Loading...
HomeMy WebLinkAbout2233 Trestle Rd - Disclosures/Blower Door Test - 03/11/2014BUILDING LEAKAGE TEST IZeu i sed des+ Date of Test: 3/11/2014 Test File: Dohn 2233 Trestle Road BD-B Customer: Dohn Construction Technician: Bill Belitz Project Number: Building Address: Type B 2233 Trestle Road Fort Collins, Colorado 80524 Test Results 1. Airflow at 50 Pascals: 1081 CFM50 (+/- 3.3 %) (50 Pa = 0.2 w.c.) 4.81 ACH50 2. Leakage Area: 3. Building Leakage Curve: 4. Test Settings: 5. Accuracy Level 59.4 in2 LBL ELA @ 4 Pa Flow Coefficient (C) = 69.4 ( +/- 24.1 %) Exponent (n) = 0.702 ( +/- 0.066 ) Correlation Coefficient = 0.99556 Test Standard: RESNET Multi -Point Test Test Mode: Depressurization Standard Level of Accuracy Test Infiltration Estimates 1. Estimated Average Annual Infiltration Rate: 2. Estimated Design Infiltration Rate: Cost Estimates 1. Estimated Cost of Air Leakage for Heating: 2. Estimated Cost of Air Leakage for Cooling: � BUILDING LEAKAGE TEST Page 2 of 4 Date of Test: 3/11/2014 Test File: Dohn 2233 Trestle Road BD-B .Building Information Location Climate Information Volume 13474 Ventilation Weather Factor 0.87 Surface Area Energy Climate Factor 17.00 Floor Area 1305 Heating Degree Days 6128 Height Cooling Degree Days 297 #of Bedrooms 2 Design Winter Wind Speed 7.3 mph #of Occupants Design Summer Wind Speed 9.4 mph Year of Construction 2014 Design Winter Temp Diff 73 deg F Wind Shield M Design Summer Temp Diff 15 deg F Heating and Cooling Cost and Efficiency Information Heating Fuel Gas � Heating Fuel Cost Heating E�ciency°/a Cooling Fuel Cost � Cooling SEER � Equipment Information Type Manufacturer Model Serial Number Custom Calibration Date Fan Energy Conservatory Model 3 (110V) Default Micromanometer Energy Conservatory DG700 18086-7 10/4/2013 BUILDING LEAKAGE TEST Page 3 of 4 Date of Test: 3/11/2014 Test File: Dohn 2233 Trestle Road BD-B Depressurization Test: Environmental Data Indoor Temperature(A°F) Outdoor Temperature(d°F) Altitude(ft) 65.0 41.0 ' 4950.0 Data Points Nominal Baseline Adjusted Fan Nominal Adjusted Building Pressure Building Pressure Pressure Flow Flow Fan (Pa) (Pa) (Pa) (cfm) (cfm) % Error Configuration -7.2 n/a n/a -67.9 -61.0 50.7 1289 1270 2.3 Ring A -60.8 -53.9 41.6 1170 1153 1.2 Ring A -56.6 -49.7 33.2 1048 . 1033 -4.0 Ring A -50.0 -43.0 257.8 950 936 -3.7 Ring B -45.1 -38.2 245.0 926 913 2.1 Ring B -38.3 -31.4 181.4 798 787 0.9 Ring B 32.4 -25.5 141.3 705 695 3.3 Ring B -23.7 -16.8 70.6 500 493 -1.9 Ring B -6.6 n/a n/a Time Averaging Perlod: 0 Deviatfons from Standard RESNET Multi-Point Test-Test Parameters None __ . � • BUILDING LEAKAGE TEST Page 4 of 4 Date of Test: 3/11/2014 Test File: Dohn 2233 Trestle Road BD-B Comments None �