Loading...
HomeMy WebLinkAbout726 Maple St - Special Inspections/Engineering - 05/22/2010Grown Zn owrwi, Uc. Structural Znjitneerin9 11'ns?ectwns May 22 2010 By Design Homes Steve Wluttall P O Box 270457 Fort Collins CO 80527 Re Perimeter Dram and Damproofmg Observation at 726 Maple St Fort Collins CO Crown Engineering llc Project No 29 01 10 06 Gentlemen We have visually observed the damproofing and perimeter dram being installed around the exterior perimeter of the basement of the home under construction at the above referenced location The dram consists of 4 perforated pipe It is placed around the basement perimeter and covered with approximately 10 plus or minus of 1/2 or less graded gravel It is our opinion that the damproofing and perimeter dram as installed is an adequate means of drammg any ram or irrigation water that may filtrate down to the basement elevation of the home Thank you for consulting with us on this phase of the project If you have any questions please do not hesitate to contact me at (970) 691 4239 Main Office 524 Stove Street Fort Collms Colorado 80524 Phon (970)498-9537 C ll (970) 691-4239 Grown Z"iwzrmi, tic. Strc4ctt4rat Znginetr"* inrctwns May 22 2010 By Design Homes Steve Whittall P O Box 270457 Fort Collins CO 80527 Re Footing Observation at 726 Maple St Fort Collins CO Crown Engineering 11c Project No 29 01 10 04 Gentlemen We have visually observed the footing sizes at the residence under construction at the above referenced location It is our opinion that the footing sizes and widths were in general conformance with the foundation plan drawn by Carson Design Studio llc and Crown Engineering llc Job No 29 01 10 01 If you have any questions please do not hesitate to contact me at (970) 691-4239 Sincerely GrOWit �ft� GISt� y' v to o PE Structural Main Office 524 Stover Street Fort Collms Colorado 80524 Phone (970)498-9537 Cell (970) 691-1239 e mail reyessf5Qmsn com Grown Zn9ownn9, ttc. Structumcl zsu1sneenng 4 Imrctwns May 22 2010 By Design Homes Steve Whlttall P O Box 270457 Fort Collins CO 80527 Re Wall Steel Observation for 726 Maple Street Fort Collins CO Crown Engmeermg llc Project No 29 01 10 05 Gentlemen We have visually observed the concrete foundation wall steel reinforcing placed in the forms at the residence under construction at the above referenced location It is our opinion that the reinforcement was m general conformance with the foundation plan drawn by Carson Design Studio llc and Crown Engmeermg 11c Job No 29 01 10 01 dated March 15 2010 If you have any questions please do not hesitate to contact me at (970) 691 4239 Smcerely 6TOWIff. Reyes�'arnu�to P E Structural Et'nanearn., Main Office 524 Stove Street Fort Colhns Colorado 80524 Phone (970) 498-9537 Cell (970) 691-4239 e mail reyessf5@msn com