Loading...
HomeMy WebLinkAbout1421 Catalpa Ct - Inspection Results - 06/23/2004Building and Zoning Department 281 N. College Ave. y/ ��` Fort Collins, CO 80524 970/221-6760 City of Fort Collins INSPECTION OF RADON MITIGATION SYSTEM IN NEW CONSTRUCTION HIRED BY PHONE" INSPECTOR CQRMC # ADDRESS OF INSPEC ~Z- ------ZIP f1La_ Z� BUILDER/CONT J PHONE ADDRFSS 3 CITY ADDRESS CITY STA OME1r� Lei ill I �.druffr�a STATE 6-42 SIP Codes: Pass = ✓ Fail = O Not applicable =NA INSPECTION #1 INSPECTIONS #2 and #3 SYSTEM APPROVED: COMPONENTS YES TYPE OF FOUNDATION Sealing of openings, penetrations, NO rawl space joints DATE basement _ _perforated floor vent pipe slab on grade _ _4" PVC radon vent pipe Comment diffusion retarder membrane TYPE OF SYSTEM BEING INSTALLED membrane sealed to wall & fixtures Passive sub -membrane system PVC pipe sealed at all penetrations Active sub -membrane system & connections Passive system - sub slab Firewall sleeves installed labeled inside ::OSystem Active system - sub slab ystem and outside combined radon system accessible for repair or installation of fan -electrical connections for fan COMPONENTS - sub slab/ basement 1' termination of system meets 4 inches aggregate or perforated standard pipe or collection mat corrosion resistant screen at end of diffusion retarder (not required discharge pipe (Y.to'/ openings) where sealing has occurred) fan properly installed outside living tee fitting space Manometer or other US EPA perforated vent pipes (min. 10 ft.) approved monitoring device installed Make-up air vents CERTIFICATION: 1. the undpr_cinnod 42- a_ ate_ 7- _ _� have inspected the above -described radon mitigation system and have found it to be installed iineaccordance ssional iw th the building standards set forth in Section 1210 of the Building Code of the City of Fort Collins, unless otherwise specifically noted above. This certification does not extend to any conditions resulting from subsequent acts or omissions of the building contractor, owner, or other persons in connection with the installation, operation, or maintenance of such radon mitigation system. SIGNATURE OF INSPECTOR DATE �- White - Building Inspection Yellow - Inspector Pink - Customer Gold - Natural Resources