HomeMy WebLinkAbout2503 Milton Ln - Correspondence/Water and or Sewer - 08/05/2009N° 011109
8/3/09 Called In
8/4/09
Requested for
3 P
INSPECTION TUESDAY A.M.
OWNER
SERVICE ADDRESS
OWNER ADDRESS
SANITARY SEWER SYSTEM
2503 ',4ILTON LN
❑ SERVICE CALL
REASON FOR CALL:
❑ LOCATE (If Locate is for new service
CONTACT JEFF/JwJ EXCAVATING
PHONE 590-7140
❑ WORK ORDER
line construction, read notes for inspection below)
Saddle Set
Stub Out Used
REASON FOR LOCATE:
Reasonable effort has been made to accurately locate the center of Boxelder Sanitation District sewer lines in the vicinity
of the service address as requested and these have been marked on ground surface with green paint. The sewer location
markings represent approximate horizontal location of the sewer (accurate to within 18 inches in either direction). Depth
is estimated to be . Always use caution when excavating
near any utility, and expose pipes so that pipes are not damaged and pipe bedding disturbance is minimized.
`Q O.K. TO BACKFILL Date_ 9 9 BSD Initial In
EJ NEW SERVICE INSTALLATION INSPECTION
NOTE:
1. Connection to sanitary sewer collection system cannot be made until System Development Charge is paid to the District;
2. District saddle set charge includes labor, equipment, and tap saddle connector to drill the collector line and fasten the saddle
connector to the collector line. Permittee may NOT, under any circumstances, attempt to penetrate main collector lines or
manholes without the consent of the BSD Construction Supervisor;
3. Locator wire is required for burial along the service line for future locating of the line;
4. Permittee shall provide all excavation, shoring, dewatering, service line materials and labor for installation of service line
to main connection, and backfill as required by the District, Federal and State OSHA requirements, and applicable Building
and Plumbing Codes. No excavation, shoring, dewatering, or backfill work will be done by the District, and the Manager or his
agent will require any additional excavation, shoring, or dewatering of the excavated space that in his judgement alone is necessary
before adequate inspection may be accomplished and approval of the service line installation is granted;
5. The District requires that all service lines be installed such that future use of the service line will not contribute inflow or infiltration
of groundwater to the collection system due to improper connections, grades, bedding materials or placement, or pipe material. The
District will require correction of any improper connection through its enforcement authority;
6. Permittee shall notify the District at least 48 hours prior to when the service line is expected to be installed and ready for inspection
and connection;
7. The District shall not be subject to any liability for any deficiency or defect of service line materials or installation which is not
discovered by inspection nor shall owner or permittee be absolved from liability for any deficiency or defect of service line materials
or installation and any resulting damage or from responsibility to correct such deficiency or defect. The District does not assume any
obligation nor acquire any liability for personal injury to any party or damage to the connecting property or any portion thereof caused
by or resulting from any such connection to the wastewater collection and treatment system;
8. The District requires payment of a $50.00 construction inspection charge for this inspection.
Type of Pipe: S >? ? r Pipe Bedding Material: S (!) 06c;e-, 6-,
Installation Satisfactory? V— Elder Valve Satisfactory: X Pipe Slope Adequate? _X(
Pipe Bedding Satisfactory? Locator Wire Properly Placed? x Backfill Satisfactory? Y,
Inspected by: —ZA3' Date
for Boxelder Sanitation District
O.K. TO ISSUE CERTIFICATE OF OCCUPANCY Date � r BSD Initial
By si � I acknowledge having read and understood the forgoing and ac nowledge receipt of a copy of this form.
Received by: Date
3201 E. Mulberry, Unit Q • P.O. Box 1518 • Fort Collins, Colorado 80522
Phone (970) 498-0604 • Fax (970) 498-0701