Loading...
HomeMy WebLinkAbout5968 Snowy Plover Ct - Special Inspections/Engineering - 03/28/2004PLAZAENGINEER'S FIELD REPORT Report Date: April 2, 2004 ENGTNEEMG Report No.: 5 Project: Liberty Homes, Inc. "The Hopewell" residence Location: 5968 Snowy Plover Court, Lot 22, Swift Addition to Fossil Lake Ranch P.U.D., Fort Collins, Colorado. Builder: Liberty Homes, Inc., Loveland, Colorado (Jim Kelly) Permit No.: B0400438 Subject: Foundation Damp Proofing and Perimeter Drain System Date: March 28, 2004 (2:00 pm) Weather: Seasonal OBSERVATIONS Sprayed on foundation damp proofing was noted as being applied to the exterior of all foundation walls adjacent to below grade interior spaces. This damp proofing appeared to be consistent and uniform. Noted the presence of flexible perforated drainpipe surrounding the perimeter of the foundation. Segments appeared to be properly jointed and attached, with a connection to an interior sump pit. Observations were made prior to the placement of the gravel bed and any backfill. FIELD INSTRUCTIONS GIVEN Complete the installation of the perimeter drain system (i. e., gravel bed andfabric) in accordance with the detail provided in the foundation plan for this residence. Field Report by: cc: F. Plaza, V nt PLAZA ENGINEERING CONSULTANTS, INC. P.O. Box 1002 Loveland, CO 80539-1002 (970)-227-0015