HomeMy WebLinkAbout626 Linden St - CO/LOC/Other - 11/26/2002City of Fort Collins
Temporary Certificate of Occupancy
City of Fort Collins Permit #: B0201600
This is to certify that the building, structure, or land located a 626 LINDEN ST
Fort Collins, CO has been inspected and temporary occupancy is hereby authorized, effective 11/26/2002
and conditional upon the following requirements being completed and approved upon final inspection.
BUILDING INSPECTION Requirements to be Completed By:
1-5-03
11/22/2002 TCO FOR 45 DAYS WITH COMPLETION OF EXTERIOR BLDG LIGHTS, SITE LIGHTING AND
VERIFICATION OF 2 60min DOORS AT SHOP AREA
WATER WASTEWATER IRRIGATION Requirements to be Completed By: 12 -1 q - 0 2-
11/26/2002 Ok for TCO untill 12/14/02
ZONING Requirements to be Completed By: (? - 2 4O i�14?�(,t�C�
11/22/2002 OK FOR TCO WITH CONDITIONS: 1) INSTALL BIKE RACK AND FLAGPOLE, 2) COMPLETE
FENCING, 3) COMPLETE FINAL LIFT OF ASHPALT - ALL BY 12-24-02.
POUDRE FIRE AUTHORITY Requirements to be Completed By: 1 2 - 2-4 -'0 2
11/25/2002 30 day for phone lines
ENGINEERING Requirements to be Completed By:
11/26/2002 TCO pending receipt of mylars and Pavement section per Dave Burke.
If such work is not completed within the time set forth above and approved on final inspection, or unless the time for
completion is extended by the Building and Zoning Office, an order to vacate the premises, or a violation notice for
occupying the building, structure, or land without a Certificate of Occupancy will be issued. Such violation is subject to
a maximum fine of $1000.00 per d y for every day of violation.
`/ y 1(- -7- C, o z.
Contractor/Owner/Lessee Date
Authorized By Date of Issuance
NOTE: The issuance of this temporary certificate of occupancy will entitle the owner to place City Utility service in
the owner's name. Construction power rates may be substantially higher than the rate to which the owner
is entitled. Until the owner contacts the City Utility Office and makes the necessary arrangements to
transfer City Utilities to the owner's name, utilities will continue to be furnished at construction rates and
both the owner of the property and the contractor will continue to be liable to the City for all utility bills.
11/26/2002 3:36:56 PM