Loading...
HomeMy WebLinkAbout2615 Saddle Creek Dr - Special Inspections/Engineering - 03/09/2004March 9, 2004 James Company 5433 Old Mill Road Fort Collins, Colorado 80528 Attn: Mr. Doug Bennet Project Manager @ Sage Creek Re: Exterior Perimeter Drain Observation Sage Creek Filing No. 1, Phase 4 2615 Saddle Creek Drive - Lot 3 Block 3 Fort Collins, Colorado Terracon Project No. 20025133 Irerracon 301 N. Howes • P.O. Box 503 Fort Collins, Colorado 80521-0503 (970) 484-0359 Fax: (970) 484-0454 A representative of Terracon observed the perimeter drain at the above referenced address on February 18, 2004, as requested. A four -inch diameter perforated PVC pipe underlain by a PVC impervious liner material had been placed around the exterior perimeter of the basement foundation. The drainage pipe appeared to exhibit positive drainage toward the sump pit located within the basement area. We also observed 3/4 to 1-inch washed gravel placed above and below the pipe and drainage filter fabric placed above the gravel. The waterproof dampening was also observed and in our opinion was uniformly applied to the exterior foundations. In our opinion the exterior perimeter drain was constructed in general accordance with the plans and specifications for this project. Sincere �vo: �y1JN•�,••lF o a ' I o. n • L. Wilsoh; ;:E. be6te�lmical Engineer Reviewed By: David A. Richer, P.E. Geotechnical Engineer/Department Manager Copies to: (3) Addressee Arizona ■ Arkansas ■ Colorado ■ Idaho ■ Illinois ■ Iowa ■ Kansas ■ Minnesota ■ Missouri ■ Montana Nebraska ■ Nevada ■ New Mexico ■ North Dakota ■ Oklahoma ■ Tennessee ■ Texas ■ Utah ■ Wisconsin ■ Wyoming Quality Engineering Since 1965