HomeMy WebLinkAbout2403 Maple Hill Dr - Disclosures/Mechanical - 04/24/2014City of Fort Collins Residential Mechanical Systems Performance Report
This forth Is a record of testing targets and results, with Pass/Fail outcomes. For information on measurement tools and testing techniques, seethe
"Residential New Construction Mechanical Systems Testing Guide:" The guide and this form may be periodically updated; check the Building
Services web site for the current version.
This form must be completed and signed by an "Approved Agency," and submitted to Building Services as a requirement for receiving a C.O.
Color
key
Target
Measured value
�:,Faii
Other
or limit
to
to compare with
pass
auti0m
data
or limit -
R -
ADCF= Air Density Correction Factor, based on tool,
ADCF altitude (5000'), air temperature throu gh tool
Volumetric flow CFM 6000' = ADCF x Indicated flow CFM
Address 1) zi . ��
-
Date of "Residential
-
r 1rNNN��`
Mechanical Systems
Builder -S vre\
Design Submittal'
Information referenced
` J
HVAC contractor 2:tylS ''
by testing technician
As -built changes vs
mach design submittal
- -
Testing date(s)
Bath exhaust
Testing tech (Initials
Flo _94aw box _Pilot tubeducttraverse Air temp) / ./ :,I
too _ Passive flow hood _ Other (note below) ' through tool (F
ADCF
Design
Airflow
Minimum Airflow Requirement
Indicated
Volumetric
Exhaust Pickup Location
(CFM
(CFM 6000')
Flow
Flow
Pass
Fail
gnnnn
+ Type of Operation
(CFM)
(CFM 6000-)
601ntermittent'"_ 20Continuous
V. -
. 60intermittent°_" 20Continuous
-
4
,_.E,.
60lntemtitteM .: " 20Continuous '
601mannittent _ 20Continuous
-
-
❑
601ntermittent • _ 20Continuous
-
❑
��U(
�L--J{y
"
601ntennittent _ 20Continuous
-
❑
'❑I:
-
601ntermittent ` 20Continuoua
"
❑
_E
Testing,
.:...
�.
jnotes
Kitchen exhaust
NIA - hood does not vent to outside —
Testing tech (initials)
Oven fuelL
Gas
Minimum airflow
requirement (CFM 6000') +operation
100IMermittent , 26Contlnuous
Measured airflow
" Flo
i too
— Flow box
— Passive flow hood
_ Pilot tube traverse
_ Flow grid
Too=(FExterioi1'Un'Ct1.n
locatloot
grille
"
Air temp
through ADCF
i
Powered flow hood
Other (note below)
OK)
tool F
Indicated flo
FMVolumetrie flowCFM 000'Pass
'El [ Fail
i ! Testing
..
-
notes
Residential Mechanical Design SubmittalV20140101 Page 1
Systems other than sub -structural floor exhaust Testing tech (Inllals
Code -minimum ventilation airflo 1—=L�CFM 5000' Design ventilatioCFM 6000'
y (based on CFA and # of BR) airflo System haust-onty
' _Supplycnty `
_ toCFM 6000' / tYP _ Balanced
Target ventilation airflow rang V rY
,I code•minimum 120%of design flo
i
Air Temp Indicated Volumetric
Measurement Method Tool Location Through ADCF Flow Flow Pass Fall
Tool F CFM CFM 6000'
Total
J//A _. Passive flow hood
b—
e, haust
\Fmw box - _ Pitot tube traverse
j
/
airflow
_.Flow collar _ Other,(note below)
^J I'
®,
U
Total
N/A Passive flow hood -
- -
supply
_ _
_Flow box Pitot tube traverse
,..�..
Elp,�D(.
airflow
_Flowcoliar'' _ Other (note below)
When supply airflow is circulated by air handler fan, fan speed for measurement
'_ Heating _Cooling - _ Contihuous fan
i
Balanced airflow In balanced systems .
