HomeMy WebLinkAbout1421 Catalpa Ct - Inspection Results - 06/23/2004Building and Zoning Department
281 N. College Ave. y/ ��`
Fort Collins, CO 80524
970/221-6760
City of Fort Collins
INSPECTION OF RADON MITIGATION SYSTEM IN NEW CONSTRUCTION
HIRED BY PHONE"
INSPECTOR CQRMC #
ADDRESS OF INSPEC ~Z- ------ZIP
f1La_ Z�
BUILDER/CONT J PHONE
ADDRFSS 3
CITY
ADDRESS
CITY
STA
OME1r�
Lei ill I �.druffr�a
STATE 6-42 SIP
Codes: Pass = ✓
Fail = O Not applicable =NA
INSPECTION #1
INSPECTIONS #2 and #3
SYSTEM APPROVED:
COMPONENTS
YES
TYPE OF FOUNDATION
Sealing of openings, penetrations,
NO
rawl space
joints
DATE
basement
_ _perforated floor vent pipe
slab on grade
_ _4" PVC radon vent pipe
Comment
diffusion retarder membrane
TYPE OF SYSTEM BEING INSTALLED
membrane sealed to wall & fixtures
Passive sub -membrane system
PVC pipe sealed at all penetrations
Active sub -membrane system
& connections
Passive system - sub slab
Firewall sleeves installed
labeled inside
::OSystem
Active system - sub slab
ystem and outside
combined radon system
accessible for repair or
installation of fan
-electrical connections for fan
COMPONENTS - sub slab/ basement
1' termination of system meets
4 inches aggregate or perforated
standard
pipe or collection mat
corrosion resistant screen at end of
diffusion retarder (not required
discharge pipe (Y.to'/ openings)
where sealing has occurred)
fan properly installed outside living
tee fitting
space
Manometer or other US EPA
perforated vent pipes (min. 10 ft.)
approved monitoring device installed
Make-up air vents
CERTIFICATION: 1. the undpr_cinnod
42- a_ ate_ 7- _ _�
have inspected the above -described radon mitigation system and have found it to be installed iineaccordance ssional iw th
the building standards set forth in Section 1210 of the Building Code of the City of Fort Collins, unless otherwise
specifically noted above. This certification does not extend to any conditions resulting from subsequent acts or
omissions of the building contractor, owner, or other persons in connection with the installation, operation, or
maintenance of such radon mitigation system.
SIGNATURE OF INSPECTOR DATE �-
White - Building Inspection Yellow - Inspector Pink - Customer Gold - Natural Resources