Loading...
HomeMy WebLinkAbout1956 Blue Yonder Way - Special Inspections/Engineering - 06/28/2013A.G.2180 South Ivanhoe Street, Suite 5 11 ii V assenaar panvar, Colorado 80222-5710 T 303-759-8100 Fax 303-756-2920 Geotechnical and Environmental Consultants June 28, 2013 D R Horton 9555 South Kingston Court, Suite 200 Englewood, Colorado 80112-5943 Attention: Mr. Tim Karns Subject: Soil and Foundation Study Proposed Residential Structure Lot 13, Block 4 Bucking Horse, Filing 1 Fort Collins, Colorado Project Number 131235 Purpose O www.agwassenaar.com As requested, we have performed a soil and foundation study at the subject site. The purpose of our study was to observe subsurface conditions encountered and to recommend geotechnical design criteria for the design and construction of the foundation for the proposed residence. Additionally, we reviewed partial "Construction Observation and Testing" reports (Earth Engineering Consultants, LLC, Project Number 1124098, dated December 28, 2012 and May 1, 2013) as a portion of our analysis. This letter presents a summary of our findings and recommendations. Subsurface Conditions The field exploration included drilling a 4-inch diameter auger boring near the center of the lot in the upper level to a depth of approximately 36 feet. The subsurface materials encountered consisted of: 0' to 12' Fill, clay, very stiff, silty, sandy, with reprocessed claystone, moist, mottled brown to mottled gray 12' to 171/2' Clay, stiff, silty, sandy, moist, brown to reddish brown 17'/2' to 21' Sand, medium dense, silty, slightly clayey, moist, brown to reddish brown 21' to 33'/2' Sand and Gravel, dense, silty, moist to wet, brown 33'/2' to 36' Claystone (bedrock), very hard, silty, slightly sandy, moist, brown to gray Date of drilling: May 28, 2013 and June 18, 2013 U Depth to water: 20 feet at the time of drilling B1400 Destroyed 6 days after drilling `- No Text No Text No Text No Text No Text No Text No Text No Text D R Horton Project Number 131235 June 28, 2013 Page 8 conditions not indicated by the boring are possible and expected. Therefore,we should be retained to observe the foundation excavation and construction in order to verify or revise our recommendations. If unexpected subsurface conditions are observed by others during construction, we should be called to review our recommendations. This report was prepared for the exclusive use of our Client for the sole purpose of providing geotechnical design criteria for the subject structure based upon the existing site conditions as encountered. The conclusions and recommendations contained in this report shall not be considered valid for use by Others without written authorization from A. G.Wassenaar, Inc. In addition,the state of practice in geotechnical engineering is constantly evolving. Therefore, findings presented in this report should be reviewed and revised, if necessary, prior to actual construction. If we can be of further service in discussing the contents of this letter or in analysis of the proposed structure from the soil and foundation viewpoint, please call our office. Sincerely, A. G. WASSENAAR, INC. o�p0 RE�/sT�� . .,�NANN,yp.FO o . Kat leen A. Noonan, P.E. :� NUIdBER r: Senior Engineer ,�. 32156 :� '•�-�i3,,��,�, Reviewed by: . SS/ONA����\ l 1 �— , Keith D. Seaton, P.E. Senior Engineer KAN/KDS/lia Attachments: Figures 1, 2, and 3 Statement of Services A.G. Wassenaar ' Geotechnical and Environmental Consultants � C• NOTES: 1. DRAIN MUST SLOPE TO A POSITIVE GRAVITY OUTLET AND/OR TO SUMP WHERE WATER CAN BE REMOVED BY PUMPING � // � 2. SLOPE BOTTOM OF TRENCH AND PIPE AT A ���/� /��� ////\ / OR S AP ROVED BYTHOEOGEIOTECHNICAL ENGINEER 3. 4-INCH DIAMETER RIGID PERFORATED PVC PIPE(ASTM D2729 MINIMUM SCHEDULE 20),OR FOUNDATION SUBSTITUTE APPROVED BY GEOTECHNICAL ENGINEER WALL 4. GRAVEL SPECIFICATION: 2"MINUS WASHED ROCK/GRAVEL, POORLY GRADED WITH NO MORE THAN 30%PASSING THE 3/8"SIEVE AND NO MORE THAN 10%PASSING THE#4 SIEVE,OR AS APPROVED BY THE GEOTECHNICAL ENGINEER MINIMUM 10 MIL POLYETHYLENE BARRIER,OR gACKFILL EQUIVALENT APPROVED BY GEOTECHNICAL ENGINEER.ATfACH TO WALL AFfER DAMPPROOFING AND EXTEND AT LEAST 1 FOOT UP ON WALL AND BENEATH FLOW LINE OF PIPE. NON-WOVEN GEOTEXTILE FILTER FABRIC (MIRAFI 140N OR EQUIVALENT APPROVED BY GEOTECHNICAL ENGINEER)PLACED OVER ENTIRE WIDTH OF DRAIN GRAVEL. FOUNDATION VOID SPACE DRAIN GRAVEL(SEE NOTE#4). FILL ENTIRE TRENCH WITH GRAVEL AND EXTEND TO TOP OF VOID. MINIMUM GRAVEL COVER OF 4"IS RE�UIRED. SLIP JOINT 6 CONCRETESLAB a O \/ \/ �/ \ �/ \/ \ �' 9:; • . �// � // � // � // �/ / p:;:��: ' :a q:, . /� /\ /� /\ ///� ///Q �//\ ///\ 0 • +� �: .�:.,: .; . . DRAIN PIPE-(SEE NOTES#2&3 � AT LOCATION OF HIGH POINT, �' ESTABLISH BOTTOM OF DRAIN DRILLED PIER PIPE AT LEAST 8"BELOW BOTTOM OF VOID � � �� MINIMUM EXTEND POLYETHYLENE TO OUTSIDE EDGE OF BOTTOM OF TRENCH PIER FOUNDATION PIER3 FXT SOG TYPICAL EXTERIOR DRAIN DETAI� SEPTEMBER2007 FIGURE 1