Loading...
HomeMy WebLinkAbout630 S Meldrum St - Special Inspections/Engineering - 07/04/200307/06!2003 19:59 FAX 307 433 8931 DOUGLAS COATES & ASSOC 9 001 =PQM -: P--6ert D. Clary P. E. P. C. F'GX NO. :1-307-E34-6067 Jul. 04 2003 03: 58PM PV July 4, 2003 Douglas L. Coates, Arch Doug Coates & Associates P.D. Box 2653 Cheyenne, Wyoming 82003 &east D. Clawe !-M Px- AM- �� .Re: Fort Collins InSfitkc LDS Church - Fi justments to framing and nailing Deer Doug: ^ At our field iwPccthm on July 1, 201'.13, a framing item were discussed with the contractor concerning the column wrP as indicated on Section F /A? and note relating to the support of H3 headers on sheet 1,42. Field conditios,;s provide a revision to butt the 2x 129 into the column, and support the headers from beneath wii'h a double 2x6 column wrap. The ceiling support for the 2olx3�or- can be attached to the 2'lx12s with conventional henmers. On July 7. we discussed the nailing 'on apt sr:heduie +vi CarfFentcr Harold with Norse Constnu�on. The 3" nails called out in the $peciflc„rtions with penetrate the top flange about w inch. I have Harold to use 2 'W - 0.131" Ma nails on the revised spacing. 6" spacing reduces to 5" ff," gpacing is reduced to 10 % " and at,n spacins redoces to 3 V.-, ' If y"ve any questions please give me a call. Robert D. Clary, P.E. P.C. 22045 LDS Ft Collins Framing PWI.i -g . 3