Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
4720 Prairie Vista Dr - Special Inspections/Engineering - 02/17/2011
W[a12MS S E1SS0C2EITl2S STRUCTURAL E N G I N E E R S February 17, 2011 Dennis Branjord 6661 Kilimanjaro Drive Evergreen, Colorado 80439 Re: High Strength Bolted Connections Observation Lot 43, Harmony Ridge,{ Fort Collins, Colorado "�'7-�® �� I J�� 067- � DFV ,� Project No. 210106 Gentlemen: On February 17, 2011, a representative of Weeks & Associates observed the high strength bolt connections at the referenced site. Observations indicate bolted connections for the base and cap plates at the HSS4X4X3/16 steel column in the basement are in substantial accordance with the engineered plan for the project by Weeks & Associates. In addition, the web stiffeners at each side of the steel beam over the steel column are in place. If we can be of further assistance please contact us. Sincerely, Weeks & Associates, Inc. Review d ©4p,D0•REG/STF9 T lip 2:12 h? -1 Ifonso J. Rivera ary G. e P.E.••' G^� Staff Engineer ructural Eigtrtr±F�� 4700 South College Ave, Suite 1, Fort Collins, CO 80525 Phone (970) 225.2422 - Fax (970) 225.2622