HomeMy WebLinkAbout2851 Exmoor Ln - Disclosures/Mechanical - 05/08/2014City of Fort Collins Residential Mechanical Systems Performance Report
This form is a record of testing targets and results, with Pass/Fall outcomes. For Information on measurement tools and testing techniques, see the
'.Residential New Construction Mechanical Systems Testing G uide." The guide and this form may be periodically updated; check the Building
Services web site for the current version.
This form must be completed and signed by an "Approved Agency," and submitted to Building Services as a requirement for receiving a C.O.
Color
key
f k
- ,
. Tar et
8
Measured value
'
or` limit,
to compare with
PasaIF81Caution
.Other
data
targetnrlimit>
���
Testing date(s) I 5- O - 1 "t
ADCF = Air Density Correction Factor, based on tool,
ADCF altitude(5000% air temperature throu gh tool
Volumetric flow CFM 5000' = ADCF x Indicated flow CFM
Local12. • •t Ventilationter
Bath exhaust - Testing tech (initials
A Flo Flow box _ _ Pltot tube duct traverse Air temp �/ , D p
too — PassADCF
ive flow hood _Other (note through tool (F lj
Design
Airflow
Minimum Airflow Requirement
Indicated
Volumetric
Exhaust Pickup Location
(CFM
(CFM 6000')
1+
Flow
Flow
Pass
Fail
500011
Type of Operation
(CFM)
(CFM 6000')
u501ntemiittent_ 20Continuous
? -=
,,r�am/�
�`l.
L
' 60 Intermittent '= 20 Continuous
9
75'
c9L
❑-
INk-4-� _
« 60 Intermittent -_ 20 Continuous;
- 7..L1 i
c�
/,9
❑
60 Intermittent _ 20 Continuous;
_
Q
❑
-
3 '60'Intennittent -_:20 Continuous-
-
'El
E31
-
= 60 Intermittent^_ 20 Continuou'a.
• ,
-
60 Intermittent 20 Continuous
❑_
-
-
_
i Testing..
i notes
1Kitchen exhaust N/A - hood does not vent to outside Testing tech (initials
{ I Oven fuel _G Electric Minimum airflow requirement (CFM 6000') + operation _ 106Infermt1tent _,26 Continuous
!!! 'Measured airflow
i
Flo FlowboxFlowgridPitot ube
traverse.. Tooi(ExterlortennInation
—L Interior Exhaust illeduct_
t Air o gh
Passive flow hood. � Flow rid Exhaust duet through ADCF
too _ Powered flow hood Other (note below)' loeatio not OK) tool (F)
I
t
Indicated flo - CFM Volumetric flo °r "` , " CFM 6000 i❑Pasa Q Fail
7]
Testing
. l notes _
Residential Mechanical Design Submittal V20140101 Page 1
• •Ventilation34
Systems other than sub -structural floor exhaust Testing tech (initials
Code -minimum ventilation airflo T
Design ventilation '
`p CFM 6000' CFM 5000' hs4on
i (based on CFA and # of BR) airflo SystemItElan'ced
IYtyponlyto CFM5000'
Target ventilation airflow rang (cod120y. of desP�nflow'
I Air Temp
Measurement Method Tool Location Through
ADCF I IndicatFlowed I VolFloo metric I Pass I Fail
Total
airflow
1�411A Passiveflow hoodexhaust w box _ Pilot tube traverseHO
_ Flow collar _ Other (note below)
Total
_ N/A _ Passive flow hood -
-
-
supply
Flow box _ Pilot tube traverse,
❑
❑
airflow
-. Flow collar Other (note below)
i
When supply airflow is circulated by air handler fan, fan speed for measurement
_.Heating, _Cooling `_ Continuous fan
rlanced airflow in balanced s stems
Average of measured
CFM
5000'
Target flow range
�<z yy.��U'����
` " '' Atoms--ti -.`
CFM
(('
t❑iPass
fail
supply+exhaustflo
(average
6000'
L:..
resting.
