HomeMy WebLinkAbout2326 Trestle Rd - Disclosures/Mechanical - 02/13/2014City of Fort Collins
Residential Mechanical Systems Performance Testing Submittal Form
This form is a record of testing targets and results, with Pass/Fail outcomes. For information on measurement tools and testing techniques, see the "Residential New
Construction Mechanical Systems Testing Guide." The guide and this form may be periodically updated; check the Building Services web site for the current version.
This form must be completed and signed by an "Approved Agency," and submitted to Building Services as a requirement for receiving a C.O.
Color key
Measured value to
Target or limit
compare with target o
Pass
Fail
Caution
Other data
Address 2326 Trestle
Builde Homes
HVAC contractoi Northem
Bath exhaust
Testing date(s)02/13/2014
yTfew box _ Flow collar
Airflow measurement metho _ Passive flow hood _ Pilot tube traverse
Temperature of air throug Indicated flow to Volumetric flow multipli�
measurement too 63 F @ 5000', air temperature 1.088
Measured Exhaust Airflow
Operation
Minimum
Indicated
Exhaust Pickup Location
Intermittent or
Airflow
Flow
Volumetric Flow
PassFail
Continuous
Requirement
(CFM)
(CFM 5,000')
(CFM 5000')
masterBath
rmit _ Contin
50 cfm
77
83.776
❑
U.LBath
Intermit _ Contin
50 cfm
79
85.95
❑
wdr
--p-termit _Contin
50 cfm
74
80.51
—
❑
u.1.Bath South
b AW.it _ Contin
50 cfm
69
75.07
cE�—
❑
Intermit Contin
❑
❑
Intermit Conlin
❑
❑
Intermit Contin
❑
❑
Intermit Contin
❑
❑
Kitchen exhaust
Oven fuel
Electric
Exhaust airflow Minimum exhaust airflow requirementCFM 5000'
Operation .termittent Continuous 100 cfm
Measured airflow
Airflow measurement method — Flow box = Flow collar
Pa sive flow hood Pilot tube traverse
Temperature of air through F Indicated flow to Volumetric flow multiplier
measurement tool 63 @ 5000', air temperature
Indicated flow 1136 FM Volumetric flowCFM 5000'
Testing notes (fan speed, masking
flow out of range, .. .
1.088
® Pass ❑ Fail
Mechanical Systems Performance Testing Submittal FormV20120321 1 of 6
�3_ Whole -Dwelling -Unit Ventilation
Systems other than sub -structural floor exhaust
Minimum exhaust airflow requirement
62
FM 5000'
Indicated to
Measured Airflow
Volumetric
Design Airflow
Measurement
Measurement Location +
Flow
Volumetric
Indicated Flow
(CFM 5000')
Method
Air Temperature (F)
Multiplier
Flow
(CFM)
(CFM 5000')
PassfFail
-Jow box
Total
Passive flow hood
ram,
exhaust airflow
= Flow collar
Pitot tube traverse
P%7v,dr
1.088
74
80.5
_ Flow collar
_ Pitot tube traverse
Lj
IM
Total supply airflow
_ Flow box
Passive flow hood
For systems in which supply airflow is circulateclohe air handler fan, fan speed for measuremen Heat Cooling Continuous fan
Balanced airflow in balanced systems
Average of measured suppl
and exhaust flow CFM 5000'
Sub -structural floor exhaust
Design airflow
❑ Pass
CFM 5000'
Target flow rang
(average 715 %) to CFM 5000'
❑ Fail
Measured airflow
Flow box Flow collar
Airflow measurement metho —
_ Passive flow hood _ Pitot tube traverse
Temperature of air through F Indicated flow to Volumetric flow multiplier
measurement tool I I @ 5000', air temperature
Indicated flow CFM Volumetric flow CFM 5000' ❑ Pass ❑ Fail
Temperature of air throug
measurement too 63 F
House conditioned floor area 3986 sf
Indicated flow to Volumetric flow multiplier
@ 5000', air temperature 1 •�8�
Maximum Allowed Duct Leakage I Measured Duct Leakage
Test Parameter and Conditions
Normalized Leakage
(CFM25 / 100 sf)
Absolute
Leakage
(CFM25)
Indicated Flow
(CFM25)
Volumetric
Flow
(CFM25 5000')
Measurement
Timing
Air Handler
Pass/Fail
Total leakage
