HomeMy WebLinkAbout2469 Forecastle Dr - Special Inspections/Engineering - 10/20/20110 90 1 Q- E TS T TOTAL ENGINEERING SERVICE, INC. 1601 37" ST. • EVANS, COLORADO 80620. • 970-330-1071 • FAX 970-330-1252 October 20, 2011 Mr. Jeff Demaske Journey Homes, LLC 7251 W. 20t' Street Building L, Suite 200 Greeley, CO 80634 Re: 2469 Forcastle Drive Maple Hill Subdivision Dear Jeff: Total Engineering Service, Inc. (TES) conducted a foundation excavation review for a single- family residence under construction at the above -referenced site located in Ft Collins, Colorado. The footings were excavated to the silty sand, which is similar to those soils described in the. Preliminary Subsurface Exploration Report, Maple Hill Subdivision, prepared by Earth Engineering Consultants, Inc, EEC project number 1002250 and dated January 19, 2001. TES did not encounter groundwater within two feet of the proposed footing elevation. The soils supporting the footings will be a low expansive material. Based on the soil conditions encountered within two feet of the footing level, a continuous spread footing may be designed and constructed in accordance to the above mentioned Preliminary Subsurface Exploration Report. Please contact me if you have any questions concerning. this matter. Sincerely, TOTAL ENGINEERING SERVICE, INC. /,5 ; �e Tom Cope, .E. President 06-298 "'-6 \ A 0cl b I -.-I E 4T S TOTAL ENGINEERING SERVICE, INC. 1601 37th ST. • EVANS, COLORADO 80620 • 970-330-1071 • FAX 970-330-1252 October 21, 2011 Mr. Jeff Demaske Journey Homes, LLC 7251 W. 20th St., Bldg L, Ste. 200 Greeley, CO 80634 RE: Footing and Foundation Observation 2469 Forecastle Drive Maple Hill Subdivision Fort Collins, Colorado Dear Jeff: As requested, Total Engineering Service, Inc. staff observed the footing and foundation formwork and reinforcing steel for the subject single family residential property and found them to be in substantial compliance with the design drawings prepared for this structure. The " Wer electrical ground system was placed in the footing and meet the requirements of Article 250.52(A)(3) of the 2008 National Electrical Code (NEC). The footings were observed on October 20, 2011 and the foundation walls were observed on October 21, 2011. Please give me a call if you have any questions. Sincerely, WaX10---- Tom Cope, P.E. President 06--300 9 U %� T E 4S TOTAL ENGINEERING SERVICE, INC. 1601 37" ST. • EVANS, COLORADO 80620 • 970-330-1071 • FAX 970-330-1252 October 24, 2011 Mr. Jeff Demaske Journey Homes, LLC 7251 W. 20th St., Bldg L, Ste. 200 Greeley, CO 80634 RE: Foundation Damp proofing 2469 Forecastle Drive Maple Hill Subdivision Fort Collins, Colo. Dear Jeff: As requested, Total Engineering staff observed the foundation damp proofing and found it to be complete and in substantial compliance with the design drawings prepared for this structure at the date of this inspection. Please give me a call if you have any questions. Sincerely, "A� z ge Tom Cope, P.E. President 06-300 r•,5/ : � 1�dtuu ll$�1l . ._._. ( � l/ � 9d � � . T E 5 TQTAL ENGINEERING SERVICE, INC. 160137t" ST. • EVANS, COLORADO 80620 • 970-330-1071 • FAX 970-330-1252 October 27, 2011 Mr. Jeff Demaske Journey Homes, LLC 7251 W. 20th St., Bldg L, Ste. 200 Greeley, CO 80634 RE: Foundation Subsurface Drainage System 2469 Forecastle Drive Maple Hill Subdivision Fort Gollins, Colo. � Dear Jeff: As requested, Totai Engineering staff observed the foundation subsurface drainage pipe and sump system and found it to be complete and in substantial compliance with the design drawings prepared for this structure at the date of this observation. Please give me a call if you have any questions. Sincerely, ��t���tmttt�tti��� t4��,���� ������,�,���� ,,�'�Q'`''�;;�p�A5�R9'+C�j'��''"�+`''�� V !'t � � ��'�/ l .� w C ���a��� Tom Cope, P.E. �. �j� �� ` � President �r�,,� '�•�����•_'���'�� #��,�iq'�}p� q �"�'. ,'p�"��"��Cd(Y�E-���1'y��V 06-300 ..._ . ... �"��f���i:t��,xeti�3������.._._..__�.. ' �3 /�� � 0 / � T E S TOTAL ENGINEERING SERVICE, INC. 1fi01 37t�' ST. • EVANS, COLORADO 80620 • 970-330-1071 • FAX 970-330•1252 November 4, 2011 Mr. Jeff Demaske Journey Homes, LLC 7251 W. 20th St., Bidg L, Ste. 200 Greeley, CO 80634 RE: Interior Slab Observation 2469 Forecastle Drive Maple Hill Subdivision, Fort Cnllins, Colo. Dear Jeff: As requested, Total Engineering staff observed the placement of reinforcing steel in the interior slabs and found them to be complete and in substantial compliance with the design drawings �repared for this structure at the date af the inspec#ion. Please give me a call if you have any questions. Sincerely, ��1�$�„p,����� � �'�''`,����'�� "�'��°����`��`'<''�,�.. � � :.�,�,"��`�� ��j�`,�e- . lv �' �,r � � � � « �. : � Tom Cope, P.E. � j% r•�� �" President �'��; �' � ��_,'� �". ��,� *# . >.. � �,�v� ���>r������ALa��1���>`''` ... 06-300 . ._.. ..