Loading...
HomeMy WebLinkAbout2426 Summerpark Ln - Special Inspections/Engineering - 01/22/2014Structural • RGeotechnical Fbtttdr'fs17 vfrerluulaiy: lSe.k Fo .F-r Rnera.grh�wwe� ENGINEERS \� n. www.rmgengmeers.com Job No. 141490 January 22, 2014 Journey Homes, Northern CO 7251 W. 20th St., L-200 Greeley, CO 80634 Re: Footing and Foundation Observation 2426 Summerpark Ln Lot 58, Block 20, Maple Hill, Final Plat Fort Collins, Colorado Dear Larry: As requested, personnel of RMG Engineers Group (RMG) observed the footing and foundation formwork and reinforcing steel for the above referenced single family residential property and found them to be in substantial compliance with the design drawings prepared by High Plains Engineering & Design, LLC for this structure. The "Ufer" electrical ground system was placed in the footing and meet the requirements of Article 250.52(A)(3) of the 2008 National Electrical Code (NEC). The footings were observed on January 21, 2014 and the foundation walls were observed on January 22, 2014. Should you have questions, please feel free to contact our office. Cordially, REG v s M. C 1/30/14 24995 Thomas M. Cope, P.E. S�ONAI. Professional Engineer Southern Office: Central Office: Northern Office: Colorado Springs, CO Englewood, CO 80112 Evans, CO 80620 719.548.0600 303.688.9475 970.330.1071 Monument: 719.488.2145 Pueblo: 719.544.7750 Woodland Park: 719,687.6077 Architecture Materials Testing Structural R M V Forensic Geotechnical Civil/Planning ROCKY MOUNTAIN GROUP Job No. 141490 February 11, 2014 Journey Homes, Northern CO 7251 W. 20th St., L-200 Greeley, CO 80634 Re: Foundation Damp Proofing 2426 Summerpark Ln Lot 58, Block 20, Maple Hill, Final Plat Fort Collins, Colorado Dear Larry: As requested, personnel of Rocky Mountain Group (RMG) observed the foundation damp proofing and found it to be complete and in substantial compliance with the design drawings prepared by High Plains Engineering & Design, LLC for this structure at the date of the inspection. The damp proof was observed on February 11, 2014. Should you have questions, please feel free to contact our office. Cordially, 2/26/14 24995 Thomas M. Cope, P.E. Professional Engineer Southern Office: Central Office: Northern Office: Monument: 719.488.2145 Colorado Springs, CO 80918 Englewood, CO 80112 Evans, CO 80620 Woodland Park: 719.687.6077 719.548.0600 303.688.9475 970.330.1071 Erbil/Kurdistan Iraq: 0750 192 99 44 Ulaanbaatar, Mongolia: 976 99106671 www. rmgengineers.com Architecture Materials Testing Structural R M Forensic Geotechnical Civil/Planning ROCKY MOUNTAIN GROUP Job No. 141490 February 11, 2014 Journey Homes, Northern CO 7251 W. 20th St., L-200 Greeley, CO 80634 Re: Foundation Subsurface Drain Observation 2426 Summerpark Ln Lot 58, Block 20, Maple Hill, Final Plat Fort Collins, Colorado Dear Larry: As requested, personnel of Rocky Mountain Group (RMG) observed the foundation subsurface drainage pipe and sump pit perimeter drain system on February 11, 2014. RMG found it to be complete and in substantial compliance with the design drawings prepared by High Plains Engineering & Design, LLC for this structure at the date of this observation. Should you have questions, please feel free to contact our office. Cordially, - p� REG S M. ' 2/26/14� 24995 Thomas M. Cope, P.E. S/ONAL ti Professional Engineer Southern Office: Central Office: Northern Office: Monument: 719.488.2145 Colorado Springs, CO 80918 Englewood, CO 80112 Evans, CO 80620 Woodland Park: 719.687.6077 719.548.0600 303.688.9475 970.330.1071 Erbil/KurdistanIraq: 07501929944 Ulaanbaatar, Mongolia: 976 99106671 www.rmgengineers.com