Rough -in
Excluded
4
❑
❑
Total leakage
Rough -in
Included
6
❑
❑
Total leakage
Complete
Included
12
❑
❑
Leakage to outdoorsC
Implete
Included
$
1259
164
169
❑
Mechanical Systems Performance Testing Submittetfo V20120321
Filter type
BranA skuttle Type I styl Disposable Thicknes 3n inches MERV (optional)
Static pressures (OPTIONAL) ,�G �� Sv AID yCGGoG �6�
Mode: _ Heating
Cooling
_ Continuous Fan
Fan speed tap 1' `tom-Q-4x
Humidifier bypass _ Open
_Closed
A*Rregisters open
Zone dampers open
P=
6P filter =
P=- i
P=+/I
aP AC coil =
1
-OP Total ESP =
Cooling: Measured air flow through indoor coil usirg flow grid
Design cooling airflo CFM 5000' Target airflow limils (design +1-15%) to CFM 5000'
Measured airflow
Cooling fan speed tap
Temperature of air throug F
measurement too 70
NSOP Pa TFSOP Pa
Measured airflow, no adjustments or correction CFM
Volumetric flo CFM 5000' ❑ Pass
Flow grid plate Sal
14 20
Indicated flow to Volumetric flow multipli r
@ 5000', air temperature
Flow Resistance Correction Facto
Adjusted (indicated) airflo CFM
❑ Fail
Heating: Gas manifold pressure
OEM manifold pressur 3 5 IWC Target manifold pressure limits (spec +l- 5 %) 3 to3 IWC
specification, 5000
Measured manifold pressur } j ] IWC^ Pass ❑ Fail
Heating: Temperature rise ` /�
OEM temperature rise limit �^+ C/ to �� F
Measured temperature rise
Return air 1 64 F Supply air 119 F
Temp rise 56 F Pass Fail El Caution: Temp rise within
!ll��� 10 F of top of range
Mechanical Systems Performance Testing SubmittakFo V20120321 3 of 6
(This section under development, not yet being enforced)
Supply air flows (This section underdevelopment, not yet being enforced)
Pressure balance
Pressure difference limit, room -to -core
3 to +3 Pa
Room
Measured pressure
drop (Pa)
Pass
Fail
master Bedroom
+1.4
❑
Bedroom Back Left
+0.7
❑
bedroom back Right
+1.2
�`
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
C
❑
C
Mechanical Systems Performance Testing Submittairfo V20120321 4 et 5
f
8. Combustion
Outdoor temperature F
Worst -case depressurization testing
House setup
Tested appliances
_ # of bath fans on These doors are closed:
_ Vented range hood on
Clothes dryer on
Air handler on
Other fans on
Appiianc,
Typi
Locatioi
CAZ pressure
BPI depressurization limit Pa wrt outside
Measured net CAZ depressurization Pa wrt outside
OK (less negative) I Caution (more negative)
Spillage
BPI maximum limit seconds
Measured spillage duration seconds
Pass = duration not exceeding limit
Draft pressure
BPI limit Pa wrt CAZ
Measured Pa wrt CAZ
Pass = pressure more negative than limit
CO concentration in undiluted flue gas
BPI maximum limit ppm
'J) L row
Pa(?_Qu1 c/ ee 'ng limit �t
C ion = CO level 25 to 100 ppm�/
i 0 ,,
_ Draft -hood
Induced -draft
_ Draft -hood
Induced -draft
_ Draft -hood
Induced -draft
❑ OK ❑ Caution ❑ 4K I Qj.n ❑ K ❑ Caution
60
60
60
❑
ass
❑ ail
❑
Pass
I it
❑
ass
❑ ail
❑ Pass ❑ ❑ as Vail ❑ Pass it s ❑ ail
100
100
100
❑
ass
Elk -ill
❑
Pass
I D1.iI
❑
s
ption
❑ ail
Ej
aution
❑
Caution
❑
Mechanical Systems Performance Testing Submitt•kfo V20120321 5 of 6
9. System Controis
System controls operating per design intent
VOP.M
Pass
Fail
Localexhaust
❑
Whole -house ventilation
❑
Sub -structural Floor exhaust
❑
❑
Heating
❑
Cooling IV 7A
❑
❑
Approved Agency (technician performing i
Name (print) Paul Hi an
Title Energy Rater
Company
Signature and Date
HVAC contractor
Name (print)
Title
Company
Signature and Date
ims license noioer
ad testing documented on this
S Selrvl,
02/ 13/201
Thomas Popp
Journeyma
Northern Colorado A
02/ 17/201
Mechanical Systems Performance Testing Submittairfo V20120321 6 of 6