Loading...
HomeMy WebLinkAbout2125 S College Ave - Special Inspections/Engineering - 01/31/2014may: January 31, 2014 MAX Field Construction Office 3000 South College Ave., Suite 201 Fort Collins, CO 80526 fcgov.com/maxconstruction Delivery by hand City of Fort Collins Z I Col l ,e/; 6 k v1& Building Services "Jl , ` 281 North College Avenue Fort Collins, CO 80524 Subject: MAX BRT — Building Permit No. B1300441— Spring Creek Southbound Stop Bus Stop and Station Specialty Inspections To whom it may concern: The MAX BRT stations and stops are nearing final completion. As such, this letter shall serve as a general compliance letter to certify the project was constructed in conformance with the approved plans and specifications and applicable building code. This work includes: 1. Utility installation including electrical, irrigation and communications 2. Subgrade preparation 3. Light pole footing/foundation installation 4. Concrete flatwork paving 5. Structural framing; structural steel, roofing, cladding and connections 6. Surface restoration including architectural concrete paver installation 7. Site amenity installation Personnel from the City of Fort Collins Engineering Department and Ditesco have jointly inspected the construction work. Deficiencies identified during construction have been corrected and accepted. Record drawing information has been documented and will be transferred to final drawings for City of Fort Collins Engineering Departmental use. If you require any further information or supporting documentation, please contact me at 970-988-8605 or Sincerely, @,.�••"'°°�:, j&a z 4���N �Fl; #32976 Keith Mey , P.E. 11 0�w$° Cc: Erika Keeton, PE — City of Fort Collins Engineering Department Ryan Dickinson — Concrete Express, Inc. file Page 1 of 1 Magnetic Particle Examination of Welds Report CLIENT: _ PROJECT: C-.rY"daA LT. jZ444rcler LOCATION C.6 Z !?.t':•M4. SRtilriiilri9'S4� �+I<::tll it r%'i JOB NUMBER: F Dli / ! DATE: �f / - WELD LOCATION AND IDENTIFICATION SKETCH Weld Identification Material thickness 9 -to VIV Weld joint AWS Welding process FGAtb✓ _ Quality requirements - section no. Remarks, .� Weld Identification MWW==Mr:XW��. ■ �I�■r.. r- llll�r.���� , . . The above welds were prepared and tested in accordance with the requirements of the American Welding Society AWS D1.1, Structural Welding Code. Manufacturer or contractor I = Mel d of Inspection: �. _ Dry " "Wet � Residual . Continuous 0 AC 17505C Hall -wave FIELD COPY TO TECHNICIAN _00&61V t�,ig�jp✓ -.. _ LEVEL Ti CTL I THOMPSON CH2M HILL, INC. 9191 S. JAMAICA STREET ENGLEWOOD CO 80112 Date: 1111912013 Report ID: K102566 - FC05942.000 Report of Concrete Compressive Strength Tests Project: MAX BUS RAPID TRANSIT Supplier: MARTIN MARIETTA MASON ST FROM SOUTH OF HARMONY RD TO CHERRY MATERIALS Location: Footing for the Bay Farm foundations. Cast Date: 912012013 Ticket: 49023815 Batch Time: 15.45 Concrete Mix: CD4715 In -Lab Date: 912112013 1 Truck Number: 0314 1 Test Time: 16:40 Specimens Made By: JAY Initial Curing I Final Curing Curing Method: Min. Temp: Max Temp: Curing Method: Tank ° F o F Fog Room Specified Strength (fc) Slump Air Content Density Temperature 4500 psi @ 28 days 6.00 in. 6.5% 141.2 pcf. 83 deg. F Compressive Strengths (ASTM C39) Specimen Age in Diameter Area Max. Load Compressive Percent Type of Number Days (inches) (sq. inches) (lbs.) Strength (psi) of fc Fracture 1 7 4.00 12.57 50,180 1 3990 1 Average:1 3990 1 89 CTLI WYATT Comments: We Z57 ALA Average:1 5580 1 124 cc: MARTIN MARIETTA MATERIALS air temperature of 72 deg F during concrete placement. 