Average of measured CFM Target flow range „„ CFM
" supply + exhaust flo 6000' (average +/- 16%) ` S0 " ` 6000' +❑PassFail
i_ J
Testing _ -
note
Sub -structural floor exhaust oFnrn — no sub -structural floor exhaust system Testing tech (initials
Design exhaust airflow (based on Target airflow Ilmi
aPProved design) -- CFM 6000' (design +/- tb%) a m° CFM 5000,
Measured airflow
! _Flow box _ Plot tube traverse Air temp
Flo Passive flow hood Flow collar Tool throw ADCF
too Iocatio
Powered flow hood _ Other (note below) tool (F)
Indicated flo FMVolumetric flowCFM000'PassFail
Testing
note
LA
N/A — ductwork Testing notes
twork outside conditioned space (Intl multiple ey)
Duct leakage —Testing tech (initials):
Energy rater (name,
data source company, testing date
House conditioned 11 bas,
(Include full baseme 1
sf Air temp ADCF
through tool (F
Maximum Allowed Duct
NormalizedAbsolu
(CFM26 6000' / 100 ef)
Leaks a
(CFM26 6000')
Measured Duct
Indicated
(CFM26)(CF
Leaks a
Volumetric
26 6000')
System #1
stem #2
Test Parameter and Conditions
Leakage Type
TImIngAh
Handler
Pass
ail
Pass
ail
Total leakage
Rough-InE
ccluded
4
❑
_;� 1
❑
01
Total leakage
Rough -in
Included
6
El_
).._II
❑
_O
Total leakage
Completelt
cluded
_ 12`
-
❑
❑-,�i
'❑
_L--J1�
Leakagers
—to
Complete
Included
-.- $ _
3 ;?:
❑
-,.
❑
Residential Mechanical Design SubmittalV20140101 Page 2
Cooling
For multiple systems, attach one page per system
System # efi arts of house does it serve?
Installed equipment (Be clear about which AC components are installed attime of testing) Testing tech (initials
Manufacturer I,. / �Y1/�l */r " �.. iI .CYi ✓L�'
Model # I fir'► X.1'./_'SOdU l (P L I
/ J- Basic fiberglass _ Electrostatic �I
Filte /iJ - Thickness MERV
L j CG �T! Type y�,��� pleated _ Other.
bran Jt.�( e- H fgc leafed (inches) (optional
11
Static pressures Testing tech (initials]
I- n (Same location
SP4 • 'L for NSOP,
Cooling: Measured air flow through indoor coil 5" no AC Installed
Testing tech (initials
`- Design cooling sit
fI:FM
Target airflow lima
5000'
,.:, ; -So tl.
=
ur -; CFM 6000'
(high stage
(design +/- 16%)
Measured airflow
irtemp
Flow
= 2U At
ADCFNSOP SOP
Ii�1
Flow
iz
!, plate size
of (F)I�
F�
Correction Facto
{ Measured airflow, no FM
adjustment/correction
Indicated alrfloCFM
Volumetric airfloCFMPass
6000,
I(
Mass ured AF x FRCJ:::]
Indicated AF x ADC
Fall
.E Testing
{{ notes
�S
He Gas manifold pressure (high stage) Testing tech (Initials T_
i....
Manifold pressure `2 . IWC Target manifold P �� to. IWCIWC Measured
OEM spec @ 6000' J limits (Spec +/. 6%) � pressure Fail
Heating: Temperature rise Testing tech (Initials
OEM temperature
'erise „imiit Uto F
stage
Su I it p� _ Return _ Tern �r , ��Caution: within 10F
=Measured temps (F): Suppi
D ai - ris �3 sFail �'of top of range
Residential Mechanical Design SubmittalV20140101 Page 3
Testing tech (initials)
Testing approach and targets
{;--, I--1
.. �Oi No complete AC systemNlA: House completed November -April (installing contractor responsible for tearing In warm weather)
❑TXV:Subcooling+SH checkNonEkV: SuperheatOEM-specifitapproachOtherOEM-specife_0 (documentation required)
( Temperatures
Condenser Non-TXV: Return Target Ta et Target '
P (F): entering air temp air wet -bulb temp Q superheater subeoolmin approach reF
Subcooling
Discharge
Condenser
Llqui
Actua
,OTXV Pass: Actual SC within +/-
r
i pressurO
saturation
El
I
*ubcoolin
SC, 2 F min
(PSI)
(6000'chart
temp
p
line
( Cond T- Ilq line
QTXV Fall
Superheat
SuctioEll
SuctionActual !❑Non-TXV Pass: Actual SH
! ^! reseurTin, erheat FFF within target SH
P P r9
f (b000'chan temp (Suet llne T -evap El tQNon-TXV Fall
