive, Colorado TDSE Project No.: 13-048 Observation Dates: January 22nd and February 3rd, 2014 Plans/Details: Plans by TD Structural Engineering Ina dated November 22nd, 2013 and revised January le, 2014 Items Observed: footing and foundation sizes and reinforcing, Ufer grounds, perimeter drain and dampproofing Notes: Observations indicate the footing and foundation sizes and reinforcing Is in substantial conformance with the plans as noted above. In addition the perimeter drain and dampprooSng Is in substantial conformance with the plans as noted above and geotechnical engineering report by EEC (project no. 13-01-276). Finally the electrodes (Wer) have been placed in substantial conformance w►ih thmendat/ons by NEC. Wendy Thomas DNn President TD Structural EnalrN PPpO RE�,�s �Os•",�NOMgs''��F� : A. 0. iw 38181 0'.� eN� �Q•r:,� Ft ``• M Structural Enginmring, Inc. 1 2909 Oxford Ct:, Fort Collins, CO 80525 1 970.372.1 140 1 www.td5tructural.com