Loading...
HomeMy WebLinkAbout6462 Tilden St - Disclosures - 08/21/2003 (2)EFoftollins Residential Energy Code ANICAL DISCLOSURE FORM ma,d�2.� _�noraa Job Address: �y14 General contractor. Mechanical contractor: the building & zoning dept. of Community Planning and Environmental Services 281 N. College Ave., • P.O. Banc 580, Fort Colrms, CO W522 V0ice: 970 2216760 FAX 970 224 6134 INSTRUCTIONS This disclosure form is to be signed by the mechanical contractor or representative of the e Please ..type _or._print, -except .for _the signature... If there -are multiple systems -serving any -function, make -multiple entries to describe general contractor. One co p py of this form must be Provided to the Building and Zoning pea them. One copy of this form must be made available to the original home buyer►tmenf prior to the C.O. A. Space heating system 0. space cooling system 1L­ water heating system "p14' I !nerov ! Storage k — AAA# Certification - IlWe certify that the above -listed equipment (including ducts and Piping) in conformance with the requirements of the Fort Collins Residential Energy Code and Mechanical Code; and further, that was installed in the building at the above locations such equipment was installed in accordance with manufacturers, instructions. Person Certifying Sianatitm. US B- Ad�: Ynone: 5'rl cD