351 Linden Street I Suite 140 1 Fort Collins, CO 805241 Phone: 970-206-94551 Fax: 970-206-9441 CH21M HILL, INC. 9191 S. JAMAICA STREET ENGLEWOOD CO 80112 Iw l. r n' D O n 'D A T C n LETTER OF TRANSMITTAL Date: FRIDAY, OCTOBER 11, 2013 Project: MAX BUS RAPID TRANSIT Project No: FC05942.000 WE ARE TRANSMITTING: Weld and/or Bolt Inspection Results FOR DATES: 10/7/2013 REMARKS: See attached summary reports for information. COPIES MAILED TO: 351 Linden Street I Suite 140 1 Fort Collins, CO 80524 1 Phone: 970-206-9455 1 Fax: 970-206-9441 WELD / BOLT INSPECTION REPORT SUMMARY Client Name: CH2M HILL, INC. Project: MAX BUS RAPID TRANSIT Project Number: FC05942.000 Report Number: 15 TYPE OF INSPECTION / APPLICABLE CODE ❑ Visual Weld AWS D1.1-02 Table 6.1 ❑ Magnetic Particle Weld AWS D1.1-02 Sect. 6.10 ❑ Liquid Dye Penetrant Weld AWS 131.1-02 Sect. 6.10 Location and Description of Work: WELDS BOLTS Inspection Date: 10/07/2013 Field Rep: JACK PAPPERT ❑ Ultrasonic Weld ❑ Decking AWS D1.1-02 Sect. 6.13 AWS 01.3-02 Sect. 4.5 ❑O High Strength Bolt AISC Spec. for Structural Joints Using ASTM A 325 or A490 Bolts, Sect. 8 & 9. O Anchor Bolts Project Specifications We inspected the bolted connections of the column cap plates to the overhead beams (ASB B8 3/4-inch diameter stainless steel bolts) for the Spring Creek Station. All of the bolts were in the snug -tight condition or greater with washers installed at the time of our inspection. We also inspected the anchor bolts for the column base plates at the same station. All of the anchor bolts were in the snug -tight condition or greater with washers installed at the time of our inspection. Plans were prepared by Baker, project "FC7073", dated 11/10112. At the time of our inspection, the items observed met the quality standards sited above unless noted below. ❑ Discrepancies were observed, please see the attached Outstanding Discrepancies list. Specific information is presented on the following inspection reports. 351 Linden Street I Suite 1401 Fort Collins, CO 805241 Phone: 970-206-94551 Fax: 970-206-9441 Compaction Test Report CLIENT CH2M HILL, INC. 9191 S. JAMAICA STREET ENGLEWOOD CO 80112 Ir CTL I THOMPSONI • • • r . ■ DATE, 11/25/13 PROJECT NUMBER'. FCO5942.000 Phow 346 REPORT NUMBER: 176 SHEET._ OF SUBJECT: MAX BUS RAPID TRANSIT MASON ST FROM SOUTH OF HARMONY RD TO CHERRY FT COLLINS, CO SLAB -ON -GRADE SUBGRADE - NORTHBOUND AND SOUTHBOUND SPRING CREEK STATIONS t LABORATORY FIELD TEST NO. LOCATION DEPTH TEST TYPE COM- PACTION SOIL TYPE M DENSITY OMC% DENSITY MC% FEET PCF PCF % APPROXIMATE CENTER OF THE SLAB CURVE NO 501 FOR THE SB SPRING CREEK STATION 0.0 NUC 131.5 8.0 125.0 5.2 95 JOB NO FC05942.000 20' S OF THE CENTER OF THE SLAB CURVE NO 502 FOR THE S13 SPRING CREEK STATION 0.0 NUC 131.5 8.0 126.0 5.1 96 JOB NO FC05942000 APPROXIMATE CENTER OF THE SLAB CURVENO 1 503 FOR THE NB SPRING CREEK STATION 0.0 NUC 131.5 8.0 126.0 4.9 96 JOB NO FC05942.000 20' N OF THE CENTER OF THE SLAB CURVE NO 1 504 FOR THE NB SPRING CREEK STATION 0.0 NUC 1 131.5 1 8.0 1126.0 5.2 96 JOB NO FC05941000 t BELOWSUBGRADE SPECIFICATIONS 95 % MAXIMUM MOISTURE WTHIN TO TYPE OF COMPACTION EQUIPMENT AND NO. OF UNITS: JUMPING JACK MOISTURE ADDED BY NOT OBSERVED TYPE OF EARTH MOVING EQUIPMENT AND NO, OF UNITS, ASTM D 1557 THIS REPORT PRESENTS OPINIONS FORMED ASA RESULTOF OUR OBSERVATION OF FILL PLACEMENT, AS WELL AS THE TESTS % OF OPTIMUM SHOWN ABOVE, WE HAVE RELIED UPON THE CONTRACTOR TO APPLY THE NECESSARY COMPACTIVE EFFORT AND MOISTURE TO ACHIEVE SPECIFIED COMPACTION DURING TIMES WHEN OUR OBSERVER IS NOT PRESENT, AND AT LOCATIONS OTHER THAN THOSE TESTED, TEST DATA ARE NOT THE SOLE BASIS FOR OPINIONS ON WHETHER THE FILL MEETS SPECIFICATIONS. THICKNESS OF LIFT 2 INCHES PROGRESS REPORT AS REQUESTED BY GEORGE WITH THE CITY OF FORT COLLINS, SITE VISITS WERE MADE ON 11125/2013 TO OBSERVE AND TEST SLAB -ON -GRADE SUBGRADE FOR THE NORTHBOUND AND SOUTHBOUND SPRING CREEK STATIONS. CEI HAD PLACED AND COMPACTED CLASS 1 STRUCTURAL FILL FROM MARTIN MARIETTA'S SEAWORTH PIT BEFORE WE ARRIVED ON SITE. WE PERFORMED FOUR TESTS AT LOCATIONS SELECTED BY CTL. TEST RESULTS WERE WITHIN SPECIFIED LIMITS. NOTE: AS PER CDOT, THERE IS NO MOISTURE SPECIFICATION FOR THE CLASS 1 STRUCTURAL FILL. OUR OFFICE WILL BE CONTACTED WHEN ADDITIONAL TESTING OR OBSERVATION IS REQUIRED. 