-..
note
Duct leakage
data source
_ Testing tech (initials):
Energy rater (name,
6
company, testing date):
House conditioned floor area
em
(Include full base ) - -
Air temp
sf through tool (F
ADCF
Maximum Allowed Duct Leakage
Measured Duct Leakage
Test Parameter
and Conditions
Normalized
(CFM26 6000' 1100 sf)
Absolute
(CFM26 6000')
Indicated
(CFM26)
Volumetric
(CFM26 6000')
System #1
stem #2
Leakage Type
TimingAh
Handler
Passl
ail
I Pass
ail
Total leakage
Rough -in
eluded
4IIa}
p
riF
-
g:
'. �`❑;.
El
Total leakage
Rough -in
Included
- 6-
Cl
❑l
: ❑
❑
Total leakage
Complete
Included
12 -
�'
.-❑
❑
- ❑.
Leakage
Complete
Included
..: $'.�
'�.
--
❑
El
❑
❑
Residential Mechanical Design Submittal V20140101 Page 2
Cooling
For multiple sys ems, attach one page per system
system # Which parts of house does it serve?
Installed equipment (Be clear about which AC components are installed at time of testing) Testing tech (initials
IManufacturer
Model #
Furnace or Boiler
AC or Heat Pump Condenser
AC or Hpa t Pump Coil
4scr�o�o - �G
C Flits d Basic fiberglass Electrostatic
1 `. Type VBesic pleated Other: Thickness MERV
LLL��bran Hl h�ffi6 leafed (Inches) (optional
�111 "
Static
Cooling: Measured air flow through indoor coil
Design cooling airflo=CFM 6000'
. j (high stage
Measured airflow
I
Teatino tech (Initials
ie location
SOP,
)P)
Testing tech (Initials)
Target airflow Iimi
(design +/-16%) �''� "s t '�� .Egg e- ,k ,�; CFM 6000'
014" no AC installed
Flow grf t4- tool(gpll--�-�] El
plate size 20 throw ADCF NSOP
( tool(FIE]
i Measured airflow, no�CFM Indicated airtlo�CFM
adJustmenUCOReCUO Measured AFx FRC
TFSOP0 Flow Resistance
Correction Facto
Volumetric airfloCFM r❑Pass
tl r Indicated AF x ADC 6000' Fail
Heating: Gas manifold pressure
(high stage)
Testing tech (initials
Manifold pressor �'. IwC
Target manifold P
a" 2"*to �z� +a
IWC MeasuredIWC
OEM spec @ 5000'
limits (spec +/- 6%)
. ?, „, • ,:.
pressure Failn,
ai
Heating: Temperature rise
Testing tech (initials
" OEM temperature rise limits
"', `
2
to
F
IIII (high stage
i
" Sup p
,,Measured temps (F):
!
— Return
o
Temp
:>
,
YPasa
Fail
Caution: within 10F
❑
,_„ ai
ai
ns
;gof top of range
Residential Mechanical Design Submittal V20140101 Page 3
Testing tech (initials=
Testing approach and targets
F—
r r&: No complete AC system '_❑NIA: House completed November -April (installing contractor responsible for testing In mmarher)
��V�7XV: Subcooling + SH
check 'E]Noon-TXV: Superheat �E-OEM-specific: Approach ❑Other OEM -specific (documentation required)
j Temperatures Condenser
Non-TXV: Return Target 'PI ���IMP Target �° * � '
i (F): entering
air temp
apTarget
air wet -bulb temp Superheata� subcoohn 4proach
Subcooling
Discharge
�"
Condenser
Liqui Actual i� TXV Pass: Actual SC within +l-
pressor
c ? (PSI)
saturation
(SOW chart
F lit F subcoolln s F 0—I !3 F of target SC, 2 F min
temp (Cond T-Iiq line �u lnV Fail
P0
Superheat
Suction
Eva orato
P
Suction Actual Non-TXV Pass: Actual SH
P ressu
PSI
_• ( )
saturation
( a000 chart
�
F lin F su erhea F within +l- 6 F of target SH
P (rr���ppp r9
temp
p (Butt una T-evapNOn-TXV Fail
TXV checks -❑Pass: Field4nstalled TXV installed in accordance with OEM ins tractions ❑Caution: Actual SH outside mfgr range
Approach
i ( Liquid IInF
Actual approacF
line T-condenser FJ1
"EIA roach Pass: Actual approach within +/-1 F of large t a
t PP PP t9 approach
temp
(Liq
❑pproach Fail
Testing
note
Register air flows
I "I All registers are cut through finish materials and moving air - Pass Fail
(Remainder of register air flow section under devel opment, not yet being enforced)
Pressure balance
Room
Room -to -Core
Measured
(match names on plans, Include
Pressure Drop
Pressure
basement if there is a door)
Target Range (Pa)
Drop (Pa)
m e�.
