HomeMy WebLinkAbout3063 Denver Dr - Disclosures/Mechanical - 03/25/2014City of Fort Collins Residential Mechanical Systems Performance Report
This farm is a record of teslingtargets and results, with Pass/Fail outcomes. For information an measurement tools and testing techniques, see the
'Residential Now Construction Mechanical Systems Testing Guide.* The guide and this form may be periodically updated; check the Building
Services web site for the current version.
This form must be completed and signed by an *Approved Agency," and submitted to Building Services as a requirement for receiving a C.O.
Color
key
Ta et
Me red vat a
Other
or limit
to comparewith
Pass
Fall
Idata
Caution
target or limit
L-V ftVO
As-buift way
6 A—;— -
[A[ CF = Air Density Correction Factor, based on too],
ADCIF altitude (5aw), air temperature through tod
V Vc
diumetric flow (CFM 6000') = ADCF x Indicated flow (CFM)
Date of "Residential
Mechanical Systems
Design Submittal'
information referenced
•7: �1 �-7'7
-Z ;� ,
6
Flow IX'Flow box Pilot tube duct traverse Air temp
Amr.r-FITo K3
tr,=9urcd All-qu.-V
Dusiyn
MinimiunAirflow Requirement I Indi cMed nlVoluetric
0w 1 -1—
A
Type at Operation CFM) I(CFM 5000*)
50 Lj, I
ryl
ert Ir 7 a. ..... ....
FE-1
so hirermilteni 20 Continuous i:3 1 0 J.
--2
60 internistant 20. Contirluous Li i U
Testing
Measured alMow
Flow box
Pitut tube traverse
I
Air lamb
Todl—lh[eriorgrille
POwered now road
Utner (note below)
tool (F).
11.0...... M V.;I
Testing
.iesmentiaj hiecrianicat v;^Ct i 4 C. io I
3. Whole-Dwelling-Unit"Ventilation u
Systems other than sub -structural floor exhaust
Testing tech (initials)
Code -minimum ventilation eirfl Design venWaUon CFM 5000'
(' f � � CFM 5000'
`F� ai�OW � '"
X' roust -only
Systemtype
(based on CFA and # of BR) J
Suppycnly'
to q CFM 5000'
Target ventOaUon airflow range � Jr ( l(>
(meo-minlmum) (120%ddesranavw).
_
_Balanced
Measured Alrflow
Air Tamp
Indicated
Volumetric
Measurement Method
Tool Location
Through
ADCF
Flow
Flow
I
Pass
Fail
Too[(F)
(CFM)
(CFM 50001
Total
.exhaust
NIA _ Passive flow hood
gFlow box — Pilot tube traverse
w.1
' (I °!
r l^
`t0
� 5
❑
airflow
Flow cellar _ Other (note below)
1Q ll
V
Total
N/A _ Passive flow lead
❑
❑
supply
_ Flow lox PltcUube traverse
airflow
_
Flow collar. Oilier (note below)
When supply, airnow Iscirculated by arc handler ran; fan speed for measurement
—Heating _ _ - Cooling _ Continuous fan
Balanced airflow in balanced systems
.Average of measured CFM Target flow
supply + exhaust flows 5000' (average+l-
CFM 5000' Pass ❑ Fail.
Sub -structural floor exhaust NIA- no sub -structural floor exhaust system Testing tech (inhlats)=
Design exhaust airflow (based on
CFM 5000' Target airflow limits
to
CFM 5000.
approved design)r-�
(design +I- 15%)
Measuredairflow
Fl
_Flow box - -__
Passive flow hood
Pilot tube traverse
Flow collar
tool
Air` temp
through(F) ADCF
toy
—Powered tow hood _Other
(note below)
location
tool (F)�.
Indicated flow
CFM
Volumetric flow
-
CFM 5000' ❑ Pass ❑ Fall
4' 'Heating + Cooling'.Duct,Leaka a � 'NIA No duchvork Testing noll
outside c
Duct leakage Energy ra
data source company,
House conditioned floo
r or area ' ! �
� hmx anmena u0
fxl
Test Parameter and Conditions
sf L 4j ADCF
through stool (F)
Maximum Allowed Duof Leakage
Normalized Absolute
(CFM25 5000' / 100 ef) (CFM25 5000')
Measured Duct Leakage
Indicated Volumetric
(CFM25) (CFM25 5000')
System tit
System 02
e
Timing
Air Handler
Pass
Fail
Pass
Fail
Rough -In
Excluded
4
-
❑
�.❑
❑
0:
MleaMge
e
Rough4n
Included
6
❑
❑
-❑
El -
Total e
Complete
Included
12❑
❑Complete
Included
8
❑
:❑_.
