HomeMy WebLinkAbout2426 Summerpark Ln - Disclosures/Mechanical - 04/16/2014City of Fort Collins Residential Mechanical Systems Performance Report
This form is a record of testing targets and results, with Pass/Fail outcomes. For information on measurement tools and testing techniques, seethe
"Residential New Construction Mechanical Systems Testing G uide." The guide and this form may be periodically updated; check the Building
Services web site for the current version.
This form must be completed and signed by an "Approved Agency;' and submitted to Building Services as a requirement for receiving a C.O.
Color
key
Target
g
Measured value
Other
to compare with
Pass
Fail
Caution
or limit
target or limit
data
ADCF = Air Density Correction Factor, based on tool,
ADCF attitude (5000'), air temperature throu gh tool
Volumetric flow CFM 5000' = ADCF x Indicated Flow CFM
Address �! L ,a
Date of "Residential
L �!�['l
Mechanical Systems
Builde p�N
Design Submittal' 7 wl�
(f/
information referenced
HVAC contractor ` 1n
by testing technician
As -built changes vs
mech design submittal
Testing date(s)
Bath exhaust Testing tech (Initials
Air temp) /O /.,
Flo low box _ Other belube duct
too flow hood below) through tool
I ADCF
—Passive (note ow)
—Other (note IF
Design
Airflow
Minimum Airflow Requirement
Indicated
Volumetric
Exhaust Pickup Location
(CFM
(CFM 6000')
Flow
Flow
Pass
Fail
500011
+ Type of Operation
(CFM)
(CFM 5000')
!Y1
50 Intermittent _ 20 Continuous
0�
,. ❑..
V, [.
50 Intermittent 20 Continuous
�t,f�11
❑.
SO Intermittent 20 Continuous
[r�1,
01=
❑
50 Intermittent 20 Continuous
❑
❑
50 Intermittent 20 Continuous
❑
❑
50 Intermittent 20 Continuous
❑
❑
50 Intermittent 20 Continuous
❑
❑.
Testing
notes
Kitchen exhaust
N/A - hood does not vent to outsidx 7/_
Testing tech (initials
Oven fuel
— Ga —Electric
Minimum airflow requirement (CFM 6000') + operation
— 100 Intermittent — 25 Continuous
Measured airflow
Flo
too
—Flow box —
— Passive flow hood —
Pitot tube traverse
Flow grid
TooEExhaust
locatio
rior rills
duct
Air temp
p
through
ADCF
Powered flow hood —
Other (note below)
termination not OK)
tool (F)
Indicated flow!
lo CFM Volumetric flo CFM 5000' ❑Pass ❑Fail
Testing
notes
Residential Mechanical Design Submittal V20140101 Page 1
3. Whole -Dwelling -Unit Ventila
Systems other than sub -structural floor exhaust Testing tech (initials
Code -minimum ventilation airflo 1=.[..L1CFM 5000' Design ventilation CFM 5000'
(based on CFA and # of BR) airflo System p[,t:xhaust-only
type _ Supply -only
Target ventilation airflow rang 6,3
to 12 CFM 5000, _ Balanced
code -minimum 120q of design flow
Air Temp
Indicated
Volumetric
Measurement Method
Tool Location
Through
ADCF
Flow
Flow
Pass
Fail
Tool F
CFM
CFM 5000'
Total
_ N/A Passive flow hood
exhaust
_
WIow box _ Pitot tube traverse
airflow
Flow collar Other (note below)
Total
_ N/A _ Passive flow hood
supply
_ Flow box _ Pilot tube traverse
❑
❑
airflow
Flow collar Other (note below)
When supply airflow is circulated by air handler fan, fan speed for measurement
Heating Cooling Continuous fan
Balanced airflow in balanced s stems
Average of measured CFM
Target flow range
CFM
❑Pass
❑Fail
supply + exhaust flow 5000,
(average +1- 15%)
to
5000'
Sub -structural floor exhaust
no sub -structural floor exhaust system
Testing tech (initials
Design exhaust airflow (based on
Target airflow limits
approved design)
CFM 5000'
(design +/- 15 % )
to
CFM 5000'
Measured airflow
Flo
too
— Flow box _
— Passive flow hood _
Pitot tube traverse
Flow collar
Tool
loc o
Airtemp
P
throng ADCF
:]
Powered flow hood _Other
(note below)
tool (F)
Indicated flo
CFM Volumetric Flo
CFM 5000' []Pass
❑Fail
N/A L;o
ductwork Testing notes
ductwork outside conditioned space (Ind multiple sy F
Duct leakage
data source
_ Testing tech (Initials):
_ Energy rater (name,
company, testing date):
House conditioned floor area
(include full baseme I
Air temp
of through tool (F ADCF
Maximum Allowed Duct
Leaks a
Measured Duct Leaks e
Test Parameter
and Conditions
Normalized
(CFM25 5000' 1100 sf)
Absolute
(CFM25 5000'
Indicated
(CFM25)
Volumetric
(CFM25 5000')
System #IS
Istem #2
Leakage Type
TimingAii
Handler
Passi
ail
Pass
ail
Total leakage
Rough -in
cluded
4
❑
❑
❑
1 ❑
Total leakage
Rough -in
Included
6
❑
❑
❑
Total leakage
Complete
included
12
❑
❑
❑
Leakage
outdoorsto
Complete
Included
$
El
❑
❑
Residential Mechanical Design Submittal V20140101 Page 2
For multiple systems, attach one page per system
System # n Which parts of house does it serve?
