Loading...
HomeMy WebLinkAbout2138 Ballard Ln - Special Inspections/Engineering - 06/09/2010T S 4E TOTAL ENGINEERING SERVICE, INC 1601 37" ST • EVANS, COLORADO 80620 • 970-330-1071 • FAX 970-330-1252 June 9 2010 Mr Jeff Demaske JW Construction of Northern Colorado 7251 W 20th Street Budding L Suite 200 Greeley CO 80634 Re 2138 Ballard Lane Maple Hill Subdivision Dear Jeff Total Engineering Service Inc (TES) conducted a foundation excavation review for a single- family residence under construction at the above -referenced site located in Ft Collins Colorado The garage footings were excavated to the natural clayey silty sand and the basement footings were excavated to the sdtstone/sandstone bedrock which is similar to those soils described in the Preliminary Subsurface Exploration Report Maple Hill Subdivision prepared by Earth Engineering Consultants Inc EEC project number 1002250 and dated January 19 2001 TES did not encounter groundwater within two feet of the proposed footing elevation The sods supporting the footings will be a low expansive material Based on the soil conditions encountered within two feet of the footing level a continuous spread footing may be designed and constructed in accordance to the above mentioned Preliminary Subsurface Exploration Report Please contact me if you have any questions concerning this matter Sincerely TOTAL ENGINEERING SERVICE INC ;L7:1; Tom Cope P E President 06-297 �NVU nlUiV)/ 49 5