Loading...
HomeMy WebLinkAbout920 Campfire Dr - Special Inspections/Engineering - 07/17/20130 A.G. aar Geotechnical and Environmental Consultants D.R. Horton 9555 South Kingston Court, Suite 200 Englewood, CO 80112 Attention: Mr. Tim Karns Subject: 920 Campfire Drive Lot 15, Block 2 Trail Head Project Number 121876 Reference: A.G. Wassenaar Report Project Number 121876, Dated 11/27/2012 2180 South Ivanhoe Street, Suite 5 Denver, Colorado 80222-5710 303-759-8100 Fax 303-756-2920 aCa www.agwassenaar.com July 17, 2013 As requested, the following portions of the foundation system were observed on the date(s) . indicated below. It is our opinion that these portions of the foundation system were found to be in substantial conformance with the foundation plan and requirements of the soil report for the subject site. Observations were conducted on a periodic, on -call basis. Date: Observation: 04/11/13 Excavation Observation 06/04/13 Excavation Observation 07/09/13 Excavation and Footing Form Observation 07/11/13 Foundation Wall Reinforcing Steel Observation 07/16/13 Damp -Proofing Observation 07/16/13 Foundation Void Observation 07/16/13 Perimeter Drain Observation Sincerely, 9 �5 A. G, WASSE14R, I J +-7/iiq/ j Kenneth R. Broseghini, Senior Engineer A.G. Wassenaar Geotechnical and Environmental Consultants D.R. Horton 9555 South Kingston Court, Suite 200 Englewood, CO 80112 Attention: Mr. Tim Karns Subject: 920 Campfire Drive Lot 15, Block 2 Trail Head Project Number 121876 Reference: A.G. Wassenaar Report Project Number 121876, Dated 11/27/2012 2180 South Ivanhoe Street, Suite 5 Denver, Colorado 80222-5710 303-75MI00 Fax 303-756-2920 �C® www.agwassenaar.com December 06, 2013 As requested, we performed a slab -on -grade observation at the subject site on the dates) listed below. Our observations indicate the interior slab construction details are in general conformance with the recommendations provided in the soils report prepared for the subject site. If you have any questions regarding our services, do not hesitate to contact our office. Date: Observation: 12/05/13 Slab -On -Grade Observation Sincerely, Senior Engineer