Loading...
HomeMy WebLinkAbout2238 Ballard Ln - Special Inspections/Engineering - 04/22/2010PROGRESSIVE ENGINEERING & CONSULTING LLC 404 IMMIGRANT TRAIL WINDSOR CO 80550 (970) 590 6059 April22 2010 J&J Construction of Northern Colorado 7251 W 20t' Street Bldg L Suite 200 Greeley CO 80634 RE Footing and Foundation Inspection 2238 Ballard Lane Maple Hill Subdivision Fort Collins CO Job No 09 004 Gentlemen As requested I inspected the footing formwork footing reinforcing steel and ufer ground connection at the subject single family residence At the time of this inspection the footing formwork and the placement of reinforcing steel were in substantial conformance with the design drawings prepared for this structure I also observed the installation of a 20 long piece of reinforcing steel tied to the footing reinforcement to be utilized as a Ufer ground The footing inspection was performed on March 30 2010 The foundation wall formwork and reinforcing steel were inspected on April 1 2010 At the time of this inspection the foundation formwork and placement of reinforcing steel were in substantial conformance with the design drawings prepared for this structure Please give me a call if you have any questions or if I may be of further assistance Sincerely 49,0p4 REQkp ts� sOpr E 80,6 �0 Greg Bowdt§" E z j y 0 s►01NAI0 0m MN PROGRESSIVE ENGINEERING & CONSULTING LLC 404 IMMIGRANT TRAIL WINDSOR CO 80550 (970) 590-6059 April22 2010 J&J Construction of Northern Colorado 7251 W 20t' Street Bldg L Suite 200 Greeley CO 80634 RE Foundation Damp Proofing and Perimeter Dram Inspection 2238 Ballard Lane Maple Hill Subdivision Fort Collins CO Job No 09 004 Gentlemen As requested I inspected the foundation damp proofing for the subject property on April 5 2010 The foundation perimeter drain was inspected on April 5 2010 Based on these visual inspections it is my opinion that these items were installed in substantial conformance with the design drawings prepared for this structure Please give me a calkW yoi& eve any questions or if I may be of further assistance F4p#'01pQ REGJ�TF9 Sincerely �p� �OQ� E Bp*'o FD s /??/,b �r } s � s s <,yio 3i Greg BowdisP � lot* tONAI - M M PROGRESSIVE ENGINEERING & CONSULTING LLC 404 IMMIGRANT TRAIL wINDSOR C080550 (970)590-6059 April22 2010 J&J Construction of Northern Colorado 7251 W 20' Street Bldg L Suite 200 Greeley CO 80634 RE Slab Reinforcement Inspection 2238 Ballard Lane Maple Hill Subdivision Fort Collins CO Job No 09 004 Gentlemen As requested I inspected the reinforcing steel for the interior concrete slabs for the subject property on April 8 2010 Based on visual inspections it is my opimon that the reinforcing steel for the interior slabs was installed in substantial conformance with the design drawings prepared for this structure Please give me a call if you have any questions or if I may be of further assistance p�P�� RE Sincerely E G/,plfs Bp F a 4� 0pP iy� O a s P /� z Greg Bow di h E s, `�S►ONAt`E�r'\+P