❑
0
Residential Mechanical Design Submittal - V20140101 Page 2
Heating + ..
For multiple fsystems, attach one page per system
System #I 7 I Which parts o, house does it serve?
Installed equipment (Be dear about which AC components are Installed at time of testing) Testing tech (initials)
Furnace or Boiler
AC or Heat Pump Condenser
AC or Heat Pump Call
Manufacturer^'
Modal
1
_Other,
Filter - Basic fiberglass _ Thickness MERV
brand Shunt-t Type Basic pleated (inches)® (optipnal)a.
High-efllC,pieatetl Electrostatic
uuc
Speed: _Heating ._Cooling 4conl.fan'.
_ High -stage for multi -stage ulpmem
Slower speed tap:_'
Humidifier damper. 4 N/A
_ Open (Heating)
_ Closed (Cooling)
All registers open
Zone dampens open
SPf U, q
AP Filter \
(Wi - ePz) --o h 13
SP2
Testing tech (Inidals)EK]
r (Same location
•'SP4 Ot ., 3,' 'fur Nsop.�
7FSOP)
6P Coil
(SP"N) �uf4�
/
•SP3.0t oil]
{l
AP Total ESP'
(SP39P2) _tit
Cooling: Measured airflow through Indoor coil XN/A—no AC installed Testing tech (initlals)=
Design cooling airflo Target airflow limits to CFM 5000'
(high stag.) CFM 5000' (design +/-15%)
Measured airflow
r temp
plate size _ 20 ��l (F)❑ ADCFNSOP❑ TFSOP❑ Flow Correction lstance
Factor�
Measured airnow. Indicated sirflo = FM Volumetric airflow CFM ❑ Pass
adjustment/correction Mesaurea AF s FRCF IrNimleO AF x ADCF 5000' ❑Fall
Heating: Gas manifold pressure (thgh stage) Testing tech (Inifials)��
Manifold prausum IWC Target manifold P Measured APass
OEM speed 00' 3 is IWC' limits (spec +/-5%), to �O pressure IWC ❑Fail
Heating: Temperature rise Testing tech,('mipals)=
OEM temperature rise limits "'1' - F
(high.tags) 6
supply _ Return _ Terrip Caution:within tOF
Measured tamps (F): ^1 ;�^� /i *'ass
❑Fail El
air `0 air �w. — rise 4 . , . . _ ....... of top of range, . _ .:......
Residential Mechanical Design Submittal V2MdiOlt Page 3
Testing tech (initials)
Testing approach and targets y,,f
❑N/A:Nocomplete ACsystem IEIN/AiHousecompletedNovember- AprilonstaingwaradorresponsiwetmteatingInwarmweanwr)
❑ TXV;check ❑'. Subcooling+SH checNo\n-TXV: Superheat UOEM-specific: Approach ❑Other OEM-speciflc,(aoaimentation repurod)'
Temperatures Condenser Non-TXV::Return Tar et Target Target
(F): entering airaemp� air wet-tiulb,lemp �. superheat-subcoolng= approac
Subcooling
Discharge
pressure
Condenser
saturation T�F
Liquid Actual
UneFF suticooling❑F'
❑ TXV Pass: Actual SGwithin !/=
3 F'of target SC, 2 F min
(PSI)
(swaahan)
tem .trwmdT-ngtneT)
❑TXVFag
Superheat
'
Suction
pressure
Evaporator
saturationT F
Suction Actual
line F. supefieal F
❑ Non-TXV Pass: ActualSH
within +/-.5Fof target SH
(PSI)a
(50'WC en)"
temp[ (Suct inaT-evspn❑
❑Non-TXV Fail
TXV checks: ❑ Pass:
Field -Installed TXV installed in accordance with OEM instructions ❑ Caution: Actual SH outside;mfgr range
Approach
Liquid line
F
Actual approach�F
❑ Approach Pass: Actual approach
within +1- 1 F of larget approach
lamp
M tine T= condenser EAT)
[]Approach Fail
s
' Register air flows Testing tech (initials)
Allregisters are cut through finish .materials and moving. air Vass ❑Fail
(Remainder of register air flow section under development, not yet being enforced)
Pressure balance
Testing tach (initials)
Room
(match names on plans, include
basement If there is a door)
Rooimto-Core
Pressure Drop
Target Range (Pa)
Measured
Pressure
Drop (Pe) .
