HomeMy WebLinkAbout1021 Trading Post Rd - Special Inspections/Engineering - 07/06/201113 //lam / ;:�� (-ep A*G Geotechnical and Environmental Consultants D.R. Horton 7600 East Orchard Road, Suite 350-S Greenwood Village, CO 80111 Attention: Mr. Brian Wright Subject: 1021 Trading Post Road Lot 26, Block 7 Trail Head Project Number 100524 Reference: A.G. Wassenaar Report. Project Number 100524, Dated 3/18/2010 2180 South Ivanhoe Street, Suite 5 Denver, Colorado 80222-5710 303-759-8100 Fax 303-756-2920 0 iwww.agwassenaar.com Revised July 06, 2011 As requested, the following portions of the foundation system were observed on the date(s) indicated below. It is our opinion that these portions of the foundation system were found to be in substantial conformance with the foundation plan and requirements of the soil report for the subject site. Observations were conducted on a periodic, on -call basis: Date: Observation: 05/05/11 Excavation and Footing Form Observation 05/06/11 Foundation Wall Reinforcing Steel Observation 05/10/11 Damp -Proofing Observation 05/10/11, Foundation Void Observation 05/10/11 Perimeter Drain Observation 06/27/11 Crawl Space Observation 06/27/11 Deck and/or Patio Pad Observation 07/05/11 Vapor Retarder Observation Sincerely, A.19. WA Kenneth R. Broseg Senior Engineer Geotechnical and Environmental Consultants D.R. Horton 7600 East Orchard Road, Suite 350-S Greenwood Village, CO 8011.1 Attention: Mr, Brian Wright Subject: 1021 Trading Post Road Lot 26, Block 7 Trail Head Project Number 100524 Reference:. A.G. Wassenaar Report Project Number 100524, Dated 3/18/2010 /�5 /i e elp 2180 South Ivanhoe Street. Suite 5 Denver, Colorado 8=22-5710 303-75"100 Fax 303-7564920 �C www.agwassenaar.com May 11,12011 As requested, the following portions of the foundation system were observed on the date(s) indicated below: It is our opinion that these portions of the foundation system Were found to be in substantial conformance with the foundation plan and requirements of the soil report for the subject site. Observations were conducted on. a periodic, on -call basis. Date: Observation: 05/05/11 Excavation and Footing. Form Observation 05/06/11 Foundation Wall Reinforcing Steel Observation, 05/10/11 Damp -Proofing Observation 05/10/11 Foundation Void Observation 05/10/11 Perimeter Drain Observation Sincerely, Kenneth R. Bros Senior Engineer