HomeMy WebLinkAbout2127 Cocklebur Ln - Special Inspections/Engineering - 08/12/20092structural
Engineering
1329 East Seventh Street Loveland Coloiado 80937
August 12, 2009 Office (970) 663-6016 Fax (970) 622-9324
Jamestown Builders, LLC
3003 East Harmony Road, 41h Floor
Fort Collins, CO 80528
Foundation Reinforcement Observation
Lot 13, Block 9, Sidehill Subdivision
2127 Cocklebur Lane
Fort Collins, Colorado
Project Number 09-14-032-32
Dear Mr Everitt
On August 7, 2009 this office visited the site referenced above to observe the foundation wall
reinforcement size, and location and to confirm the dowel spacing in foundation forms The
reinforcement appeared to be in general compliance with the foundation drawing and details by
T2 Structural Engineering, project number 09-14-032, dated June 19, 2009
There were two Ufer bars, one on each side of the foundation The east Ufer bar was located
approximately six feet towards the south of the front garage wall The west Ufer bar was located
approximately five feet towards the south of the front full -height basement wall The Ufer bars
were lapped and tied to the continuous bottom row of reinforcing steel
Protect freshly placed concrete from temperatures that will compromise the design strength of
the concrete Concrete placement and reinforcement is to be installed in accordance with ACI
318 and the 2006 IRC
Please contact this office if there are questions, or additional information that is required Thank
you for the opportunity to work with you on this project
Sincerely,
��
Russ Zoetewey, E I T
Susan Tagg, P
Enclosures
2structural
Engineering
1 ';29 East Seventh Sheet Loveland Coloiado 80937
Office (970) 663-6016 Fax (970) 622-9ri24
July 29, 2009
Jamestown Builders, LLC
3003 East Harmony Road, 4th Floor
Fort Collins, CO 80528
Footing Observation
Lot 13, Block 9, Sidehill Subdivision
2127 Cocklebur Lane
Fort Collins, Colorado
Project Number 09-14-032-31
Dear Mr Everitt
On July 29, 2009 this office visited the site referenced above to observe the footing form widths,
depths, and reinforcement The continuous and isolated footing widths and depths were in
general compliance with the foundation drawing by T2 Structural Engineering, project number
09-14-032, dated June 19, 2009 The reinforcement for the interior pad was tied and placed in
the footing The dowel reinforcement was on site and the spacing will be confirmed with the
foundation wall observation
Protect freshly placed concrete from temperatures that will compromise the design strength of
the concrete Concrete placement and reinforcement is to be installed in accordance with ACI
318 and 2006 IRC
Please contact this office if there are questions, or additional information that is required Thank
you for the opportunity to work with you on this project
Sincerely,
llL 2 9 20
Susan Tagg, P E
Enclosures
2structural f'cl ° Z)g57
Engineering
1329 East Seventh Street Loveland Coloiado 80937
August 12 2009 Office (970) 663 6016 Fax (970) 622 9324
Jamestown Builders, LLC
3003 East Harmony Road 4th Floor
Fort Collins CO 80528
Perimeter Drain and Damp -proofing Observation
Lot 13, Block 9 Sidehill Subdivision
2127 Cocklebur Lane
Fort Collins Colorado
Project Number 09 14-032 33
Dear Mr Everitt
On August 11, 2009 this office visited the site referenced above to observe the perimeter dram
and the damp proofing of the exterior foundation walls that retain earth and enclose habitable or
usable spaces located below grade The perforated pipe was bedded in gravel, with building
paper over the pipe A sump pump was located on the interior side of the foundation walls The
exterior perimeter dram pipe should dram towards and be connected to the subdivision under
dram
The damp proofing appeared to adequately cover the foundation walls The damp proofing
application is used to help reduce moisture that can permeate through the foundation wall
Damp proofing is effective in the absence of hydrostatic pressure and cracks in the foundation
It is important to keep vegetation that requires watering out of the backfill area of the foundation
excavation
Please contact this office if there are questions, or additional information that is required Thank
you for the opportunity to work with you on this project
Sincerely,
Russ Zoetewey, E I T