Loading...
HomeMy WebLinkAbout7351 Triangle Dr - Special Inspections/Engineering - 03/12/2004March 12, 2004 DR Horton, Melody Series 11031 Sheridan Blvd. Westminster, Colorado 80020 Attn: Mr. Corey Weaver Re: Foundation Footing Size and Wall Steel Observations Ridgewood Hills 3`d Filing 7351 Triangle Drive — Lot 170 Fort Collins, Colorado Terracon Project No. 20005162 Mr. Weaver: Irerracon 301 North Howes • P.O. Box 503 Fort Collins, Colorado 80521-0503 (970) 484-0359 Fax: (970) 484-0454 A representative of Terracon observed the interior and exterior footing sizes and wall steel reinforcement for the above referenced project on February 27 and March 2, 2004, as requested. Observations made during the foundation construction indicate that the interior and exterior footing sizes and wall steel placements were constructed in general accordance with the plans for this project. 'Ot„t„„ tln",r ,.,,R,EG," k.Sincerely, ' ��\ ���il ✓°�`��'�'__ TERRACON 0 26084 DTR.mbert, P.E. D g J. b E. Gneer Regional Manager Copies to: (2) Addressee (1) Mr. Brian Kelly — DR Horton, Melody Series Arizona ■ Arkansas ■ California ■ Colorado ■ Georgia ■ Idaho ■ Illinois ■ Iowa ■ Kansas ■ Kentucky ■ Minnesota ■ Missouri Montana ■ Nebraska ■ Nevada ■ New Mexico ■ North Carolina ■ Oklahoma ■Tennessee ■Texas ■ Utah ■ Wisconsin ■ Wyoming Consulting Engineers & Scientists Since 1965 www.terracon.com