Loading...
HomeMy WebLinkAbout3420 Copper Spring Dr - Inspection Results - 06/22/2003Building and Zoning Department 281 N. College Ave. Fort Collins, CO 80524 970/221-6760 HIRED BY —,GI INSPECTOR, ADDRESS OF INS PHONE BUILDER/CONT PHONE ADDRE S CITY ,(tg4,44Ae6 STATE e5ye--) SIP RADON SYSTEM INSTALLPHONE AnnRFRR CITYtSTATE 71P .TIA Codes: Pass = ✓ Fail = O �f City of Fort Collins Not applicable =NA INSPECTION #1 INSPECTIONS #2 and #3 CRONENTS q�K-o3 SYSTEM APPROVED: YES NO TYPE OF FOUNDATION crawl space basement Sealing of openings, penetrations, joints p�erforated floor vent pipe DATE slab on grade jC_a" PVC radon vent pipe diffusion retarder membrane Comments TYPE OF SYSTEM BEING INSTALLED Passive sub -membrane system Active sub -membrane system Passive system - sub slab Active system - sub slab combined radon system COMPONENTS - sub slab/ basement l_,"membrane sealed to wall & fixtures PVC pipe sealed at all penetrations & connections F'rewall sleeves installed System labeled inside and outside System accessible for repair or installation of fan electrical connections for fan termination of system meets �4 inches aggregate or perforated pipe or collection mat diffusion retarder (not required standard �zcorrosion resistant screen at end of discharge pipe (% to openings) YVAfan properly installed outside living Zhere sealing has occurred) space tee fitting Zperforated vent pipes (min. 10 ft.) anometer or other US EPA approved monitoring device installed Make-up air vents CERTIFICATION: 1, the undersigned Inspector, certify that to the best of my knowledge and professional ability, I have inspected the above -described radon mitigation system and have found it to be installed in accordance with the building standards set forth in Section 1210 of the Building Code of the City of Fort Collins, unless otherwise specifically noted above. This certification does not extend to any conditions resulting from subsequent acts or omissions of the building contractor, owner, or other persons in connection with the installation, operation, or maintenance of such radon mitigation stem. J SIGNATURE OF INSPECTOR DATE White - Building Inspection Yellow - Inspector Pink - Customer Gold - Natural Resources