Loading...
HomeMy WebLinkAbout5968 Snowy Plover Ct - Inspection Results - 09/14/2004Building and Zoning Department 281 N. College Ave. Fort Collins, CO 80524 970/221-6760 INSPECTION OF RADON MITIGATION SYSTEM IN NEW CONSTRUCTION HIRED BY __4 INSPECTOR _ ADDRESS OF I IN r e .. ry��- Codes: Pass = ✓ Fail = O Nnt nnnlirahlp =NA INSPECTION #1 TYPE OF FOUNDATION crawl space -b INSPECTIONS #2 and #3 SYSTEM APPROVED: YES NO ,, ��% �,G �✓ DATE. T COMPONENTS V Sealing of openings, penetrations, joints '�asement perforated floor vent pipe slab on grade 'PVC radon vent pipe A* diffusion retarder membrane Commen+Q TYP�,OF SYSTEM BEING INSTALLED Passive sub -membrane system Active sub -membrane system Passive system -sub slab Active system - sub slab combined radon system �Gmembrane sealed to wall & fixtures ✓PVC pipe sealed at all penetrations connections Firewall sleeves installed :Z'System labeled inside and outside -1,GSystem accessible for repair or stallation of fan V*4 trical connections for fan COMP ENTS - sub slab/ basement ermination of system meets je'4 inches aggregate or perforated pipe or collection mat ndard corrosion resistant screen at end of discharge pipe ('% to openings) diffusion retarder (not required Ww re sealing has occurred) tee fitting A44ran properly installed outside living pace anometer or other US EPA jZ5"erforated vent pipes (min. 10 ft.) approved monitoring device installed Make-up air vents a.cr% i irm m i rvn: r, the unaersignea inspector, certify that to the best of my knowledge and professional ability, I have inspected the above -described radon mitigation system and have found it to be installed in accordance with the building standards set forth in Section 1210 of the Building Code of the City of Fort Collins, unless otherwise specifically noted above. This certification does not extend to any conditions resulting from subsequent acts or omissions of the building contractor, owner, or other persons in connection with the installation, operation, or maintenance of such radon mitigation system. SIGNATURE OF INSPECTOR �t�DATE��—�— White - Building Inspection Yellow - Inspector Pink - Customer Gold -Natural Resources