Pass
Fail
RO FaT I7a
-3 to +3
0, i pj
, Q,
-3to:+3
,' ..
❑.
♦n .r.Pn
--3to+3
^0.1-,*3
P
-3to,+3
❑,
-3 to.+3
❑
-3 to +3
❑
❑
-31c, +3
❑
, ❑":
-3to+3
❑
.❑
-3 to +3
❑
-3 to +3
❑
13
Residential Mechanical Design Submittal V2014(1101 _ :Page 4:
Combustion safety testing WA — no natural -draft combustion appliances Testing tech (Inidals)=
.(Appliance Types table must be completed for every home)
Appliance types
-
Appliance
- Combustion Type
NlA
Draft -hood
Naturaldraft
Induced-0reft
atural-draft
Power-
vent
D1reU•
vent
Powered sealed-
combustion
Electric
Furnace #1
01
❑
❑
❑
❑
❑
❑ .
Furnace #2
.01
❑
❑
- ❑
❑
❑
❑
Boiler#1
01
❑
❑
❑
❑
❑
❑
Boiler #2 -
❑
❑
❑�
❑.
❑
❑
❑
Water heater #1*
❑
❑
❑
❑
❑
❑
❑
Water heater #2
❑
- ❑
❑
- ❑
❑
❑
❑
Fireplace #1
❑
❑
❑
❑
❑
❑
❑
Fireplace #2 .
❑
❑
❑
_ ❑
❑.
❑
❑
Other: -
❑
❑
❑
❑
❑
❑
❑
Worst -case depressurization performance
... Houso seta
These doors are closed:. - - - -
# of bath fans on -
... Ventedrange hood on. -
Clothes dryer on ... - .
_Air handler on -
. . . . .. Other Tans on: Other setup notes:
Tested .appliances - - -
Outdoor temperature=F Appliance '
Location
CAZ.pressure - _
BPI depressurization limit (Pe wrt outside) -
Measured net CAZ depressuriralion (Pa wrt outside)
OK (less negative) I Caution (more negative) ❑ JOK 1 ❑ 1 Caution ❑ JOK I ❑ I Caution ❑ OK ❑ Caution
Spillage
.BPI`maximum limit (seconds)
... Measured spillage duration-. - (seconds)
.. Pass = duration not exceeding limit'
60
so
❑
Pass F❑7 Fall
❑
jPase 1 ❑ Fell
❑
IPaps I ❑ jFpII
.... Draft pressure .. ... ..
Bpi limit - - (Pa wrt CAZ)
. - - Measured .. (Pa wrl CA2) .. -
Pass = pressure more negative than gmft . ❑ Pass ❑. Fail ❑ jPoss 10 IFall ❑ 1pass 10 IFall.
9 ,-$ysteM Controls
System
Controls operating
Per I)esign Intent
Local exhaust (all fens)
WA
Peas
;''�".-
Fail
Whole -house ventilation
[3;.
NIA
Pass.,,
Fail
Substructural floor exhaust
N/A
❑
Pass
E3 '
Fail
Heating (all systems)'❑
NIA
Pass
"
Fail
Cooling (all systems)
WA
T ❑
Pass
0'
Fail
Technician #i performing inspection and testing doeumentedon this report (Approved Agency)
I certify. that the tests referenced above, in sections bearing my Initials, were performedin accordance with protocols specified by the
City of fort Collins Building Services Department, and that the reported results are accurate to the best of my knowledge.
Name (print) i1. e (^t.0 A C: "i
Tifle COnXSilc-�
Company
Signature end Date
Technician ##performing. inspection and testing d ted on this report (Approved Agency)
Icertify that the tests referenced above, in sections bearing my initials; were performed in accordance with protocolsspecified by"the
City of Fort Collins Building. Services Department, and that the reported results are accurate to the best of my knowledge..
Na
Signature
HVAC Contractor (City of Fort Collins: license holder)
I certify that Ihave reviewed this report and that the teal results are. an accurate representation, of, the performance of the installed mechanical
systems.
Nai
Signature
Residential Mechanical Design Submittal V20140101 - Page;6