In
(Be clear about which AC components are installed at time of testing) Testing tech (initials
stauea equipment
Furnace or Boiler AC or Heat PumpCondenser AC or Hea t PumpCoil
Manufacturer
f-�"
J e Basic fiberglass _ Electrostatic
ran ] — Thickness �� MERV 4----{
bran �4 Type #BaWc pleated _Other:
Hi h-effic pleated
(inches) (optional
Static pressures
Testing tech (initials=
(Same location
for NSOP,
TFSOP)
1
v �
Cooling: Measured air flow through indoor coil % ---no AC installed Testing tech (initiaisi ;nas*—
Design cooling airflo `� 2,/Y CFM 5000' Target airflow limi CFM b0'070`''�`�
(high stage J✓ "� (design +1- 15 % )
Measured airflow
Flow gri _'?^
Air temp /
throng /_
ADCF
d
NSOP I u7 J
TFSOPFlow Resistanceplatesize
JE
-14
tool (F) ���GGG
IILL--__//_��III
Correction Factorlh—y—_IL
Measured airflow, no
adjustment/correction
CFM
Indicated airflo
�/
CFM
Volumetric airflo ��/ CFM
/ 5000'
Measured AF • FRC
Indicated AF x ADC
Fail
3Q ?a0
Heating: Gas manifold pressure
Manifold pressure 2y2 WC
OEM spec @ 5000' ✓ 7
Heating: Temperature rise
correA' ;
(high stage)
Target manifold P
limits (spec +I- 5.Y16)
Testing tech (initials 'I--.[�
IWC Measured �- WC 49"ss
pressure []Fail
Testing tech (initials7---.t
OEM temperature rise limits L. to �� F
(high stage 1 r
Measured temps IF): Suppl // `/ Return( � r 1 _ Temp s( �1 •,__s ❑Fail Caution: within 10F
ai /c C ai��L /3f�/ _ll ris of top of range
Residential Mechanical Design Submittal V20140101 Page 3
Testing tech (initials'L--_{
Testing approach and targets �
❑NIA: No complete AC system 64m: House completed November - April (Installing contractor responsible for testing In warmWer)
❑TXV: Subcooling + SH check ❑Non-TXV: Superheat ❑OEM -specific: Approach ❑Other OEM -specific (documentation required)
Temperatures Condenser airw V: Return Q Target1-1 Target
Target
(F): entering air temp air wet -bulb temp superheat subcoolin approach
Subcooling
Discharge Condenser Li ui Actual ❑TXV Pass: Actual SC within+I-
9 q
pressur saturation F line F subcoolin F I--13 F of target SC, 2 F min
(PSI) (5000'chart temp (Gond7-Ilq line ❑:TXV Fail
Superheat
Suction Evaporator Suction Actual ❑Non-TXV Pass: Actual SH
pro saturation F lin F superhea F within +I- 5 F of target SH
(PSI) (5000' chart temp (Suct Ilne T- evap ❑'Non-TXV Fail
TXV checks: []Pass: Field -installed TXV installed in accordance with OEM ins tructions ❑Caution: Actual SH outside mfgr range
Approach jll�'�
Liquid Iin�F Actual approachf--1F ❑Approach Pass: Actual approach within +1- 1 F of targe It approach
temp (Liq line T-contlenser EA ❑Approach Fail
Register air flows
All registers are cut through finish materials and moving air OTass ❑Fail
(Remainder of register air now section under Bevel opment, not yet being enforced)
Pressure balance
Testing tech (initials / -
Testing tech (initials --
Room
(match names on plans, include
basement if there is a door)
Room -to -Core
Pressure Drop
Target Range (Pa)
Measured
Pressure
Drop (Pal
Passl
ail
M
-3to+3
��.1
❑
-3to+3
Z
❑
U��Ol
Y'
-3 to +3
Q
❑
-3 to +3
❑
❑
-3 to +3
