HomeMy WebLinkAbout2138 Ballard Ln - Special Inspections/Engineering - 06/09/2010T
S
4E
TOTAL ENGINEERING SERVICE, INC
1601 37" ST • EVANS, COLORADO 80620 • 970-330-1071 • FAX 970-330-1252
June 9 2010
Mr Jeff Demaske
JW Construction of Northern Colorado
7251 W 20th Street
Budding L Suite 200
Greeley CO 80634
Re 2138 Ballard Lane
Maple Hill Subdivision
Dear Jeff
Total Engineering Service Inc (TES) conducted a foundation excavation review for a single-
family residence under construction at the above -referenced site located in Ft Collins
Colorado
The garage footings were excavated to the natural clayey silty sand and the basement
footings were excavated to the sdtstone/sandstone bedrock which is similar to those soils
described in the Preliminary Subsurface Exploration Report Maple Hill Subdivision prepared
by Earth Engineering Consultants Inc EEC project number 1002250 and dated January 19
2001
TES did not encounter groundwater within two feet of the proposed footing elevation The
sods supporting the footings will be a low expansive material Based on the soil conditions
encountered within two feet of the footing level a continuous spread footing may be designed
and constructed in accordance to the above mentioned Preliminary Subsurface Exploration
Report
Please contact me if you have any questions concerning this matter
Sincerely
TOTAL ENGINEERING SERVICE INC
;L7:1;
Tom Cope P E
President
06-297
�NVU nlUiV)/
49 5