HomeMy WebLinkAbout1300 Centennial Rd - Special Inspections/Engineering - 11/19/2010Footing Quality Assurance Observation
CTL I THOMPSON
Per the client's request, a representative of CTL Thompson has visually
observed the footing forms under construction at the site referenced
below. The following summarizes our observations and opinions at the
time of our visit.
Client: k.1 ni �: k, Site Address: 15 6 re Io— b r i V e-
15 Circle rive Ep V1 00l1i n. s
Job #: FeoSoaS Lot: Block: Filing:
Date: i- -2v o Contact: k.. M jz2_i I yA u Subdivision:
Foundation Plan Information
Plan By: C TL �'! {'l b11•t DT p yT Tyr
Date: 101 ZZq j'2 009 Job#: F'O o S ORS
Ftg sizes:
Pad sizes : N
Concrete on -site? ❑ yes , Rno, (+/- % ftg poured )
Are the footing forms free of loose material, frost, water and
or ice, roots, etc?,,W yes , ❑ no
Are the Footing / Pad form sizes in general conformance to
the above foundation plan? yes , ❑ no
Is the footing/pad reinforcing steel in -place on sit ,per the
above foundation plan? ❑ yes, ❑ no
Weather: ID P-, C(0U -
Notes:
Summary of Opinions
It is our opinion that the footing formwork is in
general conformance with the foundation design
referenced above.
❑ It is our opinion that the footing formwork differs
significantly from the foundation design referenced
above (2Id observation required).
Corrective action:
Field Representative Date
,� sV V �/r•
Reviewed By
Revised 2010: CTL I Thompson, Inc. 1 351 Linden Street, Suite 140, Ft. Collins, CO 80524