❑
❑
-3 to +3
❑
f
-3 to +3
❑
❑
-3 to +3
❑
❑
-3 to +3
❑
❑
-3 to +3
❑
❑
Residential Mechanical Design Submittal V20140101 Page 4
—fCombustion safety testing N/A -- no natural -draft comb ustion appliances
� (Appliance Types table must be completed for every home )
Appliance types
Testing tech (initials /
Appliance
N/AI
Draft -hood
(NaturalAraftl
Induced -draft
(Natural-draftl
Power-
vent
Direct-
vent
Powered sealed -
combustion
Electric
Furnace #1
❑
❑
❑
❑
❑
E�_
❑
Furnace 92
❑
❑
❑
❑
❑
❑
❑
Boiler #1
❑
❑
❑
❑
❑
❑
[f
Boiler#2
❑
❑
❑
❑
❑
❑
❑
Water heater#1
❑
❑
❑
❑
❑
❑
Water heater#2
❑
❑
❑
❑
❑
❑
❑
Fireplace #1
❑
1 ❑
❑
❑
❑
❑
❑
Fireplace #2
❑
❑
❑
❑
❑
❑
❑
Other:
❑
❑
❑
❑
❑
❑
U
Worst -case depressurization performance
# of bath fans on
Vented range hood on
Clothes dryer on
Air handler on
r fans on:
Outdoor temperature = F
CAZ pressure
BPI depressurization limit
doors are closed:
setup notes:
(Pa wn outside)
Measured net CAZ depressurization (Pa wrt outside)
OK (less negative) I Caution (more negative)
Spillage
BPI maximum limit (seconds
Measured spillage duration (seconds
Pass = duration not exceeding limit
Draft pressure
BPI limit (Pa wrt CAZ
Measured
Pass = pressure more negative than limit
CO concentration in undiluted flue gas
BPI maximum limit
Measured CO
Pass = CO level not exceeding limit
Caution = CO level 25 to 100 ppm
(Pa wrt CAZ
❑ OK ❑ Caution ❑ OK I ❑ I Caution I ❑ OK I ❑ Caution
60
60
60
El
Pass
Fail
Pass
I LJ
IFail
I
il
❑ Pass I ❑ Fail ❑ Pass 1 ❑ Fail ❑ Pass ❑ Fail
Residential Mechanical Design Submittal V20140101 Page 5
9. System Controls
System
Controls Operating
Per Desi n Intent
Local exhaust (all fans)
❑
N/A
Pass
❑
Fail
Whole -house ventilation
❑
N/A
Pass
❑
Fail
Sub -structural Floor exhaust
N/A
❑
Pass
❑
Fail
Heating (all systems)
❑
N/A
Pass
❑
Fail
Cooling (all systems)
❑
N/A
ass
,�...;
Fail
Technician #1 performing Inspection and testing doe umerded on this report (Approved Agency)
certify that the tests referenced above, in sections bearing my initials, were performed in accordance with protocols specified by the
City of Fort Collins Building Services Department, and that the reported results are accurate to the best of my knowledge.
Name (print)
Titlt
Company
Signature and Date
'Pa �-�' rn
7 S V Pit% uvr S
Technician #2 performing inspection and testing doe umented on this report (Approved Agency)
I certify that the tests referenced above, in sections bearing my initials, were performed in accordance with protocols specified by the
City of Fort Collins Building Services Department, and that the reported results are accurate to the best of my knowledge.
Nai
Signature
HVAC Contractor (City of Fort Collins license holde r)
I certify that I have reviewed this report and that th a test results are an accurate representation of the
systems.
a Nome (print) Dwayne Shawver
TRW a
Owner
) rI company IMS Heating & Air, Inc. M11 All IFSignature and Dab
performance of the installed mechanical
iaitallv sianed b
_ Dwayne Shawver
Date: 2014.04.16
Residential Mechanical Design Submittal V20140101 Page 6