3 ! TXV checks: Pass: Field -installed TXV installed in accordance with OEM Instructions ❑Caution: Actual SH outside mfgr range
s [
Approach
I Liquid Iin F Actual approac F
VApproach Pass: Actual approach within +/-1 F of target approach
�
temp (Llq line T- condenser EA Approach Fail
Testing _
note
17. ROOM s
Register air flows Testing tech (Initials F_J.�
All registers are cut through finish materials and moving air .p _ VFail
(Remainder of register air Row section under development, not yet being enforced)
Pressure balance
Testing tech (Initials /
Room
(match names on plans, Include
basement if there is a door)
Room -to -Core
Pressure Drop
Target Range (Pa)
Measured
Pressure
Drop (Pa)
Pasal
all
-3 to +3
❑�
{
-3 to +3
r 1 b
r
-3 to +3
"
❑
_❑1,
-3 to +3
❑
-3 to +3
❑
-3 to +3
1 ❑
3E],,
-3 to +3
❑
E
-3 to +3
❑
❑f=
-3 to +3 'a, ,
❑_
0
Residential Mechanical Design SubmittalV20140101 Page 4
C bustion safety testing N/A — no natural -draft combustion appliances
(Appliance Types table must be completed for every home)
Appliance types
Testing tech (initials
Appliance
NSA
Draft -hood
Induced -draft
Power-
Direct-
Powered sealed -
Furnace #1
❑
❑
❑
❑
❑
❑
Furnace #2
❑
❑
❑
❑
❑
❑
❑
Boiler#1
` ❑
❑
❑
❑
❑
❑
U
Boiler#2
❑
❑
❑
❑
❑
❑
❑
Water heater #1
❑
❑
❑
❑
❑
❑
Water heater#2
❑
❑
❑
❑
❑
❑
❑
Fireplace #1
❑
❑
❑
❑
❑
Cl
❑_.
Fireplace#2
❑
❑
❑
❑
❑
❑...
❑.
Other:
`.❑
-..❑
.. ❑
: ❑..
.❑
.. -: ❑ ..
[J,:
Outdoor temperature pplianc F
cwc pressure
BPI depressurization limit (Pa wrt outside)
Measured net CAZ depressurization (Pa wit outside)
! OK (less negative) I Cautlon (more negative)
Spillage
11
j BPI maximum limit
11� Measured spillage duration
. I Pass = duration not exceeding limit
!Draft pressure
BPI limit (Pa wrt CAZ
Measured (Pa wrt CAZ
f
Pass = pressure more negative than limit
CO concentration in undiluted flue gas
BPI maximum limit
Measured CO
Pass = CO level not exceeding limit
Caution = CO level 26 to 100 ppm
�t Testing
note
�._$
Residential Mechanical Design SubmittalV20140101
❑
OK
, .❑i
Caution
K❑,
❑:,
Caution
El
KE1
Caution
Page 5
9. System Controls "
Z
System
Controls Operating
Per Desi n Intent
Local exhaust (all fans)
❑
NIA
Pass
'.:
Fail
Whole -house ventilation
❑
NIA
eqPass
7pi;
Fail
Sub -structural Boor exhaust
A
❑
Pass
°�IJFall
Heating (all systems)
NIA
se
�r ❑ir.
Fail
Cooling (all systems)
IA
❑
Pas
` a.
Fail
Testing tech
Testing Notes
Signatures
Te_111chnician #1 performing inspection and testing documented on this report (Approved Agency)
I certify that the tests referenced above, in sections bearing my initials, were performed In accordance with protocols specified by the
,City of Fort Collins Building Services Department, and that the reported results are accurate to the best of my knowledge.
Name (print)
n Title
yy Company
to . ✓_ - /
{i Signature and Date
Technician #2 performing Inspection and testing documentid on this report (Approved Agency)
I certify that the tests referenced above, In sections bearing my Initials, were performed in accordance with protocols specified by the
,c lCity of Fort Collins Building Services Department, and that the reported results are accurate to the best of my knowledge.
r 7
fi
Name (print) -
Title<.
-W
m Company r,
Signature and Date -...
�HVVIAC Contractor (City of Fort Collins license holder)
Icertify that I have reviewed this report and that the test results are an accurate representation of the performance of the installed mechanical
systems.
Name (print) Dwayne StlawVer - v-' '
Diaitall sgned b
Title owner Dwayne Shamer
x
Company IMS Heating & Air, Inc. Date: 2014.04.215
Signature and Date �2:23-06100'
Residential Mechanical Design SubmittalV20140101 Page 6