Re: Foundation Subsurface Drain Observation
2751 Denver Dr
Lot 199, Rigden Farms, Filing No. 6, Final Plat
Fort Collins, Colorado
Dear Larry:
6&bn
. 8inck lorrsrf�ropn�rs=�'�nw=cn
0)30�T3G�
As requested, personnel of RMG Engineers Group (RMG) observed the foundation subsurface
drainage pipe and sump pit perimeter drain system on January 7, 2014. RMG found it to be
complete and in substantial compliance with the design drawings prepared by High Plains
Engineering & Design, LLC for this structure at the date of this observation.
Should you have questions, please feel free to contact our office.
Cordially,
RED
Y :
1/12/14,
24995
Thomas M. Cope, P.E. `rs/0,ftt. ti
Professional Engineer
Southern Office: Central Office: Northern Office:
Colorado Springs, CO Englewood, CO 80112 Evans, CO 80620
719.548.0600 303.688.9475 970.330.1071
Monument: 719.488.2145 Pueblo: 719.544.7750 Woodland Park: 719.687.6077
RMG
G'INEE>
Job No. 140637
December 30, 2013
Journey Homes, Northern CO
7251 W. 20th St., L-200
Greeley, CO 80634
Re: Foundation Damp Proofing
2751 Denver Dr
Lot 199, Rigden Farms, Filing No. 6, Final Plat
Fort Collins, Colorado
Dear Larry:
&bgld Win
6(urYV'ers.tY �aovrp.!h�aw .
As requested, personnel of RMG Engineers Group (RMG) observed the foundation damp
proofing and found it to be complete and in substantial compliance with the design drawings
prepared by High Plains Engineering & Design, LLC for this structure at the date of the
inspection. The damp proof was observed on December 30, 2013.
Should you have questions, please feel free to contact our office.
Cordially,
Thomas M. Cope, P.E.
Professional Engineer
REG
IST
24995
Southern Office: Central Office: Northern Office:
Colorado Springs, CO Englewood, CO 80112 Evans, CO 80620
719.548.0600 303.688.9475 970.330.1071
Monument: 719.488.2145 Pueblo: 719.544.7750 Woodland Park: 719.687.6077
+aiIdin�
.%ivfr:trueutr�
Job No. 140637
December 26, 2013
Journey Homes, Northern CO
7251 W. 20th St., L-200
Greeley, CO 80634
Re: Footing and Foundation Observation
2751 Denver Dr
Lot 199, Rigden Farms, Filing No. 6, Final Plat
Fort Collins, Colorado
Dear Larry:
As requested, personnel of RMG Engineers Group (RMG) observed the footing and foundation
formwork and reinforcing steel for the above referenced single family residential property and
found them to be in substantial compliance with the design drawings prepared by High Plains
Engineering & Design, LLC for this structure. The "Ufer" electrical ground system was placed
in the footing and meet the requirements of Article 250.52(A)(3) of the 2008 National Electrical
Code (NEC). The footings were observed on December 20, 2013 and the foundation walls were
observed on December 26, 2013.
Should you have questions, please feel free to contact our office.
Cordially,
Thomas M. Cope
Professional Engineer
�. R G/,tg %
S M.
l/12/I4 41
24995 `
Southern Office: Central Office: Northern Office:
Colorado Springs, CO Englewood, CO 80112 Evans, CO 80620
719.548.0600 303.688.9475 970.330.1071
Monument: 719.488.2145 Pueblo: 719.544.7750 Woodland Park: 719.687.6077
,ucturei • ueotecnnicai
RMG
NGINEERS
www.nngengincers.com
Job No. 140637
December 19, 2013
Journey Homes, Northern CO
7251 W. 20th St., L-200
Greeley, CO 80634
Re: Open Excavation Observation
2751 Denver Dr
Lot 199, Rigden Farms, Filing No. 6, Final Plat
Fort Collins, Colorado
Dear Larry:
'0C41tffn/if UY
Ab•'k Fvre ! e e Rn.ugTAiuuxs.,
RMG Engineers Group (RMG) conducted a foundation excavation review for a single-family residence
under construction at the above -referenced site located in Fort Collins, Colorado on December 19, 2013.
The upper footings were excavated to the cobbley sandy clay and the lower footings were excavated to
the clayey silty sand, which is similar to those soils described in the Subsurface Soil Investigation, Rigden
Farm — Sixth Filing — Final Geotech, Fort Collins, Colorado, prepared by RMG Engineers Group, RMG
Job No. 139917 and dated October 2, 2013.
RMG did not encounter groundwater within three feet of the proposed footing elevation. The lower
footings will need to be over excavated a minimum two feet (2') in depth due to soft low bearing soils
encountered at the basement footing elevation. The soils supporting the footings will be a low expansive
material. Based on the soil conditions encountered within three feet of the footing level, a continuous
spread footing may be designed and constructed on a minimum two foot (2') of washed aggregate in the
basement level in accordance to the above mentioned Subsurface Soil Investigation.
Should you have questions, please feel free to contact our office.
Cordially,
Thomas A Cope
Professional Engineer
4��,ppCA REG/S
&ZI2/24/13 `sy
24995
'tO�S�ONAI �
Southern Office: Central Office: Northern Office:
Colorado Springs, CO Englewood, CO 80112 Evans, CO 80620
719.548.0600 303.688.9475 970.330.1071
Monument: 719.488.2145 Pueblo: 719.544.7750 Woodland Park: 719.687.6077
F 4
721 4th STREET, SUITE D, FORT l-UPTON, CO 80621 • PHONE: (303)-857-9280 • FAX: (303)-857-9238
February 5, 2014
Journey Homes, LLC
7251 West 20th Street, Building L, Suite 200
Greeley, CO 80634
RE: Framing clarification for the proposed TS-2004 model home at 2751 Denver
Drive, Lot 199, Rigden Farm 6th Filing, Fort Collins, Larimer County, CO
Job # 13-4057
To Whom It May Concern:
The rear porch beams were observed prior to siding. The rear beam was
installed with 2-ply 11 7/8" LSL but the plans specified 3-ply 11 7/8 LSL. The 4-ply
roof bearing beam was installed prior to installing the fasteners per
manufacturer recommendations.
A third ply LSL will be installed at the rear porch bearing beam and the rim
board will be added to the rear porch side beam per plan notes.
The 4-ply LSL beam shall be fastened with 6 3/" TrussLOK screws by FastenMaster
at 12" on center top and bottom. The screws may be installed from one side of
the beam. Please reference the attachment for Multiple Member Connections
For Top Loaded Beams.
Please call this office if you have any questions.
Sincerely,
Todd M. Schroeder, PE ��8��5�``j�
V 0:i4,. ....
Attachment: Trus Joist: Multiple Member Connections For Top Loaded Beams
This report was prepared for the exclusive use of our client and is not intended for any other purpose. Our report is
based on the information made available to us at this time. Should additional information become available, we
reserve the right to determine the impact, if any, of the new information on our opinions and conclusions, and to
revise our opinions and conclusions if necessary and warranted by the discovery of additional information. .