501-504 O IN OUR OPINION, FILL COMPACTION MEETS SPECIFICATIONS AS INDICATED BY OUR OBSERVATIONS AND TEST NO (S) IN OUR OPINION, FILL COMPACTION DOES NOT MEET SPECIFICATIONS AS INDICATED BY OUR OBSERVATIONS AND TEST SCOPEOF OBSERVATION, ❑ TIME: Q✓ PERIODIC, ON CALL BASIS: 2ADVIN DCTOR'S OR CLIENTS JACK PAPPERT FIELD REPRESENTATIVE INC. COLLINS 351 Linden Street I Suite 140 1 Fort Collins, CO 805241 Phone: 970-206-94551 BUILDING INSPECTION RECORD Spring Creek SIB Station dimlesco Owner: Contact: Project Name: Project Number: IQS S , City of Fort Collins — Engineering Department Erika Keeton Mason Corridor — MAX BRT 7332 Local Building Official: City of Fort Collins Architect/Engineer: Michael Baker Contractors: General: Concrete Express, Inc. Electrical: Sturgeon Mechanical: N/A Plumbing: N/A Building Permit No: B1300441 Type of Construction: II-B Occupancy Classifications: U-Occupancy Total Bldg Area: 207 ft2 Building General Date Inspector p Footings/Foundations Comments: Completed under separate inspection record. 9/20/13 RUCTL ❑ Concrete Slab / Under -Floor Comments: N/A N/A N/A O Light Gauge Framing Comments: Steel Studs 10/24/13 JB O Sheathing Comments: Plywood Sheathing 10/24/13 JB ❑ Fire -Resistant Penetrations Comments: N/A N/A N/A ❑ Mechanical/Energy Efficiency Comments: N/A N/A N/A 0 Roofing Comments: Sheet Metal Roof 1/15/14 JB ❑ Other Comments: N/A N/A N/A ❑ Final Comments: Building complete and fully accepted. N/A N/A Special Date inspector O Bolt/Weld Inspection Comments: Visual weld inspection. Bolt inspection completed under separate inspection record. 4/22/13 JB/CTL ❑ Special Structural Concrete Comments: N/A N/A N/A ❑ Masonry Comments: N/A N/A N/A ❑ Wood Comments: N/A N/A N/A O Soils/Foundations Comments: Soils tested as part of BRT guideway. Reference BRT testing records. 11/25/13 CTL ❑ Spray -Applied Fireproofing Comments: N/A N/A N/A ❑ Control Svstems Page 1 of 2 Comments: N/A i N/A N/A ❑ Other Comments: Electrical Date Inspector ❑ Underground Comments: Completed under separate inspection record by City of Fort Collins N/A N/A ❑ Rough Walls Comments: Completed under separate inspection record by City of Fort Collins N/A N/A ❑ Rough Ceilings Comments: Completed under separate inspection record by City of Fort Collins N/A N/A ❑ Final Comments: Completed under separate inspection record by City of Fort Collins N/A N/A Plumbing Date Inspector ❑ Underground Comments: N/A N/A N/A ❑ Gas Comments: N/A N/A N/A ❑ Interior Water Comments: N/A N/A N/A ❑ Interior DWV Comments: N/A N/A N/A ❑ Final Comments: N/A N/A N/A Fire Suppression and Alarm Inspection by local jurisdiction N/A N/A Elevator by local jurisdiction or special consultant N/A N/A Note: See attached photographs for further installation record. See daily reports for detailed account of construction progress. I MG_0862 I MG_0868 I MG_2069 I MG_2408 Arch itect/Enciineer Certification I The stamp affixed hereto certifies installation of the marked items in general conformance with the approved project technical specifications and Page 2 of 2 �7 .q 01/16/2014 MKI L iy _ r 1 Sri Yam,.. G . � ': --•s> 09:55 10/24/2013 No Text No Text No Text No Text No Text