Memo
Ta Shaun Moscrip
rnwm Michael P. Welenc
CQ Pile
Dato 3/30/2004
Ro Lincoln Center HVAC Project
`{ir7 0. MaSrtc I, (k SX
44
Shaun: 4 I I t A-C Pe (4 C e " P ri--&
I conducted a final construction observation visit at the Lincoln Center and had access to the areas
where electrical work took place.
The electrical installation followed the Construction documents very closely. All the materials were
installed per the construction documents.
The work was accomplished in a neat and workmanlike manner.
I recorded no items that would require the further attention of the electrical contractor.
Michael Welenc
Project Manager
Electrical Systems Consultants, Inc.