Loading...
HomeMy WebLinkAbout2227 Cocklebur Ln - Special Inspections/Engineering - 04/22/20092 Structural Engineering 1 329 List Seventh tiheel Wvel i ni i-olot nio 80q';7 Office (970) 663 C01( Fax ( )70) 622 9324 April 22, 2009 Jamestown Builders, LLC 3003 East Harmony Road 41h Floor Fort Collins CO 80528 Perimeter Dram and Damp -proofing Observation Lot 22 Block 9, Sidehill Subdivision 2227 Cocklebur Lane Fort Collins, Colorado Project Number 09-14-003-33 Dear Mr Event On April 22 2009 this office visited the site referenced above to observe the perimeter drain and the damp -proofing of the exterior foundation walls that retain earth and enclose habitable or usable spaces located below grade The perforated pipe was bedded in gravel with building paper over the pipe The perimeter drain pipes were connected to a sump pump located inside the foundation ,Nalls The damp -proofing appeared to adequately cover the foundation walls The damp -proofing application is used to help reduce moisture that can permeate through the foundation wall Damp -proofing is effective in the absence of hydrostatic pressure and cracks in the foundation It is important to keep vegetation that requires watering out of the backfill area of the foundation excavation Please contact this office if there are questions or additional information that is required Thank you for the opportunitv to work with you on this project Smcerel} Q'I pp —Ar44 td6A, ( h Gr Susan Tagg, P E 40343 Z4PR 2 2 200� Enclosures ".'vo yk 2Structural' Engineering 192a East tieventh Meet Loveland L0101ado 80S,7 Office (370) GG, GOIG Fax ()70) 622 9124 April 14 2009 Jamestown Builders LLC 3003 East Harmony Road, 4`h Floor Fort Collins, CO 80528 Footing Observation Lot 22 Bloch 9 Sidehill Subdn ision 2227 Cocklebur Lane Fort Collins Colorado Project Number 09-14-003-31 Dear Mr Event On April 1 3, 2009 this office visited the site referenced above to observe the tooting form widths depths and reinforcement The continuous and isolated footing "iidths and depths were in general compliance with the foundation drawing by T2 Structural Engineering project number 09-14-001, dated April 1 2009 The reinforcement for the interior pad was tied and ready to be placed in the tooting The dowel reinforcement was on site and the spacing will be confirmed with the foundation wall observation Protect freshly placed concrete from temperatures that will compromise the design strength of the concrete Concrete placement and reinforcement is to be installed in accordance with ACI 318 and 2006 IRC Please contact this office if there are questions or additional information that is required Thank you for fhe opportunity to work with you on this project Sincerely OQ00 Llgs,I, c Susan Tagg P E 40343 PR 1 4 200.? EnclosuresIc` E No Text No Text No Text