- -3 to +3.
�r
5
-3fo+3
3 to +3
3fo+34,'
3to+3
3 to +3
f
,
..
e d V t
3=io+3
X
Testing tech (initials l
T_T
n
Residential Mechanical Design Submittal V20140101 Page 4
,8. Combustion Safety V,
bustio
natura
_ J=11ance safety testing t b — no pletedlfore v comb nation appliances Testing tech (initfa /
Iiance Types table must be completed for every home )
i
Annlianra_ tvnes
Appliance
inn
NIA
—
❑'
Draft -hood
(Natural -draft)
.,: _.❑
Induced -draft
JbilluLd:dDIAL
❑
Power-
vent
Direct-
vent
Powered sealed.
combustion
Electric
, ❑....
Fumace#1
❑.
❑
.
Fumace#2
❑-
;.. ❑
❑-
❑
❑.
❑ _
❑Boiler#1
El
El
El
El
El
El
El
...Boiler#2
❑
°- ❑,_..
. ... .❑ .. ...
._ ❑_.
.:❑
...... ...... ❑.. ,..
❑.: :.
Water heater#1
❑-
❑
❑
❑ °.
::❑
❑
Water heater#2
❑
❑.. _.
..❑.. _..
_ ❑
❑
_. _ ❑,._.. _
❑..
Fireplace #1
El
El
El
El
El
El
ET
Fireplace #2
❑
❑
_ ❑
❑
.❑
❑ __...
❑,.
i
Other.
EJ
Worst -case depressurization performance
Outdoor temperature=F
GAZ pressure
I
BPI depressurization limit (Pa wrt outside)
i
Measured net CAZ depressurization (Pawn outside)
OK (less negative) ( Caution (more negative)
!Spillage
�t BPI maximum limit (seconds
d
i Measured spillage duration (seconds
Pass = duration not exceeding limit
{
''Draft pressure
t BPI limit (Pa wR CAZ,
Measured (Pa wR CAZ
s
i Pass = pressure more negative than limit
CO concentration In undiluted flue gas
? BPI maximum limit
t
i
Measured CO
Pass = CO level not exceeding limit
Caution = CO level 26 to 100 ppm
i Testing
notes
�g
�,
VOK
❑
OK
". ❑.;'
Caution
❑-
.❑•�
Caution
❑
OK
'i'❑k`
: Caution
60 , tr
S
Pass
Fail
_LJ
1pass
LLJ
lFail
I L
jPass
I
lFail
x
jFaii4
❑ _
Pass
�e❑
FairIf,
0:
Pass
�g tt�.
sad❑p:.
❑
Pass
INEAFall
Residential Mechanical Design Submittal V20140101 Page 6
9. System'Gontrois .g �
➢
Testing tech
System
Controls Operating
Per Desl n Intent
Local exhaust (all fans)
❑-
NIA
ass
10
Fall
Whole -house ventilation
❑
N/A
ass
❑
Fall
Sub -structural floor exhaust
A
❑
Pass
Fall
Heating(all systems)
❑
N/A
j0dipass
I—
Fail
Cooling (all systems
/A
; ❑
Pass
Fall
Technician #2 performing Inspection and testing doc umented on this report (Approved Agency)
P-91I certify that the tests referenced above, In sections bearing my initials, were performed in accordance with protocols specified by the
jCity of Fort Collins Building Services Department, and that the reported results are accurate to the best of my knowledge.
performance of the Installed mechanical
Diaitallv signed k
Dwayne Shamer
Date:.2014.05.13
L-:7U -Ub-UU
Residential Mechanical Design Submittal V20140101 Page 6