Loading...
HomeMy WebLinkAbout581 Ebon Pica St - Disclosures/Air Sealing - 05/14/2011BURMING LEAKAGE TEST Date of Test MUM 1 Technic: Sants EneW Scoring, Sara Dawson Test Flee:-W Ebon Pika Customer. / Anchor Development Buld.ngAd&em 581 Ebon PNq Fort CoikM 00 W5221 Fort C 1ins, 00 80526. Phone Test Results 1. Airliner at 50 Pascals: :l261. ( *1- 0.2 %) (50 Pat = 0.2 w.c.) 4.88 AEI Z 103kapArow. 166.7 .irf2.( +I-1. 3 %►) C .010 P$ 102.1 ln2 (4p 2,1 %} L 13L ELA 0 4 Pa 3. Minneapolis Lsalcage Ratio. 0.00 C"M per W swiace area 4. Building Le~ CufW. .. Flaw Coeffkient (C) .=181.0 (+F 3.3 %) rt(n#--PA 16 (41 a0M ) Convistion t:oeifxlerrt = 0.99M 5. Test ems: Test Stand ard: = CGSB Test : = Pin Equipmens = Model 3 Aftumapolis Blamer Door, SIN MOM hdRmtion Estimates 1. Estknatad Average Annual Infiltration Rates 2- EsWrmded Design Wiltiabon'Fa;e: iRfitt�er: 164A C'FM 0.60 ACH Sumner 77.7 C.FM 0.30ACH 0 BUILMNG i.EMA E TEST Pate 2 Date of Test 06/14/2011Teri File: WE Ebon Piika BaeIN" Condit loraa3 Inside Temperature: 68 deg F Heating Fusk Gas Outside Temperatige: 50 deg F . Fuel Cost # of stories 2.0 Heating Y Heating Degree Days: 60,20 Wind Shlekt H Coolng Fuel Cost . # cf occupants 20 Coof>ng SEE Coo"Doiree DaWs: 287. # of Bps 2.0 Volume: 16600 it3 Vey Weaffw Factor 0.87 Surface Ame: Enemy Graft Favor: 17.0 Fk=Acea: Design Winter WIW Speed 9.0.rnph VWgn erTis p DjW. iO .deg F Design Summer 1llEind Speed: 7.0 mph Design Summer Temp Dift: 18 deg F � �o v� q9 BUNLEi11rtG LEAKWIE TEST Page 3 Date of Test m4/Z011 Test Fle: 5WEbon Pica DAm PohMW Dana EndEkiUmg ue�l Norrftiad Tie Farr Pressure MOMW Pressure (Pa) (PS) Flow FbN %- Error Gonftxafti Fad B SW Dev (Pa) Q:0 Na +/- 0.00 59.0 55.0 4341 1355 -0.3 i" A 54:0 51.0 1293 1316 0.5 Ries A 46.6 43.0 1100 1211 0.1 RingA 41.0 38.0 1120 1140 -0.2 "A 37.0 34.0 1061 1 -0.6 R.mg A 31.0 29.0 982 999 0.5 Ring A +� 0.� 0.0 We