Loading...
HomeMy WebLinkAbout1300 Centennial Rd - Special Inspections/Engineering - 11/19/2010Footing Quality Assurance Observation CTL I THOMPSON Per the client's request, a representative of CTL Thompson has visually observed the footing forms under construction at the site referenced below. The following summarizes our observations and opinions at the time of our visit. Client: k.1 ni �: k, Site Address: 15 6 re Io— b r i V e- 15 Circle rive Ep V1 00l1i n. s Job #: FeoSoaS Lot: Block: Filing: Date: i- -2v o Contact: k.. M jz2_i I yA u Subdivision: Foundation Plan Information Plan By: C TL �'! {'l b11•t DT p yT Tyr Date: 101 ZZq j'2 009 Job#: F'O o S ORS Ftg sizes: Pad sizes : N Concrete on -site? ❑ yes , Rno, (+/- % ftg poured ) Are the footing forms free of loose material, frost, water and or ice, roots, etc?,,W yes , ❑ no Are the Footing / Pad form sizes in general conformance to the above foundation plan? yes , ❑ no Is the footing/pad reinforcing steel in -place on sit ,per the above foundation plan? ❑ yes, ❑ no Weather: ID P-, C(0U - Notes: Summary of Opinions It is our opinion that the footing formwork is in general conformance with the foundation design referenced above. ❑ It is our opinion that the footing formwork differs significantly from the foundation design referenced above (2Id observation required). Corrective action: Field Representative Date ,� sV V �/r• Reviewed By Revised 2010: CTL I Thompson, Inc. 1 351 Linden Street, Suite 140, Ft. Collins, CO 80524