HomeMy WebLinkAbout920 Campfire Dr - Special Inspections/Engineering - 07/17/20130
A.G.
aar
Geotechnical and Environmental Consultants
D.R. Horton
9555 South Kingston Court, Suite 200
Englewood, CO 80112
Attention: Mr. Tim Karns
Subject: 920 Campfire Drive
Lot 15, Block 2
Trail Head
Project Number 121876
Reference: A.G. Wassenaar Report
Project Number 121876, Dated 11/27/2012
2180 South Ivanhoe Street, Suite 5
Denver, Colorado 80222-5710
303-759-8100 Fax 303-756-2920
aCa www.agwassenaar.com
July 17, 2013
As requested, the following portions of the foundation system were observed on the date(s) .
indicated below. It is our opinion that these portions of the foundation system were found to be in
substantial conformance with the foundation plan and requirements of the soil report for the subject
site. Observations were conducted on a periodic, on -call basis.
Date:
Observation:
04/11/13
Excavation Observation
06/04/13
Excavation Observation
07/09/13
Excavation and Footing Form Observation
07/11/13
Foundation Wall Reinforcing Steel Observation
07/16/13
Damp -Proofing Observation
07/16/13
Foundation Void Observation
07/16/13
Perimeter Drain Observation
Sincerely,
9 �5
A. G, WASSE14R, I J +-7/iiq/ j
Kenneth R. Broseghini,
Senior Engineer
A.G. Wassenaar
Geotechnical and Environmental Consultants
D.R. Horton
9555 South Kingston Court, Suite 200
Englewood, CO 80112
Attention: Mr. Tim Karns
Subject: 920 Campfire Drive
Lot 15, Block 2
Trail Head
Project Number 121876
Reference: A.G. Wassenaar Report
Project Number 121876, Dated 11/27/2012
2180 South Ivanhoe Street, Suite 5
Denver, Colorado 80222-5710
303-75MI00 Fax 303-756-2920
�C® www.agwassenaar.com
December 06, 2013
As requested, we performed a slab -on -grade observation at the subject site on the dates) listed
below. Our observations indicate the interior slab construction details are in general conformance
with the recommendations provided in the soils report prepared for the subject site. If you have any
questions regarding our services, do not hesitate to contact our office.
Date: Observation:
12/05/13 Slab -On -Grade Observation
Sincerely,
Senior Engineer