Loading...
HomeMy WebLinkAbout3615 Galileo Dr - Special Inspections/Engineering - 07/06/2011CTLITHOMP80N July 6, 2011 Triton Communities 1490 Santa Fe Drive, Suite 100 Denver, Colorado 80223 Attention: Mr. Cod Jones Subject Summary of Residential Construction Observations Willow Brook Subdivision, Filing 1 Lot 30, 3615 Galileo Drive Fort Collins, Colorado CTL Project No.: FC05516-305 As requested, we provided residential construction observations for Lot 30, 3815 Galileo Drive, in the Willow Brook Subdivision. We were scheduled for the following observations to date: Observation Date ResuIVRemarks Excavation/Footing 6/27/2011 Pass Foundation Wall Steel 6/28/2011 Pass Drain/Dampproof 7/1/2011 Pass The information in our project files indicated there are no outstanding discrepancies for the items listed above and that each was installed in general conformance with the project plans. If we can be of further assistance, please contact us at your Very truly yours, CTL I THQMPSON, INC. Reviews C eo:�e or Grubb R. B. °C Field Department Manager Division Attachments: Excavation/Footing Observation Report Foundation Wall Reinforcement Observation Report Foundation Wall Drain/Waterproofing Observation Report Cc via email: ced@bitoncommunities.com REGis 351 Linden Street I Unit 140 1 Fort Collins, Colorado 80524 Telephone:970-206-9455 Fax:970-206.9441 Excavation/Footing Observation CLIENT: Triton Communities 1490 Santa rive, NO 100 Denver, CO 80223 Cefl Jones Re o meQd�e, Foundafon System - DATED La / &I 1 0 t .._... �SPREAD FOOTINGS MAXIMUM SOIL PRESSURE OF PSE MINIMUM WIDTH —----- INCHES ❑ FOOTINGS WITH MINIMUM DEADLOAD MAXIMUM SOIL PRESSURE OF MINIMUM DEADLOAD PRESSURE OF ______ PSF. PROVIDE A --- INCH VOID BENEATH GRADE BEAMS MINIMUM WIDTH ..,_, , _.._._ INCHES ❑ GRADE BEAMS AND RODS MAXIMUM SOIL PRESSURE OF MINIMUM DEADLOAD PRESSURE OF-- PSF. PROVIDE A INCH VOID BENEATH GRADE BEAMS MINIMUM WIDTH INCHES Fourldation Plan PLAN NO. SAID Y ►C �• DATE WALL FOOTING WIDTH �_ (INCHES) DEPTH �_ (WCHES) A COLUMN PAD _& 7l S& (INCHES) DEPTH /b (INCHES) li COLUMN PAD z YL (INCHES) DEPTH /O (INCHES) REINFORCEMENT AS PER PLAN: RYES ❑ NO ❑ NONE REQUIRED ❑ AT SITE A INSTALLED Soil Conditions At Footing Level UPPER LEVEL Z; C_ CI.�Lit.(' Sa y iAd -- b►- Yam` LOWER LEVEL / G -nct ID r&WY-, Ground Water Conditions NONE IN EXCAVATION NONE ENCOUNTERED IN BORING NO. TO FEET ENCOUNTERED AT _ FEET IN BORING NO. L M Remarks: I x c a a P a a A s R c ADDRESS �bge rud +c � Lp j&qtR LOT AO �_.__.._ BLOCK_ FILING NO. I PROJECT NO.. _[�`•�+ „ 2CI S Foundation Layout ♦ INDICATES APPROXIMATE DEPTHMADTH MEASUREMENT ux Instructions to Contractor 0 FOOTING IN GENERAL CONFORMANCE WITH PLAN ❑ FOOTING REJECTED CONDITIONS IN EXCAVATION AS ANTICIPATED ❑ CONMMNS IN EXCAVATION NOT AS ANTICIPATED, CONTACT GEOTECHNICAL ENGINEER RECOMMENDED CORRECTIVE PROCEDURE Foundation Wall Drain/ Vold/Waterproofing Observation CLIENT: Triton Communities �. _ 1490 Santa Fe Drive Suite 100 Denver, . CO 80223 Foundation Plan BY PLAN NO, Foundation Type SPREAD FOOTINGS ❑ GRADE BEAMS AND PADS ❑ DRILLED FRICTION PIERS ❑ DRILLED PIERS INTO BEDROCK ❑{�FOOTING W/MiNiMUM ❑ OTHER j DeI�Rb.I°AEC�NO.�(1�DATED %� LP�,_„_ Foundation Void ❑ REQUIRED THICKNESS INCHES ❑ MEASURED THICKNESS W . _ INCHES Foundation Wail Condition ❑ EXPOSED STEEL ❑ SURFACE PROBLEMS (HONEYCOMBING, ETC.) (IF CHECKED, SHOW LOCATION ON SKETCH) Recommended Drain Type K EXTERIOR ❑ INTERIOR FIG. I INSTALLED PIPE DIAMETER y INCHES WALL HEIGHT /10 W INCHES DEPTH -TOP OF WALL TO BOTTOM OF TRENCH INCHES SLAB ON GRADE ❑ STRUCTURAL FLOOR ❑ PIPE INSTALLED GRAVEL INSTALLED. GRAVEL SIZE Type of Outlet ❑ GRAVITY, BELOW SEWER 5j 3UMP PIT ❑ UNDERDRAIN SERVICE CONNECTION VISIBLE (AT STUB) ❑ Foundation Void: ❑ IN GENERAL CONFORMANCE WITH RECOMMENDATIONS ❑ REJECTED `, b Foundation Wail Drain: 9 IN GENERAL CONFORMANCE WITH RECOMMENDATIONS ❑ REJECTED 1 Foundation Waterproofing: PQ IN GENERAL CONFORMANCE WITH RECOMMENDATIONS ❑ REJECTED ❑ Exterior insulation MANUFACTURER HEIGHT FEET DISTANCE BELOW FOUNDATION WALL FEET 11111M-I !7 t. o R P o it a r i O ADDRESS: j LOT _ Ad BLOCK _ FILING NO. i PROJECT NO. j�= Foundation Wall Layout RECOMMENDED CORRECTIVE PROCEDURE a