HomeMy WebLinkAbout1021 Trading Post Rd - Special Inspections/Engineering - 07/06/201113 //lam / ;:�� (-ep
A*G
Geotechnical and Environmental Consultants
D.R. Horton
7600 East Orchard Road, Suite 350-S
Greenwood Village, CO 80111
Attention: Mr. Brian Wright
Subject: 1021 Trading Post Road
Lot 26, Block 7
Trail Head
Project Number 100524
Reference: A.G. Wassenaar Report.
Project Number 100524, Dated 3/18/2010
2180 South Ivanhoe Street, Suite 5
Denver, Colorado 80222-5710
303-759-8100 Fax 303-756-2920
0 iwww.agwassenaar.com
Revised July 06, 2011
As requested, the following portions of the foundation system were observed on the date(s)
indicated below. It is our opinion that these portions of the foundation system were found to be in
substantial conformance with the foundation plan and requirements of the soil report for the subject
site. Observations were conducted on a periodic, on -call basis:
Date:
Observation:
05/05/11
Excavation and Footing Form Observation
05/06/11
Foundation Wall Reinforcing Steel Observation
05/10/11
Damp -Proofing Observation
05/10/11,
Foundation Void Observation
05/10/11
Perimeter Drain Observation
06/27/11
Crawl Space Observation
06/27/11
Deck and/or Patio Pad Observation
07/05/11
Vapor Retarder Observation
Sincerely,
A.19. WA
Kenneth R. Broseg
Senior Engineer
Geotechnical and Environmental Consultants
D.R. Horton
7600 East Orchard Road, Suite 350-S
Greenwood Village, CO 8011.1
Attention: Mr, Brian Wright
Subject: 1021 Trading Post Road
Lot 26, Block 7
Trail Head
Project Number 100524
Reference:. A.G. Wassenaar Report
Project Number 100524, Dated 3/18/2010
/�5 /i e elp
2180 South Ivanhoe Street. Suite 5
Denver, Colorado 8=22-5710
303-75"100 Fax 303-7564920
�C www.agwassenaar.com
May 11,12011
As requested, the following portions of the foundation system were observed on the date(s)
indicated below: It is our opinion that these portions of the foundation system Were found to be in
substantial conformance with the foundation plan and requirements of the soil report for the subject
site. Observations were conducted on. a periodic, on -call basis.
Date:
Observation:
05/05/11
Excavation and Footing. Form Observation
05/06/11
Foundation Wall Reinforcing Steel Observation,
05/10/11
Damp -Proofing Observation
05/10/11
Foundation Void Observation
05/10/11
Perimeter Drain Observation
Sincerely,
Kenneth R. Bros
Senior Engineer