Loading...
HomeMy WebLinkAbout105 Coronado Ct - Special Inspections/Engineering - 03/13/2003Weeks & Associates, Inc. Structural Engineers March 13, 2003 Dohn Construction 2642 Midpoint Drive, Unit A Fort Collins, Colorado 80525 Re: Cameron Office Park/ Lot 9, Fossil Creek Office Park 105 Coronado Court Fort Collins, Colorado Project No. 22540 Gentlemen: On February 26, 2003 Weeks & Associates observed perimeter drain at the referenced site. Observations indicate 4-inch diameter perforated pipe wrapped the walls of the above grade basement walls and sloped to the sump pit near the middle of the west side of the basement. The drain pipe installation is in substantial accordance with the perimeter drain recommendations for the project. If I can be of further assistance please contact me. Sincerely, Weeks & Associates, Inc. R i -d by. Connie J. chneider, E.I.T. iy G. W Staff Engineer i�ructural E CSv ••may by'' E23012 47 Weeks & Associates, Inc. 300 Boardwalk, Building 3, Unit D Fort Collins, CO 80525 (970) 225-2422